The deadline of the open invitation to tender for TCE (Tout Corps d'Etat) development works in the 18 stations of Lille metro Line 1 and in the Centralized Control Center of Lille metro lines 1 and 2 (Lot 18) has been postponed from 06/04/2021 to 01/06/2021. The contract value is EUR 5.40million, excluding VAT. The contract duration will be 20 months. For tender documents click here, where tenders must be sent. Contact Metropole europeenne de Lille, attn Emilie Rodriguez, tel +33 320212757, email marches.services.urbains@lillemetropole.fr. Ref.n. 20TR14. 12/21.