India,
Maharashtra
- in/85
High Speed Rail
Closing Date:
23.08.2019 (Tender Closed)
Notice of invitation for bids, deadline 23/08/2019, for construction of tunnelling works including testing and commissioning for double line High Speed Railway using TBM and New Austrian Tunnelling Method (NATM) between Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in the State of Maharashtra for the Project for the Construction of the Mumbai-Ahmedabad High Speed Rail. A pre-bid meeting will be held on 24.05.2019. For further information contact NHSRCL, New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c2packagetender@nhsrcl.in. Click here for more.18/19.
Postponed to 15/11/2019 the deadline of the open invitation to tender for construction of Tunnelling Works including Testing and Commissioning for Double Line High Speed Railway using TBM and New Austrian Tunnelling Method (NATM) between Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail.
Contact NHSRCL, attn Managing Director, New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c2packagetender@nhsrcl.in. Click here and here for further information .Ref.n. MAHSR-C-2. 41/19.
Open invitation to tender, deadline 19/03/2020, for design and construction of civil and buildings works including testing and commissioning on Design-Build Lump Sum Price basis for Double Line High Speed Railway for Mumbai Underground Station, Cut and Cover Tunnel and Shaft -1 from MAHSR Km. -0.255 to Km. 0.775 at BandraKurla Complex in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail. A Pre-Bid meeting to be held on 20.12.2019, Time 11h00 hrs, at National High Speed Rail Corporation Ltd, Dwarka New Delhi. For further information contact Managing Director, National High-Speed Rail Corporation Limited (NHSRCL), Dwarka New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c1packagetender@nhsrcl.in. Visit here and here for further information. Ref. n. MAHSR-C-1. 51/19.
Postponed from 15/11/2020 to 07/02/2020 the deadline of the open invitation to tender for construction of Tunnelling Works including Testing and Commissioning for Double Line High Speed Railway using TBM and New Austrian Tunnelling Method (NATM) between Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail. Contact NHSRCL, attn Managing Director, New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c2packagetender@nhsrcl.in. Click here and here for further information .Ref.n. MAHSR-C-2. 51/19.
Postponed to 05/05/2021 the deadline of the open invitation to tender for design and construction of civil and buildings works. This includes testing and commissioning on a Design-Build Lump Sum Price basis for the Double Line High Speed Railway for Mumbai Underground Station, Cut and Cover Tunnel and Shaft -1 from MAHSR Km. -0.255 to Km. 0.775 at BandraKurla Complex in the State of Maharashtra. This is part of the Project for Construction of the Mumbai-Ahmedabad High Speed Rail. For further information contact Managing Director, National High-Speed Rail Corporation Limited (NHSRCL), Dwarka New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c1packagetender@nhsrcl.in. Visit here for further information please click here. Ref. n. MAHSR-C-1. 17/21.
Invitation for bids, deadline 02/03/2022, for construction of Tunnelling Works including Testing and Commissioning for Double Line High Speed Railway using (TBM) and (NATM) between the Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in Maharashtra. This is part of the Construction of the Mumbai-Ahmedabad High Speed Rail project. A pre-bid meeting will be held on 16.12.2021 at 1100 hrs through Video Conference (VC). Contact NHSRCL (National High Speed Rail Corporation Ltd), New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c2packagetender@nhsrcl.in . Visit https://etenders.gov.in/eprocure/app. Ref.n. MAHSR-C-2. 43/21.
The tender for design and construction of civil and buildings works, including testing and commissioning on a Design-Build Lump Sum Price basis for the Double Line High Speed Railway for the Mumbai Underground Station, Cut and Cover Tunnel and Shaft -1 from MAHSR Km. -0.255 to Km. 0.775 at the BandraKurla Complex in the State of Maharashtra has been cancelled due to administrative reasons . This is part of the Project for Construction of the Mumbai-Ahmedabad High Speed Rail. For further information contact Managing Director, National High-Speed Rail Corporation Limited (NHSRCL), Dwarka New Delhi, tel +91-11-28070000, fax +91-11-28070250, email clpackagetender@nhsrcl.in. For further information, please click here. Ref. n. MAHSR-C-1. 08/22.
The tender for construction of Tunnelling Works including Testing and Commissioning for Double Line High Speed Railway using (TBM) and (NATM) between the Mumbai Underground Station at Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in Maharashtra has been cancelled due to administrative reasons. Contact NHSRCL (National High Speed Rail Corporation Ltd), New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c2packagetender@nhsrcl.in . Visit https://etenders.gov.in/eprocure/app. Ref.n.
MAHSR-C-2. 08/22.
Open invitation to tender, deadline 20/10/2022, for the design and construction of civil and buildings works including testing and commissioning on Design-Build on a Lump Sum Price basis for the Double Line High Speed Railway for Mumbai Underground Station, Cut and Cover Tunnel and Shaft -1 from MAHSR Km. -0.255 to Km. 0.775 at BandraKurla Complex in the State of Maharashtra for the Project for Construction of Mumbai-Ahmedabad High Speed Rail. A Pre-Bid meeting to be held on 20.12.2019, Time 11h00 hrs, at National High Speed Rail Corporation Ltd, Dwarka New Delhi. For further information contact Managing Director, National High-Speed Rail Corporation Limited (NHSRCL), Dwarka New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c1packagetender@nhsrcl.in. For further information click here and here. Ref. n. MAHSR-C-1. 40/22.
Invitation for tenders, deadline 19/01/2023, for the construction of Tunnelling Works for the Double Line High Speed Railway using TBM and NATM between the Mumbai Underground Station at BKC-Bandra-Kurla Complex (MAHSR Km. 0.773) and Shilphata (MAHSR Km. 21.150) in the State of Maharashtra. This is part of the Construction of the Mumbai-Ahmedabad High Speed Rail project. A pre-bid meeting will be held through a video conference on 21-Oct-2022 11:00 AM. Contact NHSRCL (National High Speed Rail Corporation Ltd), New Delhi, tel +91-11-28070000, fax +91-11-28070250, email c2packagetender@nhsrcl.in. Click here and here for further information. Ref.n. MAHSR-C-2. 40/22.
India,
Maharashtra
- in/80
Metro
Closing Date:
10.07.2018 (Tender Closed)
Contract notice, deadline 10.07.2018, for the design and construction of underground stations at Shivajinagar and Civil Court and tunnels between Agriculture college and Northern End of Budhwar Peth Station on the North-South Corridor of Pune Metro Rail Project (UGC-01).
Further information from https://mahametrorail.etenders.in where tender must to be sent. Contact Maharashtra Metro Rail Corporation Ltd, Pune, tel 020-26051074, email mahametro.tenders@gmail.com. Visit https://mahametrorail.etenders.in/indexes/tender_details/MTM0,
http://www.punemetrorail.org/download/NIT%20UGC-01.pdf and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=217880-2018.
Ref. n. P1UGC-01/2018. 24/18.
Contract notice, deadline 26.07.2018, for the design and construction of underground stations at Budhwar Peth, Mandai and Swargate and associated tunnels on the North-South Corridor of Pune metro rail project (UGC-02).
Further information from https://mahametrorail.etenders.in where tender must to be sent. Contact Maharashtra Metro Rail Corporation Ltd, Pune, tel 020-26051074, email mahametro.tenders@gmail.com. Visit https://mahametrorail.etenders.in/indexes/tender_details/MTM4,
http://www.punemetrorail.org/download/NIT%20UGC-02.pdfhttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238726-2018
and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=247375-2018.
Ref. n. P1UGC-02/2018. 24/18.
Postponed from 10.07.2018 to 10.08.2018 the deadline of the
contract notice for the design and construction of underground stations at
Shivajinagar and Civil Court including tunnels between Agriculture college and
Northern End of Budhwar Peth Station on the North-South Corridor of Pune Metro
Rail Project (UGC-01).
Further information from https://mahametrorail.etenders.in
where tenders must to be sent. Contact Maharashtra Metro Rail Corporation Ltd,
Pune, tel 020-26051074, email mahametro.tenders@gmail.com.
Visit
https://mahametrorail.etenders.in/indexes/tender_details/MTM0 and https://mahametrorail.etenders.in/tender_document/tender_134/corrigendum_doc/134_CorrigendumI.pdf.
Ref. n. P1UGC-01/2018. 24/18.
Postponed from 26.07.2018 to 27.08.2018 the deadline of the
contract notice for the design and construction of underground stations at
Budhwar Peth, Mandai and Swargate and associated tunnels on the North-South Corridor
of the Pune metro rail project (UGC-02).
Further information from https://mahametrorail.etenders.in
where tenders must to be sent. Contact Maharashtra Metro Rail Corporation Ltd,
Pune, tel 020-26051074, email mahametro.tenders@gmail.com.
Visit https://mahametrorail.etenders.in/indexes/tender_details/MTM4
and https://mahametrorail.etenders.in/tender_document/tender_138/corrigendum_doc/138_CorrigedumII.pdf.
Ref. n. P1UGC-02/2018. 29/18.
Postponed to 27.08.2018 the deadline of the contract notice for the design and construction of underground stations at Budhwar Peth, Mandai and Swargate and associated tunnels on the North-South Corridor of Pune metro rail project (UGC-02). Further information from https://mahametrorail.etenders.in where tender must to be sent. Contact Maharashtra Metro Rail Corporation Ltd, Pune, tel 020-26051074, email mahametro.tenders@gmail.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328423-2018 .
Ref. n. P1UGC-02/2018. 31/18.
Postponed until the 24.08.2018 is the deadline for the
contract notice for the design and construction of underground stations at Shivajinagar and Civil Court and tunnels
between Agriculture college and Northern End of Budhwar Peth Station on the
North-South Corridor of Pune Metro Rail Project (UGC-01). Further information can
be sought from https://mahametrorail.etenders.in
where any tenders must to be sent. Contact Maharashtra Metro Rail Corporation
Ltd, Pune, tel 020-26051074, email mahametro.tenders@gmail.com.
Visit https://mahametrorail.etenders.in/indexes/tender_details/MTM0,
http://www.punemetrorail.org/download/NIT%20UGC-01.pdf and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=350133-2018.
Ref. n. P1UGC-01/2018. 32/18.
Postponed from 27.08.2018 to 07.09.2018 the deadline of the
contract notice for the design and construction of underground stations at Budhwar
Peth, Mandai and Swargate and associated tunnels on the North-South Corridor of
Pune metro rail project (UGC-02). Further information from https://mahametrorail.etenders.in where tender must to be sent. Contact
Maharashtra Metro Rail Corporation Ltd, Pune, tel 020-26051074, email mahametro.tenders@gmail.com.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=360967-2018
. Ref. n. P1UGC-02/2018. 34/18.
Open invitation to tender, deadline 15.03.2019, for the design verification, supply, installation, testing and commissioning & comprehensive annual maintenance contract (CAMC). The contract is for an environmental control system (ECS), ECS and E&M Scada, LV Power System for the underground section (Shivaji Nagar, Civil Court, Budhwar Peth, Mandai and Swargate) of Pune Metro Rail Project. The duration of the contract is 156 weeks. Contact Pune Metro Rail Project, Pune, tel 020-26051072, email mahametro.tenders@gmail.com. Visit http://www.punemetrorail.org/download/NIT-UGC03-2019.pdf and https://mahametrorail.etenders.in/indexes/tender_details/MTY1. Bid.n
P1/UGC03/2019. 07/19.
Postponed from 15.03.2019 to 25.04.2019 the deadline of the
invitation to tender for design verification, supply, installation, testing and
commissioning & comprehensive annual maintenance contract (CAMC). The
contract is for 5 years for a tunnel ventilation system (TVS), TVS.Scada,
environmental control system (ECS), ECS and E&M Scada, LV Power System in ASS.
To be implemented on the underground section (Shivaji Nagar, Civil Court, Budhwar Peth, Mandai and
Swargate) of the Pune Metro Rail Project. The duration of the contract is 156
weeks. Contact Pune Metro Rail Project, Pune, tel 020-26051072, email mahametro.tenders@gmail.com.
Visit http://www.punemetrorail.org/download/NIT-UGC03-2019.pdf
and https://mahametrorail.etenders.in/indexes/tender_details/MTY1.
Bid.n P1/UGC03/2019. 13/19.
The Maharashtra Metro Rail Corporation (Maha-Metro) has awarded
to Gulermak-Tata Projects Ltd Pune Metro Joint Venture the EUR145.03 million (
Rs.1,127 crores) contract for the design and construction of underground
stations at Shivajinagar and Civil Court.
It also includes tunnels between the Agriculture college and Northern End of
Budhwar Peth Station on the North-South Corridor of Pune Metro Rail Project
(UGC-01, length 2.5 km). Contact Maharashtra Metro Rail Corporation Ltd, Pune,
tel 020-26051074, email mahametro.tenders@gmail.com.
Visit http://www.punemetrorail.org/Tenders.aspx
and https://urbantransportnews.com/tata-gulermak-jv-bags-pune-metro-tunneling-projects-worth-rs2283-cr/.
Ref. n. P1UGC-01/2018. 13/19.
The Maharashtra Metro Rail Corporation (Maha-Metro) has awarded
to Gulermak-Tata Projects Ltd Pune Metro Joint Venture the EUR148.78 million (Rs.1,156
crores) contract for the design and construction of underground stations at
Budhwar Peth, Mandai and Swargate and associated tunnels on the North-South
Corridor of Pune metro rail project (UGC-02, length 2.5 km).Further information
from https://mahametrorail.etenders.in
where tender must to be sent. Contact Maharashtra Metro Rail Corporation Ltd, Pune,
tel 020-26051074, email mahametro.tenders@gmail.com.
Visit http://www.punemetrorail.org/Tenders.aspx
and https://urbantransportnews.com/tata-gulermak-jv-bags-pune-metro-tunneling-projects-worth-rs2283-cr/ and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223796-2019
Ref. n. P1UGC-02/2018. 13/19.
M/S URC Construction Ltd from Bangalore secured the EUR 48,04
million (INR3.78bn) contract for construction of 2 rolling stock depots at
Range Hill and Vanaz including civil and E&M works for the Pune Metro Rail
Project. Contact Maharashtra Metro Rail Corporation Ltd, Pune, tel
020-26051074, email mahametro.tenders@gmail.com.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=174276-2019.
Ref. n. P1UGC-01/2018. 16/19.
The Gulermak-TPL Pune Metro JV from Mumbai secured the
EUR143.15 million (INR8.65bn +USD37.59 million) contract for design and
construction of underground stations viz. Shivajinagar and Civil Court and
tunnels between Agriculture college and Northern End of Budhwar Peth Station on
the North-South Corridor of Pune Metro Rail Project. Contact Maharashtra Metro
Rail Corporation Ltd, Pune, tel 020-26051074, email mahametro.tenders@gmail.com.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=174274-2019.
Ref. n. P1UGC-01/2018. 16/19.
Postponed to 27.06.2019 the deadline of the invitation to
tender for the design verification, supply, installation, testing and
commissioning & comprehensive annual maintenance contract (CAMC). The
contract is for 5 years for a tunnel ventilation system (TVS), TVS.Scada,
environmental control system (ECS), ECS and E&M Scada, LV Power System in
ASS. To be implemented on the underground section (Shivaji Nagar, Civil Court, Budhwar Peth, Mandai and
Swargate) of the Pune Metro Rail Project. The duration of the contract is 156
weeks. Contact Pune Metro Rail Project, Pune, tel 020-26051072, email
mahametro.tenders@gmail.com. Visit http://www.punemetrorail.org/download/NIT-UGC03-2019.pdf
and
https://mahametrorail.etenders.in/indexes/tender_details/MTY1.
Bid.n
P1/UGC03/2019. 25/19.
Open invitation to tender, deadline 12.07.2019, for enrolment
of General Consultants (GC) for Various Upcoming & Existing Metro Rail
Projects of Maha-Metro.
The various projects under progress and in advanced stages
of sanction in the near future are:
1) Nagpur Metro Rail Project Phase-II with length of
elevated 48 Kms approx. with 25KV OHE system and Communication Based Train
Control (CBTC) signalling.
2) Pune Metro Rail Project Phase II with length of 31.5 Kms,
15 m of which is underground, with 25KV OHE system and Communication Based
Train Control (CBTC) signalling.
3) the 31.5 km Thane Metro Rail Project with 2.2 km
underground, with 25KV OHE system and communication Based Train Control (CBTC) signalling.
4) The 32 km elevated Nashik MRTS Project;
5) Other Works including Metro works to be assigned to
Maha-Metro. Contact Mahametro, attn Managing Director, Nagpur, email md.nmrcl.tenders@gmail.com. Visit https://mahametrorail.etenders.in/indexes/tender_details/MTg2.
26/19.
India,
Mumbai/Bombay
- in/77
Metro Line 3
Closing Date:
16.09.2017 (Tender Closed)
Invitation to tender, deadline 16.09.2017, for procurement, supply, installation, testing and commissioning of various power supply works including associated civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line 3. For any additional information contact MMRC’s e-tendering service desk at www.tenderwizard.com/MMRC, tel 022-26597654/022-26597672.Visit https://www.tenderwizard.com=>. Tender n. MMRC/MM3/REL-PYL/NIT/18R. 37/17.
Postponed to 05.10.2017 the deadline for the invitation to bid for Design, Manufacture, Supply, Installation, Testing and Commissioning of E&M works comprising of Electrical Sub Stations with HT and LT works, Ventilation and Air Conditioning Systems (VAC), Fire Detection Systems, Fire Suppression (Fire Fighting) Systems, Building Management System (BMS), EOT cranes, Air-Compressors including compressed air piping works and Plumbing Pumps for the Depot Buildings including OCC and at grade Aarey Station for Mumbai/Bombay Metro Line 3. For further information contact MMRC, attn. R. K. Sharma, Mumbai, +91 22 26590150, fax +91 22 26590150, email ramesh.sharma@mmrcl.com. Visit https://www.tenderwizard.com. Contract n. MM3-CBS-DEM. 37/17.
https://www.tenderwizard.com=>https://www.tenderwizard.com/ROOTAPP/servlet/asl.tw.aac.VendorDocumentsController?enc%3DU%2B5gMnYPA417HkiuQ2esjla%2Fb4Q6%2FeaF4fehrW3HhuDYsn3hZzw0MTUovJ3HazETixJL2QLMUWw3%0D%0Aa8b0RwoBwuuBfzJbaIq6x7l7dK3VnmstlKfCulYOZf7SIAtErxkyGkqiXWSK5oWDUIDAJKSyIjHV%0D%0At4r7reRWutGsq7sikoZvGrbCGtLpaVAT7R80EN9QIKNTwjIop2IjPR1IfTirgA%3D%3D%26chkSum%3D20b26192d0884339f46612bbf7d0910cc0adf546.
On 20.06.2017 the bids opened for Pre-Qualification for procurement of Rolling Stock for Colaba-Bandra-SEEPZ Metro-3 project. The following six companies submitted the bids: Hitachi Ltd, CAF SA, Mitsubishi Corporation, Alstom Transport India Ltd & Alstom Transport SA (Consortium), Kawasaki Heavy Industries & BHEL (Consortium), CRRC Nanjing & CRRC Changchun & CRRC International Corporation Ltd (Consortium). Evaluation is under process. Visit https://www.mmrcl.com/sites/default/files/PQ%20BID%20RS%2020-06-17_0.pdf. 37/17.
Mumbai Metro Rail Corporation (MMRC) awarded two key
contracts for the Electrical system works of 25 kV Traction and Power supply
system of Colaba-Bandra-SEEPZ of the Mumbai Metro Line 3.
M/s Larsen & Toubro Ltd has been awarded the work of
Power supply system.
Consortium of Alstom Transport India Ltd & Alstom
Transport S.A has been awarded the works of 25 kV AC Traction system.
The works consist of setting up three receiving substations,
laying Overhead Rigid conductor system in Underground tunnel alignment for the 33.5
km route length, commissioning of state of art SCADA system in Control office
and other associated works. The substations are being planned in a compact size using a Gas insulation scheme
which is the latest technology in the field of power systems. Visit https://www.mmrcl.com/sites/default/files/MMRC%20awards%20Electrical%20works%20contracts%20for%20Metro%20Line%20III.pdf.
08/18.
MMRC (Mumbai Metro Rail Corporation) received 6 bids (from
Voltas Ltd; Blue Star Ltd; Consortium of ETA and Polycab; Jakson Ltd; Sterling
& Wilson Pvt. Ltd; Sam India
Builtwell Pvt. Ltd) for procurement of the state of art Depot (Electrical &
Mechanical) system for Colaba-Bandra-SEEPZ Metro-3 corridor. The works includes
Design, Supply, Installation, Testing & Commissioning of E&M
works.Visit https://www.mmrcl.com/sites/default/files/Press%20Release_Depot%20EM.pdf.
28/18.
Postponed from 10/07/2018 to 24/07/2018 the deadline for the
Invitation for Bids for Design, Manufacture, Supply, Installation, Testing and
Commissioning of Tunnel Ventilation System & Environmental Control System
between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3
(Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General
Manager (RS & Elect.), tel +91-22-26597659, fax
+91-22-26590150, email rajeev@mmrcl.com.
Visit
https://www.mmrcl.com/sites/default/files/TVE%20Phase-1%20Addendum%20No%202.pdf
and https://www.mmrcl.com/sites/default/files/combinepdf.pdf.
Ref.n.
MM3-CBS-TVE.28/18.
Postponed from 24/07/2018 to 09/08/2018 the deadline for the Invitation for bids for Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3 (Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General Manager (RS & Elect.), tel +91-22-26597659, fax +91-22-26590150, email rajeev@mmrcl.com. Visit
https://www.mmrcl.com/sites/default/files/TVE%20Phase-1%20Addendum%20No%204.pdf.
Ref.n.MM3-CBS-TVE. 29/18.
Postponed from 09/08/2018 to 29/08/2018 the deadline for the
Invitation for bids for Design, Manufacture, Supply, Installation, Testing and
Commissioning of a Tunnel Ventilation System & Environmental Control System
between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3
(Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn
General Manager (RS & Elect.), tel +91-22-26597659, fax
+91-22-26590150, email rajeev@mmrcl.com.
Visit
https://www.mmrcl.com/sites/default/files/Addendum-5%20with%20sign.pdf
and https://www.mmrcl.com/sites/default/files/Addendum-6%20published.pdf.
Ref.n. MM3-CBS-TVE. 33/18.
The consortium consisting of M/s. ASIS Elektronik ve Billisim Sistemleri A.S., Turkey and Kalindee Rail Nirman – A Division of Texmaco Rail & Engineering Limited, India (Kalindee -ASIS JV) has been awarded the contract for Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System for the 27 stations of Mumbai Metro Line-3 (MML-3). Visit
https://www.mmrcl.com/sites/default/files/Press%20Release-%20Award%20of%20LoA%20for%20AFC%20%28Package-14%29%20by%20MMRCL%20on%2015.01.2019-converted.pdf.
05/19
Shanghai Tunnel Engineering Corporation Ltd. (STEC) has been
awarded the contract for Design, Manufacture, Supply, Installation, Testing and
Commissioning of Tunnel Ventilation System & Environmental Control System
between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3
(Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn
General Manager (RS & Elect.), tel +91-22-26597659, fax
+91-22-26590150, email rajeev@mmrcl.com.
Visit
https://www.mmrcl.com/sites/default/files/Press%20Release-%20MMRC%20awards%20Tunnel%20ventilation%20and%20Environmental%20Control%20System%20Works%20contract%20for%20the%20section%20Aarey%20to%20BKC%20for%20Mumbai%20Metro%20Line-3.pdf
MM3-CBS-TVE.08/19.
Blue Star announced that Mumbai Metro Rail Corporation
(MMRCL) has issued a Letter of Intent dated 18 June 2019 to the Company for
Design, manufacture, Supply, Installation, Testing and Commissioning of Tunnel
Ventilation and Air Conditioning Systems approximately valued at EUR32,38
million (INR2.53 bn), subject to the definitive agreements to be executed
between the Company and MMRCL.
The Mumbai Metro is a rapid transit system serving the
city of Mumbai, Maharashtra, and the wider metropolitan region. The system is
being built in three phases over a 15-year period, with overall completion
expected in 2025. When completed, the core system will comprise 8 high-capacity
metro railway lines, spanning 235 km, 24% of which underground, with 200
stations. Visit https://www.bluestarindia.com and https://www.mmrcl.com/en. 25/19.
India,
Uttarakhand
- in/76
Railway
Closing Date:
05.06.2017 (Tender Closed)
Request for proposal, deadline 05.06.2017, for detailed design and project management consultancy for the construction of tunnels, bridges, and formation works from Chainage 6+015 to 18+444 (12.429km, with a 10.855 km tunnel) in connection with new single line Broad Gauge rail link between Rishikesh and Karanprayag (125Km, with 106 km in tunnels) in the State of Uttarakhand, India. Duration contract : 6 months for Detailed Design plus 60 months for construction supervision plus 6 months Defect Liability Period for the work. Contact RVNL (Rail Vikas Nigam Ltd), attn Group General Manager/P-1, email Bhanu.prakash@rvnl.org, tel + 91 011 26738503. For further information click here. Ref.n. RFP No./RVNL/RKSH-KNPG/2016/DD&PMC/PK-1. 19/17.
Open invitation to tender, deadline 16/10/2019, for construction of tunnels, bridges and formation works from km 18+444 to km 33+097 (Package 2) in connection with new single Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in State of Uttarakhand, India. The contract includes the construction by NATM method of tunnels n.2 (6460 m) and n.3 (6720 m). For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk Number +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. Visit here and here for further information.Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-2. 41/19.
Open invitation to tender, deadline 14/11/2019, for construction of tunnels, bridges and formation works from km 6+015 to km 18+444 (Package 1) in connection with new single Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in State of Uttarakhand, India. The contract includes the construction by NATM method of tunnel n.1 (10850 m).
For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk Number +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. Click here for further information. Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-1. 41/19.
Open invitation to tender, deadline 06/12/2019, for construction of tunnels, bridges and formation works from km 91+228 to km 101+339 (Package 7B) in connection with new Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India. The contract includes the tunnel n. 13 (9420 m) to be built by NATM method. A pre-bid meeting will be held on 16/10/2019 at 11.30 h in RVNL Office in New Delhi.
For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk Number +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. Visit here and here for further information.Ref. n. RVNL/RKSH-KNPG/Tender/Tunnels/Pk-7B. 41/19.
Open invitation to tender, deadline 10/12/2019, for construction by NATM method of a single line tunnel n.11 (9050 m), major and minor bridges, formation works and other ancillary works from km 73+489 to km 83+899 (Package 6) in connection with new single Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India.
A pre-bid meeting will be held on 16/10/2019 at 11.30 h in RVNL Office in New Delhi. For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk Number +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. Visit here and here .Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-6. 41/19.
Open invitation to tender, deadline 12/12/2019, for the construction of tunnels and bridges works from km 83+899 to km 91+228 (Package 7A) in connection with new Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India. The contract includes the tunnel n. 12 (7080 m) to be built by NATM method. A pre-bid meeting will be held on 16/10/2019 at 11.30 h in RVNL Office in New Delhi.
For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk Number +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. For further information please click here and here
Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-7A. 41/19.
Postponed from 10/12/2019 to 27/12/2019 the deadline of the open invitation to tender for construction by NATM method of a single line tunnel n.11 (9050 m), major and minor bridges, formation works and other ancillary works from km 73+489 to km 83+899 (Package 6) in connection with new single Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India. For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk tel +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. For further information please click here and here. Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-6. 51/19.
Postponed from 12/12/2019 to 04/01/2020 the deadline of the open invitation to tender for the construction of tunnels and bridges works from km 83+899 to km 91+228 (Package 7A) in connection with new Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India. The contract includes the tunnel n. 12 (7080 m) to be built by NATM method. For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk tel +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. For further information please click here and here. Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-7A. 51/19.
Postponed from 06/12/2019 to 02/01/2020 the deadline of the open invitation to tender for construction of tunnels, bridges and formation works from km 91+228 to km 101+339 (Package 7B) in connection with new Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India. The contract includes the tunnel n. 13 (9420 m) to be built by NATM method. For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk tel +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel+91 9355030627. Visit here and here for further information. Ref. n. RVNL/RKSH-KNPG/Tender/Tunnels/Pk-7B. 51/19.
Postponed from 17/12/19 to 13/01/2020 the deadline of the open invitation to tender for construction of tunnels, bridges and formation works from km 117+365 to km 125+320 (Package 9) in connection with new Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in the State of Uttarakhand, India. The contract includes the tunnel n. 16 (6285m) and Tunnel 16B (70m). For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. For any query regarding e-tendering portal / Bid submission please contact helpdesk tel +91 -11-49606060, email helpdeskeuniwizarde@gmail.com, Mr Abhinav Bharat, tel +91 7982696347 and Mr Amit Kumar Jha, tel +91 9355030627. Visit here and here for further information. Ref. n. RVNL/RKSH- KNPG/Tender/Tunnels/PK-9. 51/19.
The Heavy Civil Infrastructure business of L&T Construction has secured the order from Rail Vikas Nigam Limited (RVNL) for construction of tunnels, bridges and formation works from km 18+444 to km 33+097 (Package 2) in connection with new single Broad Gauge (BG) Rail line between Rishikesh and Karanprayag (125 km) in State of Uttarakhand, India. The contract includes the construction by NATM method of tunnels n.2 (6460 m) and n.3 (6720 m). The value of the order is between Rs 1,000-Rs 2,500 crore. For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. Visit here for further information. Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-2. 51/19.
The Heavy Civil Infrastructure business of L&T Construction has secured the order from Rail Vikas Nigam Limited (RVNL) for construction of tunnels, formation, construction shaft and other ancillary works from km 47+360 to km 63+117 (Package 4) with TBM and NATM in connection with the New Broad-Gauge (BG) line between Rishikesh and Karanprayag (125 km). The contract includes the construction of tunnel n.8 (14.577 Km upline and 13.123 Km downline) with embankments of approximately 800 m at both ends. Part of the 14.577 Km and 13.123 Km tunnel,will be excavated using two new hard rock TBMs of diameter 9.1 m and the rest of the tunnel will be built using New Austrian Tunnel Method (NATM). For further information contact RVNL (Rail Vikas Nigam Ltd), attn Chief Project Manager, Rishikesh tel +91-135-2442008, email himansu.badoni@rvnl.org. Click here for further information. Ref.n . RVNL/RKSH-KNPG/Tender/Tunnels/Pk-4. 03/21.