Negotiated procedure, deadline 27th February, 2006 for engineering design and construction supervision for a new concrete box tunnel and railway station at Berlin Schoenefeld airport to be used by long distance and metropolitan trains. The total length of the project is approx. 3,190 m with variable cross section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020074-2006, OJ S 18, or contact Flughafen Berlin-Schoenefeld, Berlin, fax +49 3060912663. E-mail wilfried.mertens@berlin-airport.de 08/06.Open call for tenders, deadline 31st July, 2006 for construction of a 4-track tunnel and underground railway station at Berlin Schoenefeld airport. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096741-2006, OJ S 90, or contact Flughafen Berlin-Schoenefeld, Berlin, fax +49 3060912663. E-mail wilfried.mertens@berlin-airport.de 21/06.A JV of RSF and Zerna Köpper & Partner will be responsible for engineering design and construction supervision for a new concrete box tunnel and railway station at Berlin Schoenefeld airport to be used by long distance and metropolitan trains. The total length of the project is approx. 3,190 m with variable cross section. Visit www.zkp.de 03/07.Periodic information notice for 600 m-long tunnel and associated works at Schoenfeld Airport.Contact Herrn Jaeger at DB ProjektBau, tel +49 3029 756801, e-mail arno.jaeger@bahn.de 44/08.