Denmark

Denmark, Ringby - dk/28

Light rail

COWI A/S of Kongens Lyngby secured the L50001 Roads contract, including roads, road traffic management pre/during/post construction, bridges and tunnels, and utility diversions technical proposals and developing the Lyngby-Ishoj Ring 3 light rail project design from feasibility to construction tender. Contact Metroselskabet I/S, attn Mikkel Kjaer Jensen, Copenhagen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=145266-2014. 18/14.



Permalink

Cowi A/S of Kongens Lyngby secured the contract for areas and rights consulting services for the design work on Ring 3 light rail from Lyngby to Ishoj with 27 stations on 27 km-long route. Contact Arne Steen Jacobsen at Ring 3 Letbane I/S in Copenhagen, tel +45 72424581, e-mail asj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=372827-2014. Ref.n. LR3CS5. 45/14.



Permalink

Denmark, Hovedstaden - dk/25

Sewer

Closing Date: 07.07.2011 (Tender Closed)

Restricted invitation to tender, deadline 07.07.2011, for construction of 1.1 km-long sewer, depth 10-15 m at Helsinge, in Gribskov municipality. Contract duration 18 months. For more, contact Mrs Linda Saederup, COWI A/S, Lyngby, tel +45 45972211, e-mail lisp@cowi.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175272-2011. 23/11.



Permalink

Invitation to tender using restricted procedure, deadline 07.07.2011, for construction of 1.1 km-long, 2.5 m-diameter sewer at 10-15 m depth with 1.6 m-diameter shafts, pumping station and minor sewers. Contract duration 18 months. Further information, specs and docs from Linda Saederup at COWI in Lyngby, tel +45 45972211, e-mail lisp@cowi.dk to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175272-2011. 23/11.



Permalink


COWI A/S from Lyngby secured the EUR1.35 million (DKK10 million) contract, excluding VAT, for consultancy services on a hydraulic and regulatory processes associated with a storm water tunnel project, which is 8 km in length, and runs through Northern Copenhagen, Frederiksberg, Southern Gentofte and Southern Gladsax. Contact HOFOR A/S, att.n Ida Sylvest, Copenhagen, tel +45 27953222, email idsy@hofor.dk. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=284880-2016. 33/16. 



Permalink

COWI A/S from Kongens Lyngby secured the EUR10.76 million (DKK80 million) contract, excluding VAT, for  the technical consultancy services in connection with the 8 km storm water tunnel project through Northern Copenhagen, Frederiksberg, Southern Gentofte and Southern Gladsaxe. Contact HOFOR Spildevand København A/S, attn Lise Dalsgaard Hansen, Copenhagen, tel +45 27953817, email lidh@hofor.dk.  Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=378734-2016. Ref.n. 24.02-01872. 44/16. 



Permalink

Denmark, Copenhagen - dk/24

Railway

Atkins Danmark A/S from Copenhagen, COWI A/S from Kongens Lyngby, NIRAS A/S  from Allerod  and Ramboll – Transport – Bane from Copenhagen  secured the 4 parallel framework agreements on technical advice and assistance in connection with operation and maintenance, reinvestment and procurement of Sund & Baelt Group's railway technical facilities and general  structures, for a total value of EUR82.43 million (DKK660 million), excluding VAT.

The S&B Group's facilities consist of the Oresund Link's onshore facility (the Oresund Motorway, the Oresund Railway and stations on the Oresund Railway), the fixed link across Storebael t (the East and West Bridge, the East Railway Tunnel and Payment Facility), Sprogo and four port facilities. S&B also owns and finances through the Fehmarn Landanlæg A / S the Ringsted-Fehmarn railway, which is expected to be partially commissioned in 2021. The 4 contracts are on the following  4 major projects that S&B plans for, but other major projects may be added during the framework agreements duration:

New Kastrup Station, Preliminary investigations into a Kattegat connection, Project on safety and accessibility on the Storebaelt link, ANPR (automatic number-plate recognition) Enforcement System. Contact Sund & Baelt Holding A/S, attn  Charlotte Yun Linde, Copenhagen, email cyl@SBF.DK.For tender documents please click here 05/20.



Permalink

Denmark, Railway - dk/21

Countrywide

Atkins Danmark A/S from Copenhagen, COWI A/S from Kongens Lyngby, NIRAS A/S  from Allerod  and Ramboll – Transport – Bane from Copenhagen  secured the 4 parallel framework agreements on technical advice and assistance in connection with operation and maintenance, reinvestment and procurement of Sund & Baelt Group's railway technical facilities and general  structures, for a total value of EUR82.43 million (DKK660 million), excluding VAT.

The S&B Group's facilities consist of the Oresund Link's onshore facility (the Oresund Motorway, the Oresund Railway and stations on the Oresund Railway), the fixed link across Storebael t (the East and West Bridge, the East Railway Tunnel and Payment Facility), Sprogo and four port facilities. S&B also owns and finances through the Fehmarn Landanlæg A / S the Ringsted-Fehmarn railway, which is expected to be partially commissioned in 2021. The 4 contracts are on the following  4 major projects that S&B plans for, but other major projects may be added during the framework agreements duration:

New Kastrup Station, Preliminary investigations into a Kattegat connection, Project on safety and accessibility on the Storebaelt link, ANPR (automatic number-plate recognition) Enforcement System. Contact Sund & Baelt Holding A/S, attn  Charlotte Yun Linde, Copenhagen, email cyl@SBF.DK.For tender documents please click here  05/20.



Permalink

Denmark, North Zealand - dk/20

Road

Open call for bids, deadline 12th February, 2008 for technical engineering, preparation of planning and risk analysis for the new Roskilde fjord crossing. The present and only link crossing the Roskilde fjord, which is situated between Frederikssund and Hornsherred, is a lifting bridge already heavily loaded. As the fjord at Frederikssund is at its narrowest, it is here that the easiest crossing from North Zealand to the Hornsherred peninsula can be made. Plans have been mooted for a second crossing, either a bridge or tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=302121-2007, OJ S 247, or contact Vejdirektoratet, Copenhagen, fax +45 33156335. E-mail vd@vd.dk. Also visit www.fjordforbindelse.dk/news.php and www.frederikssund.dk/media(1432,1030)/VVM-unders%C3%B8gelse_fjordforbindelse.pdf 02/08.Open call for bids, deadline 29th February, 2008 for preliminary design and environmental impact assessment (EIA) as well as architectural concepts for a number of different proposals for road bridges and tunnels for the second Roskilde fjord crossing in Frederikssund. Length of bridges and tunnels is approx. 0.8-2 km. The EIA phase is assumed to be finished by the end of 2009. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=17867-2008, OJ S 14, or contact Vejdirektoratet, Copenhagen, fax +45 33156335. E-mail vd@vd.dk 08/08.COWI signed a DKK7.9 million deal for technical engineering, preparation of planning and risk analysis for the second Roskilde fjord crossing, either a bridge or tunnel. Visit www.cowi.dk 20/08.



Permalink

Denmark, Oresund Strait - dk/18

Highway and Railway

Atkins Danmark A/S from Copenhagen, COWI A/S from Kongens Lyngby, NIRAS A/S  from Allerod  and Ramboll – Transport – Bane from Copenhagen  secured the 4 parallel framework agreements on technical advice and assistance in connection with operation and maintenance, reinvestment and procurement of Sund & Baelt Group's railway technical facilities and general  structures, for a total value of EUR82.43 million (DKK660 million), excluding VAT.

The S&B Group's facilities consist of the Oresund Link's onshore facility (the Oresund Motorway, the Oresund Railway and stations on the Oresund Railway), the fixed link across Storebael t (the East and West Bridge, the East Railway Tunnel and Payment Facility), Sprogo and four port facilities. S&B also owns and finances through the Fehmarn Landanlæg A / S the Ringsted-Fehmarn railway, which is expected to be partially commissioned in 2021. The 4 contracts are on the following  4 major projects that S&B plans for, but other major projects may be added during the framework agreements duration:

New Kastrup Station, Preliminary investigations into a Kattegat connection, Project on safety and accessibility on the Storebaelt link, ANPR (automatic number-plate recognition) Enforcement System. Contact Sund & Baelt Holding A/S, attn  Charlotte Yun Linde, Copenhagen, email cyl@SBF.DK.For tender documents please click here.05/20.



Permalink

Denmark, Aarhus - dk/17

Road


Cowi A/S from Lyngby have secured the EUR2.14 million (DKK15.96 million) contract, excluding VAT, for an environmental impact assessment and an environmental impact report for the construction of a 1.8km tunnel under Marselis Boulevard in Aarhus municipality.  Contact Vejdirektoratet, attn René Juhl Hollen, Copenhagen, tel +45 72442047, email rhp@vd.dk. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213352-2022. Ref.n. PA-VMA.R017. 17/22.



Permalink

Denmark, Copenhagen - dk/16

Heating

  Negotiated procedure, deadline 7th April, 2003 for consultancy and construction services for a 4 km-long 4.5 m-diameter tunnel for district heating pipelines. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=042015-2003, OJ S 48, or contact Kí¸benhavns Energi, Copenhagen, fax +45 33952705. E-mail Astrid Birnbaum asbi@ke.dk 12/03. Cowi has won a contract worth around DKK22.5 million for consultancy and construction services for a 4 km-long 4.5 m-diameter tunnel for district heating pipelines. Visit www.cowi.dk 32/03.Negotiated procedure, deadline 22nd November, 2004 for construction of a 4 km 4.2 m-diameter bored tunnel and a 30 m-deep shaft, 15-25 m in diameter. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=176927-2004, OJ S 206, or contact Kí¸benhavns Energi, Copenhagen, fax +45 33952705. E-mail asbi@ke.dk 44/04.A joint venture of MT Hojgaard and Hochtief has signed a contract for the building of the 4 km-long 4.2 m-diameter Amagerví¦rket-Fredensgade heating tunnel in Copenhagen, to be built by TBM. The project also includes a 30 m-deep 15-25 m diameter shaft. Visit www.mthojgaard.com and www.hochtief.com 19/05.Negotiated procedure, deadline 16th June, 2006 for installation of electrical and mechanical equipment and approx. 30 km of pipe lines for district heating in a 4 km-long 4.2 m-diameter tunnel. The contract will be signed in December 2006. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=090318-2006, OJ S 85, or contact Kobenhavns Energi, Copenhagen, tel. +45 27952750. E-mail asbi@ke.dk 20/06.



Permalink

Denmark, South Zealand - dk/14

Motorway/railway

Femern A/S has prequalified five entities to participate in the bidding for a consultancy contract on E&M systems in the Fehmarnbelt tunnel. The prequalified entities are as follows: JV í…F Hansen & Henneberg/Poyry Infra GmbH; Mott MacDonald Ltd; JV Ramboll/Arup/TEC; COWI A/S in collaboration with HBI Haerter AG, M&E Engineering, GBI Gackstatter Beratende Ingenieure GmbH, Barbara Consult and HOJ Consulting GmbH; JV Grontmij A/S/Capita Symonds Ltd. Closing date for delivering bids to Femern A/S is 28.11.2011. Click here. Visit www.femern.com. 44/11.



Permalink

Denmark, Copenhagen - dk/12

Metro

COMET jv driving 3.5 km of tunnels using NFM TBMs; 1 km NATM; and 500 m cut-and-cover. March 1999.NFM reports its two 5.71 m-diameter EPBs have recorded best day of 53 m, best week of 154 m, and best month of 567 m on 5 day/week production. Visit www.framatome.fr October 2000.Negotiated procedure, deadline 4th December, 2006 for engineering related to multi-disciplinary civil works (MCW) and multi-disciplinary transportation systems (MTS) for the Copenhagen metro's Circle Line. These two notices to prequalify for the two main consultancy assignments mark the commencement of preparatory actions handled by Orestad Development. Six teams of consultants are expected to be prequalified for each assignment before Christmas. They will then be asked to submit tenders by February 2007 and consultancy contracts are expected to be completed by July for immediate commencement of the work. At the same time the legal acts behind the Circle Line project are being processed by the Danish Parliament. The present planning basis for the project is the preliminary studies completed and reported by May 2005, which are made public by the Ministry of Transport and Energy. The reports can be downloaded (in Danish) from www.m.dk under "Om metro", "Cityring", "Hent materiale".Both consultants will be the owner's consultant through the design and procurement phases including design follow-up during construction. The MCW consultant will act on civil works, building works and related road works, i.e. all tunnel and stations. The MTS consultant will act on all railway system facilities, the rolling stock and the control and maintenance centre (CMC).The Circle Line is 15.5 km long, all underground double tunnel plus 1 km connection tunnel to the CMC, also double tube. The diameter is expected to be 4.9 m identical to the present Copenhagen metro tunnel diameter. There will be 17 stations, all underground. Tunnelling will be, to the possible extent, within the Copenhagen limestone, but it will have to pass areas of different geology at some sections. TBMs are anticipated for tunnelling. Precast concrete segments were applied for the present metro tunnel within the same type of geology. Contractors are expected to be invited to prequalify in late 2008. The planned construction start is scheduled by 2010, for service by 2018. Approved budget is DKK15 billion with a 50% probability. For the MCW engineering contract, visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213057-2006, OJ S 200, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. For the MTS engineering contract, visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213058-2006, OJ S 200, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. E-mail asj@orestad.dk or pba@orestad.dk. Read E-News Weekly 49/2004. 44/06.Negotiated procedure, deadline 24th November, 2006 for a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings. A further 50-100 borings down to 10 m will focus on sampling of environmental information. The programme shall be executed during 2007 and reported in two stages in geotechnical data reports which will be made available to the consultants for the Circle Line project. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=219804-2006, OJ S 206, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. E-mail asj@orestad.dk or pba@hifab.dk. Read E-News Weekly 49/2004. 45/06.The five prequalified consortia for the civil works engineering for the City ring line, Copenhagen metro's Circle Line, are: City Ring Consultants including Carl Bro, FaberMaunsell, and Niras; Cowi, Arup, and Systra; LSI Metro Group including ISC, ILF, and Setec; Parsons Brinckerhoff, teaming with Sweco, DE-Conscult, Erik K. Jí¸rgensen, Al-Gruppen, and Skaarup & Jespersen; and Rambí¸ll allied with Atkins.The five prequalified consortia for the transportation systems engineering are City Ring Consultants including Carl Bro, FaberMaunsell, and Niras; Cowi, Arup, and Systra; MottMacDonald, ISC, Hansen & Hennberg, Setec, and Interfleet; Parsons Brinckerhoff, teaming with Sweco, DE-Consult, Erik K. Jí¸rgensen, Al-Gruppen, and Skaarup & Jespersen; and Rambí¸ll allied with Atkins.Bids will be submitted on 20th March, 2007. Contract awards are expected in June 2007. Click dk/12. Read E-News Weekly 49/2004. Visit www.m.dk/en/construction/future.htm 07/07.GEO and Per Aarsleff have been contracted to undertake a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations of the planned Circle Line. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings. A further 50-100 borings down to 10 m will focus on sampling of environmental information. The programme shall be executed during 2007 and reported in two stages in geotechnical data reports which will be made available to the consultants for the Circle Line project. Plans for the City Circle Line were approved by the Danish Parliament on 1st June, 2007. Then the project will move to the project basis and conceptual design stage with tenders planned in two years and construction with tenders scheduled in three years. Read E-News Weekly 50/2005 & 49/2004. Visit www.m.dk/om_metro/anlaeg/etape4/geoteknik.htm, www.geo.dk and www.aarsleff.com 35/07.A joint venture of COWI, Arup and Systra won the engineering contract for the multi-disciplinary civil works (MCW) for the circle line in Copenhagen. A joint venture of Ramboll, Atkins Denmark and Atkins UK pocketed the engineering contract for multi-disciplinary transportation systems (MTS) for the same line. The total amount of these two contracts over a 10-year period is in the DKK400-600 million range. Read E-News Weekly 49/2004. Visit www.cowi.dk, www.arup.com, www.systra.com, www.ramboll.dk, www.atkinsglobal.com and www.m.dk 43/07.Metroselskabet has signed a contract with LE34 for surveying for the circle line project in Copenhagen. Visit www.le34.dk 23/08.



Permalink

JV Cowi/Systra of Kongens Lyngby secured the contract for consultancy services in relation to Cityringen - branch off to Ny Ellebjerg via Sydhavnen. The new section will include a 3.5 km-long bored tunnel, a cut/cover tunnel and five stations, perhaps all underground. Contact Metroselskabet I/S, attn Mikkel Kjaer Jensen, Copenhagen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008607-2015. Ref.n. 2014072111. 03/15.



Permalink