Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Turkey

Turkey, Istanbul - tr/13

Metro

Closing Date: 30.06.2014 (Tender Closed)

Pre-qualification tender, deadline 30.06.2014, for the final design works of 6.65 km-long Metrokent–Kayasehir underground line and 12.64 km-long Basaksehir-Kayasehir-Olympic Park Tramcar line. Duration of work 15 months. Companies interested can obtain tender documents from Istanbul Metropolitan Municipality (IBB), Projects Department, Infrastructure Projects Directorate, Merter-İstanbul. Visit http://www.ibb.gov.tr/tr-TR/Pages/IhaleIlani.aspx?IhaleID=12842 and http://www.ambankara.esteri.it/NR/rdonlyres/91A7B652-3458-48CE-A951-D9D2C1CD394D/33218/CronacheEconomiche201412.pdf. Ref. n. 2014/48722. 24/14.



Permalink