Open invitation to tender, deadline 13.09.2018, for the
construction of the subsection Olite – Tafalla South, section Castejon-Comarca
de Pamplona, High Speed Zaragoza-Pamplona Line , including the 1560 m Monte Plano
tunnel.
Value contract EUR58.27 million, excluding VAT. Contact
Adif, att.ne Tomas Rodriguez, Madrid,
tel 917744838, email trodriguez@adif.es.
Visit http://www.adifaltavelocidad.es/AdifWeb/licitaciones/detalleLicitacion.jsp?expediente=3.18/20830.0180&tipo=LICITACION
and
http://prensa.adifaltavelocidad.es/nde/u08/GAP/Prensa.nsf/Vo000A/B6D8F07E6F8B51B8C12582DE003ED2B1?Opendocument
.Ref.n. 3.18/20830.0180. 32/18.
Puentes y Calzadas Infraestructuras SLU (67 %)/Construcciones Murias SA (33 %) from San Sebastian/Donostia secured the EUR48.71 million contract, excluding VAT, for the construction of the subsection Olite - Tafalla South, section Castejon-Comarca de Pamplona, High Speed Zaragoza-Pamplona Line, including the 1560 m Monte Plano tunnel. Contact Adif Alta Velocidad, attn Jose Vicente Rodriguez, Madrid, tel +34 917744891, fax +34 917674490, email jvrodriguez@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/577520-2022 and https://ted.europa.eu/en/notice/-/detail/104017-2019. Ref.n. 3.18/20830.0180. 42/22.