The Joint Venture BeMo Tunneling GmbH (70%) and Subterra (30%) have been commissioned by the Weilheim State Building Authority to construct the 2-lane Kramer tunnel (3609 m) on the B23. The contract includes the ventilation shaft, ventilation structure (structural works), trough structure at the North Portal and tunnel access areas North and South. Visit https://www.stbawm.bayern.de and https://www.bemo.net/ and https://www.subterra.cz .31/19.