Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Denmark

Denmark, North Zealand - dk/20

Road

Open call for bids, deadline 12th February, 2008 for technical engineering, preparation of planning and risk analysis for the new Roskilde fjord crossing. The present and only link crossing the Roskilde fjord, which is situated between Frederikssund and Hornsherred, is a lifting bridge already heavily loaded. As the fjord at Frederikssund is at its narrowest, it is here that the easiest crossing from North Zealand to the Hornsherred peninsula can be made. Plans have been mooted for a second crossing, either a bridge or tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=302121-2007, OJ S 247, or contact Vejdirektoratet, Copenhagen, fax +45 33156335. E-mail vd@vd.dk. Also visit www.fjordforbindelse.dk/news.php and www.frederikssund.dk/media(1432,1030)/VVM-unders%C3%B8gelse_fjordforbindelse.pdf 02/08.Open call for bids, deadline 29th February, 2008 for preliminary design and environmental impact assessment (EIA) as well as architectural concepts for a number of different proposals for road bridges and tunnels for the second Roskilde fjord crossing in Frederikssund. Length of bridges and tunnels is approx. 0.8-2 km. The EIA phase is assumed to be finished by the end of 2009. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=17867-2008, OJ S 14, or contact Vejdirektoratet, Copenhagen, fax +45 33156335. E-mail vd@vd.dk 08/08.COWI signed a DKK7.9 million deal for technical engineering, preparation of planning and risk analysis for the second Roskilde fjord crossing, either a bridge or tunnel. Visit www.cowi.dk 20/08.



Permalink