Prado Sud, a consortium led by Vinci Concessions with Eiffage, inaugurated the 1.5 km-long Prado Sud tunnel in Marseille on 15.11.2013. It opened to traffic the following day, seven months ahead of schedule. The consortium has been involved the financing, design, construction and now, the operation of the tunnel, through a Public Service Delegation contract. This concession contract between the Marseille Metropolitan Area and Societe Prado Sud came into effect in 2008 for a period of 47 years, including time for project design and construction. Click fr/38 for tunnelbuilder archive. Visit www.vinci-concessions.com and www.eiffageconstruction.com. 48/13.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil