Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Finland

Finland, Helsinki - fi/23

Railway

Closing Date: 06.03.2013 (Tender Closed)

Restricted invitation to tender, deadline 06.06.2013, for traffic control and safety engineering services for the 7.2 km-long City Rail Loop, starting in Pasila and running in a 6 km double track tunnel via Toolo, Helsinki city centre, Hakaniemi and back to Pasila.

Contact Liikennevirasto, att.n Jussi Lindberg, Helsinki, tel +358 20637373, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to be sent at Liikennevirasto, att.n Kirjaamo/diaarinumero 2523/0712/2013, PL 33 (Opastinsilta 12 A, 2 krs.), Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167745-2013. Bid Code n. 2523/0712/2013. 21/13.



Permalink

Restricted invitation to tender, deadline 12.12.2013, for measurement engineering services for the 7.2 km-long City Rail Loop, starting in Pasila and running in a 6 km-long double track tunnel via Toolo, Helsinki city centre, Hakaniemi and back to Pasila. Contact Liikennevirasto, att.n Jussi Lindberg, Helsinki, tel +358 295343820, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to be sent at Liikennevirasto, att.n Kirjaamo/diaarinumero 5122/0821/2013, PL 33 (Opastinsilta 12 A, 2 krs.), Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=403438-2013. 49/13.



Permalink

GeoUnion of Helsinki secured the EUR165,150 contract, excluding VAT, for measurement engineering services for the 7.2 km-long City Rail Loop, starting in Pasila and running in a 6 km-long double track tunnel via Toolo, Helsinki city centre, Hakaniemi and back to Pasila. Contact Liikennevirasto, att.n Jussi Lindberg, Helsinki, tel +358 295343820, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=181699-2014. 23/14.



Permalink

Finland, Helsinki - fi/22

Sewer

Closing Date: 03.04.2013 (Tender Closed)

Restricted invitation to tender, deadline 03.04.2013, for sewer tunnel, vertical shafts and related facilities construction, as well as arrangements for the connection between new and old sewer in Helsinki. Access tunnel length 155 m. Sewer tunnel cross-section mainly 16 sq m with a total length of about 2,700 m. Four vertical shafts 15-26 m to the bottom of the tunnel. Duration works July, 2013 to December, 2015. Contact Helsinki Region Environmental Services Authority, att.n Mitja Huttunen, Helsinki, tel +358 915613296, e-mail hankinnat@hsy.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=085634-2013. Bid Code n. 158/10/105/1050/2013. 11/13.



Permalink

Restricted invitation to tender, deadline 05.08.2019, for a new sewer tunnel from Lauttasaari to the pumping station at Vattuniemi in Taka-Töölö (Helsinki) to be connected with the existing sewer network. Duration contract from  02/09/2019  to 30/08/2020. For bid documents https://tarjouspalvelu.fi/hsy. Offers must be sent to https://tarjouspalvelu.fi/hsy?id=245225&tpk=137fb374-6e4c-4e2f-a683-990021fa80c6.

Contact HSY - Helsinki Region Environmental Services Authority, attn Markku Marjamäki, Helsinki, tel +358 915611, email hankinnat@hsy.fi.

Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=314640-2019.

Bid Code n. 607/05.050.502.5021/2019. 28/19.



Permalink

Finland, Tampere - fi/21

Highway

Restricted call for tenders, deadline 20th February, 2007 for detailed design of an approx. 3 km road section on the Tampere northern ring road, including the 2 x 2.3 km Rantaväylän tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=8927-2007, OJ S 8, or contact City of Tampere, Tampere, tel. +358 503646101. E-mail etunimi.sukunimi@tampere.fi 07/07.



Permalink

Negotiated call for tenders, deadline 26.01.2012, for construction of 3 km-long road section of Tampere northern ring road Vt12, including twin tube 2.3 km-long Rantavaylan tunnel. Contract value EUR185 million excluding VAT. Contact Liikennevirasto, attn Mauri Makiaho, Helsinki, tel +358 407334801. Send tender to Liikennevirasto, attn kirjaamo/4525/0830/2011, Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=401091-2011 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399928-2011. 01/12.



Permalink

The consortium Lemminkainen Infra Oy, A-Insinoorit Suunnittelu Oy and Saanio & Riekkola Oy secured the EUR185 million contract for construction of 3 km-long road section of Tampere northern ring road Vt12, including twin tube 2.3 km-long Rantavaylan tunnel. Contact Liikennevirasto, attn Mauri Makiaho, Helsinki, tel +358 407334801. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=220212-2012. 38/12.



Permalink


Open invitation to tender, deadline 17/08/2022, for the maintenance of the technical systems and equipment of the following road tunnels Ranta (2,3 km) on the VT12 and Karkunvuori (180 m) on the E63 at Tampere. Click here for tender documents and where tenders must be sent. Value of the contract will be EUR1.9 million, excluding VAT. Duration of contract is from 01/10/2022 tol 30/09/2026. Contact Fintraffic Tie Oy,Helsinki, email hankinnat@fintraffic.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=330542-2022. Ref.n. QS 011/204. 25/22. 

 

Finland-Helsinki: Repair, maintenance and associated services related to roads and other equipment


2022/S 117-330542

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Fintraffic Tie Oy
National registration number: 2945247-3
Postal address: Palkkatilanportti 1
Town: Helsinki
NUTS code: FI197 Pirkanmaa
Postal code: 00240
Country: Finland
E-mail: hankinnat@fintraffic.fi
Internet address(es):
Main address: https://www.fintraffic.fi
I.5)Main activity
Other activity: Liikenne, liikenteen hallinnan ja ohjauksen palvelut, valtion erityistehtäväyhtiö

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Ranta- ja Karkunvuoren tunnelien teknisten järjestelmien ja laitteiden kunnossapito


II.1.2)Main CPV code
50230000 Repair, maintenance and associated services related to roads and other equipment
II.1.3)Type of contract
Services
II.1.5)Estimated total value
Value excluding VAT: 1 900 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: FI197 Pirkanmaa
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2026
This contract is subject to renewal: yes
Description of renewals:


Sopimuksessa on yksi kahden vuoden optiokausi 1.10.2026 – 30.9.2028. Tilaaja ilmoittaa optiokauden käyttöönotosta viimeistään 1.9.2025.


Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 17/08/2022
Local time: 10:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Finnish

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
15/06/2022



Permalink


Caverion Suomi Oy from Vantaa secured the EUR1.6 million contract, excluding VAT, for the maintenance of the technical systems and equipment of the following road tunnels Ranta (2.3 km) on the VT12 and Karkunvuori (180 m) on the E63 at Tampere. Contact Fintraffic Tie Oy, attn Sami Kellokoski, Helsinki, email hankinnat@fintraffic.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=524403-2022. Ref.n. QS 011/204. 39/22. 



Permalink

Finland, Helsinki - fi/20

District Heating

Kalliorakennus TK Vyyryläinen & Co Oy has been awarded a €9.94 million contract by Helsinki Energy for the construction of the 4 km-long 30 sq m Kamppi-Erottaja-Kruunuhaka district heating tunnel, to be blasted in solid rock. Read E-News Weekly # 13/2003 & 50/2002. Visit www.kalliorakennus.com and www.helsinginenergia.fi 27/03.Restricted procedure, deadline 3rd February, 2006 for construction of a 1.3 km 30 sq m tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=09036-2006, OJ S 8, or contact Helsingin Energia, Helsinki, fax +358 96172360. E-mail markku.vettenranta@helsinginenergia.fi 04/06.Restricted call for tenders, deadline 26th March, 2007 for construction of the 4 km-long 30 sq m Tilkka-Käpylä tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=51712-2007, OJ S 42, or contact Helsingin Energia, Helsinki, fax +358 96172360. E-mail markku.vettenranta@helsinginenergia.fi 10/07.



Permalink

Finland, Helsinki - fi/19

Railway

The general design of the Marja line has been awarded to JP-Transplan (lot 1) and LT-Konsultit (lot 2). Ground investigation and rock surveys will be carried out by Tieliikelaitos (lot 3) and Geokeskus (lot 4). The 17.5 km Marja line will connect the existing Martinlaakso commuter line to the main line via the Helsinki-Vantaa airport, serving 6 to 8 stations. Approximately 7.5 km will run in double-tube tunnels, 7 m in diameter. Drill/blast method. Support with rockbolts and shotcrete. Cost around €280 million. Visit www.marja-rata.net 50/02.The Finnish Rail Administration has commissioned Pöyry and WSP Finland to prepare a plan for the Marja line, a new urban railway serving the Helsinki metropolitan area. Other partners are sub-consultants. The plan will be prepared in cooperation with other consulting companies. Pöyry's share of the services amounts to EUR1.1 million. The plan shall be prepared by March 2008. The new railway line will connect the Martinlaakso line with the main line via the Helsinki-Vantaa airport. The length of the line is 18 km, of which more than 8 km in a tunnel under the airport area between Viinikkala and Ruskeasanta. Seven new stations are planned on the line: the ground level stations of Vehkala, Petas, Kivistö and Asola and the underground stations of Aviapolis, Air terminal and Ruskeasanta. Together with the Kerava and Leppävaara urban lines and the Martinlaakso line it will constitute an integrated urban railway loop. The shortest travelling time from Helsinki to the airport will be some 30 minutes. Visit www.poyry.com and www.wspgroup.fi 26/07.The Finnish rail administration RHK has made a procurement decision to order services for detail design of the tunnel part of the ring rail line (formerly a project known as Marja line) to the Helsinki Vantaa airport from a consortium of consultants led by Pöyry. The value of the services provided is estimated at about EUR10.6 million. Pöyry's share of the services will amount to EUR7.5 million. The other member of the consortium is WSP Finland for street connections and rock mechanical simulations. In total, five other Pöyry Group companies will be involved as subconsulting companies, but the project management as well as the major part of the design will be done by Pöyry Infra. These other five Pöyry affiliates are PES-Architects for architectural design of underground stations, Pontek for structures of one underground station, Rapal, Akukon and Marsh. The final contract will be signed when the public procurement is legally valid approximately in August 2008. The services will be provided during the period 2008-2012. Visit www.poyry.com, www.wspgroup.fi/en, www.pesark.com and www.pontek.fiThe new railway line will connect the existing Martinlaakso line with the main line via the airport. The length of the line is 18 km, of which about 8.1 km will be in a tunnel under the airport area. Three to four new underground stations will be constructed. Together with the Kerava and Leppävaara urban lines and the Martinlaakso line, it will constitute an integrated urban railway loop. Trains will run at 10 minute intervals during peak hours. The shortest travelling time from Helsinki to the airport will be some 30 minutes. Visit www.keharata.net/english/index.html 30/08.Invitation to tender under restricted procedure, deadline 28.01.09, for excavation of three tunnels of lengths 300-500 m on Helsinki Ring Rail at Aviapolis near Vantaa airport, at Vantaa airport, and at Ruskeasanta. For specs and docs contact Ms Maija Salonen at Finnish Rail Administration (RHK), PL 185, FIN-00101, Helsinki, e-mail etunimi.sukunimi@rhk.fi and send tenders or requests to participate to Kirjaamo Dnro at same address. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=007455-2009, OJ S6. 03/09.



Permalink

Restricted procedure, deadline 26.03.09, for construction of 6 km-long twin track tunnel section of Ring Rail Line (formerly known as Marja line) to the Helsinki Vantaa airport. Click here for the map. The contract is composed of Lot 1: 1.8 - 2.0 km tunnel + Aviapolis station; Lot 2 :1.8 - 2.0 km tunnel + Airport Terminal station; and Lot 3: 1.8-2.0 km Ruskeasanta tunnel. Tunnel works duration August 2009 - 2013. For more, contact Mrs Maija Salonen at Ratahallintokeskus, Helsinki, tel +358 207515043, e-mail etunimi.sukunimi@rhk.fi. Send tenders to Ratahallintokeskus, PL 185, Mr Kirjaamo/Dnro 447/500/2009, FIN-00101 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=71384-2009, OJ S 49. 12/09.



Permalink

Award of Ring Rail Line contracts worth EUR60,538,713 as follows: Contract No 1 Aviapolis to YIT Rakennus Oy, Panuntie 11, FIN-00620 Helsinki, value EUR21,280,000; Contract No 2 Lentoasema to Skanska Infra Oy, PL 114, FIN-00101, Helsinki, value EUR23,318,713; Contract No 3 Ruskeasanta to SRV Toimitilat Oy, PL 555, FIN-02201 Espoo, value EUR15,940,000. All figures exclude VAT. For full project details visit tunnelbuilder archive fi/19. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295945-2009. 44/09.



Permalink

Invitation to tender under restricted procedure, deadline 07.02.2011, for construction of the Aviapolis tunnel section, including the new station, for the Ring Rail Line. For more contact Liikennevirasto PL 33, attn Mrs Maija Salonen, Helsinki, tel+358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit here for the alignment and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=021947-2011. 04/11.



Permalink

New negotiated invitation to tender, deadline 16.08.2011, for construction of 2.4 km Aviapolis tunnel section, including new station, for the Ring Rail Line. For more, contact Liikennevirasto PL 33, attn Mrs Maija Salonen, Helsinki, tel+358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=235536-2011 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=241234-2011. 31/11.



Permalink

Invitation to tender using restricted procedure, deadline 26.10.2011, for repair of 750 m double tunnel section of the Ring Rail Line at Vantaa airport including grouting, bolting and shotcrete. For more, contact Liikennevirasto PL 33, attn Mrs Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi, to whom tenders or request to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318467-2011. 41/11



Permalink

Invitation to tender using restricted procedure, deadline 15.02.2012, for fire fighting system in the 8 km-long underground section of the ring rail line (formerly known as Marja line) to Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto, attn Kirjaamo Dnro 934/0820/2011, Helsinki, e-mail hh@gribvand.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022556-2012. 04/12.



Permalink

Invitation to tender using restricted procedure, deadline 15.02.2012, for surveillance and security system in the 8 km-long underground section of the ring rail line (formerly known as Marja line) to Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto PL 33 (Opastinsilta 12 A, 2.krs), attn Kirjaamo Dnro 957/0820/2011, 00521 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=025712-2012. 04/12.



Permalink

Invitation to tender using restricted procedure, deadline 15.02.2012, for command and control system and automation system in the 8 km-long underground section of the ring rail line (formerly known as Marja line) to Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto PL 33 (Opastinsilta 12 A, 2.krs), attn Kirjaamo Dnro 1120/0820/2011, 00521 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=025713-2012. 04/12

.



Permalink

Award of contract no 1, value EUR8,792,832 excluding VAT, to FI-Skanska Infra OY of Helsinki for repair of 750 m double tunnel section of the Ring Rail Line at Vantaa airport including grouting, bolting and shotcrete. For more, contact Liikennevirasto PL 33, attn Mrs Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=035355-2012. 05/12.

 



Permalink

Invitation to tender using restricted procedure, deadline 12.03.2012, for installation of electrical system in 2.4 km of underground section of the ring rail line, vertical shafts and station at Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto PL 33 (Opastinsilta 12 A, 2.krs), attn Kirjaamo Dnro 711/0820/2012, 00521 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058569-2012. 08/12.



Permalink

Invitation to tender using restricted procedure, deadline 12.03.2012, for installation of ventilation and air conditioning system in 2.4 km of underground section of the ring rail line and station at Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto PL 33 (Opastinsilta 12 A, 2.krs), attn Kirjaamo Dnro 713/0820/2012, 00521 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=060222-2012. 08/12.



Permalink

 Invitation to tender using restricted procedure, deadline 12.03.2012, for installation of plumbing, sanitary and drainage system and cooling equipment in 2.4 km of underground section of the ring rail line and station at Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto PL 33 (Opastinsilta 12 A, 2.krs), attn Kirjaamo Dnro 712/0820/2012, 00521 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=060223-2012. 08/12.



Permalink

Invitation to tender using restricted procedure, deadline 12.03.2012, for installation of sprinkler and firefighting system in 2.4 km of underground section of the ring rail line and station at Helsinki Vantaa airport. Contact Liikennevirasto, attn Maija Salonen, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to Liikennevirasto PL 33 (Opastinsilta 12 A, 2.krs), attn Kirjaamo Dnro 714/0820/2012, 00521 Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=060224-2012. 08/12.



Permalink

YIT Rakennus Oy (Helsinki) secured the EUR27.8 million contract for the bi-tube 1.7km Ruskeasanta tunnel on the Helsinki Ring Rail. Contact Liikennevirasto (Helsinki).  Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=256927-2012. 33/12.



Permalink

Award of contract to FI-Stanley Security Oy of Helsinki, value EUR922,000 excluding VAT, for installation of sprinkler and firefighting system in 2.4 km of underground section of the ring rail line and station at Helsinki Vantaa airport. More from Maija Salonen at Liikennevirasto, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=297285-2012. 38/12.



Permalink

Award of contract to YIT Kiinteistotekniikka Oy of Helsinki, value EUR3,986,000 excluding VAT, for installation of electrical and HVAC systems in 2.4 km of underground section of the ring rail line, shafts and station at Helsinki Vantaa airport. More from Maija Salonen at Liikennevirasto, Helsinki, tel +358 206373834, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378473-2012. 48/12.



Permalink

The consortium Keharata of Espoo, composed of Kalliorakennus -yhtiot, E. M. Pekkinen Oy and Konevuori Oy, secured the EUR41.91 million contract, excluding VAT, for the construction of the Viinikkala railway tunnel and the west adit on the Ring Rail Line. Contact Liikennevirasto, Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=283153-2013. 35/13.



Permalink

Restricted invitation to tender, deadline 13.09.2013, for lighting equipment in the stations of the Ring Rail Line (formerly known as Marja line) to the Helsinki Vantaa airport. Contact Liikennevirasto, att.n Juha Kansonen, Helsinki, tel +358 295343633, e-mail etunimi.sukunimi@liikennevirasto.fi. Tenders to be sent at Liikennevirasto, att.n Kirjaamo/ Dnro 3549/0820/2013, PL 33 (Opastinsilta 12 A), Helsinki. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=289163-2013. Bid Code n. 3549/0820/2013. 36/13.



Permalink

Are Oy from Vantaa secured the EUR1.68 million contract, excluding VAT, for installation of ventilation and air conditioning systems in the 2.4 km of underground section of the ring rail line and station at Helsinki Vantaa airport. Contact Liikennevirasto, Helsinki, e-mail etunimi.sukunimi@liikennevirasto.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=436110-2016. Ref.n. 713/0820/2012. 50/16.



Permalink

Finland, - fi/18

Helsinki - Highway and Railway

Helsinki - fi/18Highway and RailwayRestricted procedure, deadline 6th May, 2002 for engineering and planning of the Vuosaari harbour access in Helsinki. Includes the Porvarinlahti highway tunnel, two tubes of 1.6 km each, 11.9 m-wide x 9 m-high, plus the Labbacka and Savio railway tunnels, two single tubes of 620 m and 13.5 km, 6.6 m-wide x 9 m-high. The rock type is granite or gneiss. Drill/blast is likely to be the excavation method with reinforced shotcreting for support and lining. Construction to start in 2004. Completion in 2008. Cost estimates are €32.2 million for the highway tunnels and €84.1 million for the two railway tunnels. Feasibility studies and preliminary engineering have been carried out by a consortium of Sito Group, JP Transplan, and LT Consultants. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 66, document 51904-2002 or contact Finnish road administration, Helsinki, fax +358 9 34199117. E-mail ronald.westermark@tiehallinto.fi 16/02. Ground and rock investigation studies for the Vuosaari harbour project are being carried out by Suomen Malmi, SCC Viatek and Geocenter/Finnish Road Enterprise. Cost €1 million. Planning and design is undertaken by SCC Viatek, Jaakko Pöyry Group and Finnish Consulting Engineers/LT-Consultants. Cost €4 million. Work started in August and should be finished in May 2003. SCC Viatek, LT-Consultants, SITO Yhtiöt (Finnish Consulting Engineers) and Tieliikelaitos (Finnish Road Enterprise) have established Finnroad. The scheme requires the Porvarinlahti highway tunnel (two tubes of 1.6 km each, 11.9 m-wide x 9 m-high) as well as the Labbacka and Savio railway tunnels (two single tubes of 620 m and 13.5 km, 6.6 m-wide x 9 m-high). More in E-News Weekly # 47. Visit www.tiehallinto.fi 47/02.Restricted call for tenders, deadline 14th April, 2003 for the design of contract RS5 including the 2 x 1.5 km Porvarinlahti highway tunnel and the 750 m Labbacka railway tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040834-2003, OJ S 47, or contact Tiehallinto, Helsinki, fax +358 934199117. E-mail ronald.westermark@tiehallinto.fi 14/03.Restricted call for tenders, deadline 14th April, 2003 for the design of contract RS6 including the 13.5 km Savio railway tunnel for freight, a single-track single-tube tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040835-2003, OJ S 47, or contact Tiehallinto, Helsinki, fax +358 934199117. E-mail ronald.westermark@tiehallinto.fi 14/03.Open call for tenders, deadline 2nd May, 2003 for request of information regarding the Porvarinlahti, Labbacka and Savio tunnels. The client wants to cooperate with contractors during further development of technical solutions, schedule and costs. Meetings with interested contractors will be held in May 2003. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=054965-2003, OJ S 63, or contact Tiehallinto, Helsinki, fax +358 934199117. E-mail kari.auranen@cm-urakointi.fi 14/03.Finnmap-Infra and Rockplan have won contract RS5 for the design of the 2 x 1.5 km Porvarinlahti highway tunnel and the 750 m Labbacka railway tunnel. Contract amount: 939,600 euros. Visit www.finnmap-infra.fi and www.rockplan.fi 03/04.JP-Suoraplan has pocketed contract RS6 for the design of the 13.5 km single-track single-tube Savio rail freight tunnel. Contract amount: 1.2 million euros. Visit www.poyry.com 03/04.Restricted procedure, deadline 26th April, 2004 for construction of the Porvarinlahti highway tunnel (2 x 1.6 km) and the Labbacka railway tunnel (620 m). Contract value: EUR22 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=047981-2004, OJ S 56, or contact Finnish Road Administration, Helsinki, fax +358 934199117. E-mail kari.auranen@cm-urakointi.fi. Read E-News Weekly 47/2002. 14/04.Restricted procedure, deadline 26th April, 2004 for construction of the Porvarinlahti highway tunnel (2 x 1.5 km) and the Labbacka railway tunnel (750 m). Drill/blast method. Contract value: EUR20 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=053774-2004, OJ S 63, or contact Finnish Road Administration, Helsinki, fax +358 934199117 or 9141132. E-mail kari.auranen@cm-urakointi.fi. This tender cancels and replaces the one published last week. Read E-News Weekly 47/2002. 15/04.Restricted procedure, deadline 12th July, 2004 for construction of the 13.5 km Savio railway tunnel to the Vuosaari harbour in Helsinki. This single-track tunnel is divided into five separate contracts. Each include drill/blast tunnelling and other construction works. Tender value of the five contracts: EUR65 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=093909-2004, OJ S 112, or contact Tiehallinto, Helsinki, fax +358 934199117. E-mail kari.auranen@cm-urakointi.fi 25/04.Skanska Tekra has secured a EUR23.7 million contract to construct the Porvarinlahti road tunnel, the Labbacka railway tunnel and the short section of the harbour road south of the road tunnel, as part of the Vuosaari harbour access in Helsinki. Tunnel work will begin in September 2004 and the road tunnel will be completed by 30th August, 2006. The entire contract will be completed by the end of 2006. About 400,000 cubic metres of rock will be excavated and used as fill in the harbour. The Porvarinlahti road tunnel will have a total length of 2 x 1,680 m, with one tunnel in each direction. The road tunnel will go under the Porvarinlahti and Labbacka Natura 2000 areas. The harbour railway line will cross the Porvarinlahti bridge and then enter a 750 m tunnel under Labbacka.The Vuosaari harbour project is a joint project undertaken by the City of Helsinki and the Finnish state. The Port of Helsinki is responsible for building the harbour. The VUOLI project is responsible for traffic connections and includes the Finnish Road Administration, the Finnish Rail Administration and the Finnish Maritime Administration. The last tunnel contract which remains to be awarded is for the 13.5 km Savio freight railway tunnel, a single-track single-tube tunnel. Visit www.vuosaarensatama.fi and www.skanska.com 36/04.Five contracts have been awarded for the excavation of a 13.5 km Savio railway tunnel from the Porvoo motorway to Savio and the Vuosaari harbour in Helsinki. The contracts are worth EUR65 million in all (VAT not included). Tunnel contracts TU 2 and TU 5, worth EUR11 million and EUR13.4 million, have been awarded to YIT. The total tunnel length is almost 6 km. Visit www.yit.fi 51-52/04.Lemcon Infra of the Lemminkainen Group has won contract TU 3, value EUR16.1 million, which includes a 4,111 m tunnel section plus an access tunnel and a ventilation shaft, and contract TU 6, worth EUR8.9 million, including a 1,622 m tunnel. Visit www.lemcon.fi or www.lemminkainen.fi 51-52/04.Kalliorakennus secured contract TU 4 for EUR5.4 million. It includes a 850 m tunnel section plus an option for 1,300 m, worth EUR9.8 million. Visit www.kalliorakennus.com 51-52/04.Cross section about 70 sq m depending on the curve of the rail track. Mainly good hard rock, a major difficult broken section in Myras area. Drill/blast method. The main portion of the tunnel will be bolted and shotcreted with and without steel fibres. The most difficult Myras section (about 200 m) will be supported by a bearing and watertight concrete structure. Mucking-out mainly by trucks (reloading outside access tunnels is not allowed for noise regulations and the rock will be delivered directly to the site of the new Vuosaari harbour). The project also includes four ventilation/escape shafts (55 m, 65 m, 60 m and 27 m deep) and four access tunnels. Work will start in each contract in December 2004 and be completed between spring and summer of 2007.The 19 km-long harbour railway line will be ready in 2008 when the new harbour goes into operation. About a million cubic metres of rock will be excavated and used to fill harbour structures. The tunnel will run as much as 60 m below the surface in some places. The environmental impact of excavation will be closely monitored. Numerous studies have been conducted to ensure that work will not cause damage to nearby buildings or nature. Visit www.vuosaarensatama.fi 51-52/04.Skanska Tekra broke through the 1,520 m Porvarinlahti road tunnel. The final blast was celebrated at a special ceremony including workers and guests, with the temperature around -20°C. Tunnelling began in September 2004. The contract will continue with sealing and reinforcing work and will be completed by the end of the year. Work will then proceed on ventilation, electricity, traffic control and other systems. The tunnel will have a total cost of EUR33.4 million and will be commissioned in autumn 2007.Skanska Tekra started excavation at the southern end and its Slovakian partner Skanska BS started from the northern side. The Porvarinlahti road tunnel is a twin bored tunnel. The contract also includes a 600 m railway tunnel under Labbacka, which is still being excavated. Visit www.vuosaarensatama.fi, www.skanska.fi and www.skanska.cz 07/06.Through its Finnish company Tunneltech established last year, the Orsta Group received a contract from the Finnish state, for a value of more than EUR9 million with option for a total value exceeding EUR12 million. The project includes major lining works (water protection, frost protection and finally fireproofing) for the Porvarinlahti highway tunnel, which forms part of the VUOLI project in Helsinki. Tunneltech is the contracting company, specializing in tunnel linings for road and railway tunnels. Orsta Group's Norwegian subsidary Tunnelteknikk will do the major part of the works. However, both Finnish and Norwegian staff will carry out the project.The Porvarinlahti tunnel is a twin tube of 1,500 m of length, 11,5 m of width and 9 m of height, with 16,000 sq m of lining for water, frost and fire. The option is the 650 m-long 8 m-wide 9 m-high Labbacka railway tunnel, with 13,000 sq m of lining. The well known Orsta system from Orsta Stal will be installed, with combi-coated rock support bolts with resin anchorage. Click fi/18 and here. Visit www.orsta.com and www.vuosaarensatama.fi/en/index.html 14/06.Restricted procedure, deadline 19th June, 2006 for finishing works (concreting, frost protection, waterproofing, etc.) of the 13.5 km Savio railway tunnel. The tunnel forms part of the Vuoli project, a new road and rail access to Helsinki Vuosaari harbour. Click here. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=097302-2006, OJ S 91, or contact Tiehallinto, Helsinki, fax +358 934199117 or 9141132. E-mail kari.auranen@cm-urakointi.fi 22/06.Lemcon received a EUR23.1 million contract for fitting works in the 13.5 km Savio railway tunnel. The assignment includes concreting in the vertical shafts, access tunnels and both tunnel portals, frost protection, waterproofing, track foundation structures, and fastening bolts for track equipment. The tunnel forms part of the Vuoli project, a new road and rail access to Helsinki Vuosaari harbour. Click here and fi/18. Visit www.lemminkainen.com 47/06.



Permalink

Finland, Helsinki - fi/17

Coal Storage

Four 60,000 t bunkers 75 m-deep and 40 m-diameter designed by Kalliosuunnielu for Helsingin Energia under construction by jv of Lemminkainen and YIT for completion 2003, value $45 million. Visit www.yit.fi 21/01. Under the Salmisaari power plant, four underground coal silos, of about 400,000 cu m, an underground refrigeration plant, 3 km of tunnel and shafts will be excavated. The coal will be moved from the surface to underground, and office buildings will replace the coal store above ground. Excavation and ventilation of the four silos will be a challenge, each having a diameter of 40 m and a height of 70 m. Drill/blast method. The new Sandvik Extra drifter-tool system will be used with a T35 thread on the shank adapter and R35 thread on the bit. The effective feed length of the rods is 6.1 metres. As the T35 thread allows the use of Sandvik Extra T35 MF extension rods in injection drilling, there is no need for conversion couplings. The hole diameter in tunnelling is 51 mm, and 54 mm in injection drilling with Retrac drill bits. The silos will be excavated with a Tamrock crawler drillrig in either 64 mm or 76 mm hole diameter, with extension rods and guide tubes as well as drill bits from Sandvik. The contractors are Lemminkäinen and YIT Construction. Design by Helsinki Energy and Rockplan. Budget of €50.4 million. Excavation to be completed in March, 2003. Visit www.sandvik.com, www.lemminkainen.fi and www.yit.fi 12/02.Excavation of four silos nearly complete in granite/gneiss, installing 6 m-long x 25 mm-diameter grouted rebar rockbolts in roofs on 1.8 m grid with 100 mm steel fibre reinforced shotcrete covered with 20 mm unreinforced layer, and 5 m-long rebar in sides on 2.5 m grid with 50 mm reinforced shotcrete covered with 50 mm unreinforced layer. Roofs formed using Atlas Copco Rocket Boomer profiling rigs, and bulk excavation using trackdrills. 2,500 cu m/day excavation. 3.5 km of tunnels complete. High pressure grouting using microcement with plasticizer and grout aid carried out by Craelius Unigrout truck. More from janne.lehto@yit.fi 47/02.



Permalink

Finland, Helsinki - fi/16

Highway

Award of contract for construction of 1.8 km road with 700 m-long cut and cover tunnel to Skanska Tekra for immediate start. Visit www.skanska.se 08/01.



Permalink

Finland, Turku - fi/15

Wastewater

Invitations to tender for engineering design expected 2001 for Kakola underground STW with 1.7 km of drill/blast tunnels and 250,000 cu m cavern in granite. Construction start 2002. Visit www.turku.fi 04/01.Restricted call for bids, deadline 20th October, 2003 for construction of the Kakola sewage plant including rock caverns and tunnels under the jail in the city area. Length is approximately 3.3 km, cross sections ranging from 30 to 180 square metres. Geology consisting of hard crystalline rock, mainly granite and mica gneiss. Drill/blast method of excavation with rock bolts, shotcrete and concreting as support and lining. Muck handling using dumper trucks and conveyors. Excavation in 2004-2005. Estimated cost for tunnelling: €15 million. Plancenter is consultant for process and engineering design. Rockplan is consultant for rock engineering design. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=156609-2003, OJ S 172, or contact Turun seudun puhdistamo Oy, Turku, fax +354 226332123. E-mail timo.anttila@turku.fi 39/03.Skanska Tekra has secured a EUR16.4 million excavation contract for the Kakolanmäki wastewater treatment plant in Turku. The client is Turun Seudun Puhdistamo. The plant is planned below the Kakola prison. The lowest excavation depth is -10 m, where the plant aeration basins are situated. Underground caverns are planned to create pre-clearing, aeration and after-clearing basins, four of each type. There is also a service tunnel around the whole basin complex, including a treatment basin for passing waters and rinsing basins. The pre-clearing rock chamber size is 42.5 m-long x 18 m-wide x 10.2 m-high. The aeration rock chamber has a 50 m length x 20 m width x 21.6 m height. The after-clearing rock chamber has a length of 112 m x width of 20 m x height of 10.4-11.9 m. The service tunnel is 18 m-wide x 183 m-long on its north side, 10.5 m-wide x 183 m-long on its south side, 254 m-long x 7 m-wide at the east side and 254 m-long x 20 m-wide at the west side. The main tunnels between the different basins are 183 m-long x 10.5 m-wide. Rock pillars between the basins are 18 m and 16 m thick. There are also plans to build a new sewage tunnel to the old wastewater treatment plant.Other underground works include one main access tunnel and four shafts to the underground cavern. The access tunnel is planned to be built from the administration building. A ventilation structure is also planned next to the administration building and shafts in every corner of the underground cavern. The main rock types are granite and migmatite. There are usually gouge filled discontinuities / joints. The open joints are located at the surface and in weakness zones. The joint fillings are carbonate, kaolin, chlorite and pyrites.The planned excavation method is drill/blast. When the main access tunnel is under excavation it is planned to use only one jumbo but when the excavation will have progressed to the rock chambers it is planned to use at least two jumbos or more if necessary. Systematic bolting and shotcreting will be used for support. In weakness zones or where the rock is of bad quality, more bolts and fibre-reinforced shotcrete will be implemented. The excavated material (900,000 bulk sq m) will be transported outside by trucks. Excavation will continue until early January 2006. When completed, the plant will treat sewage for at least 280,000 people. Visit www.skanska.com 36/04.Skanska Tekra will use a three-boom Rocket Boomer XL 3C and a two-boom Boomer L2 C from Atlas Copco for building the Kakolanmaki sewage treatment plant in Turku. The project involves the excavation of 460,000 cu m as well as related grouting and reinforcement works. Click fi/15. Visit www.boomer-rig.com 40/04.



Permalink

Competitive procedure with negotiation, deadline 29.05.2017, for increasing the Outlet Pipe Capacity / Pipe Jacking Contract for the Kakolanmäki Wastewater Treatment Plant. For free procurement documents please go to https://www.hankintailmoitukset.fi/fi/notice/view/2017-010986. Tenders or requests to participate must be submitted to PTCServices Oy, Helsinki, email  hankinnat@ptcs.fi, web http://www.turunseudunpuhdistamo.fi/hankinnat. Duration of the contract is 48 months. Contact Turun seudun puhdistamo Oy, attn Jarno Arfman,  Turku, tel +358 407126231, fax +358 22397077, email jarno.arfman@turku.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=164982-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=186187-2017. 20/17.



Permalink

Finland, Helsinki Region - fi/14

Metro

Proposed third metro line will link Ruoholati with Lauttasaari along an alignment yet to be decided up to 17 km long. Sections Grasviken to Drumso and Bjorkholmen to Otnas will be in twin 25 sq m tunnels using drill/blast with rockbolts and sprayed concrete. Final design underway with invitations to tender expected late-2002 for a start in 2003. July 2000.Accelerated restricted invitation to tender, deadline 24th September, 2008 for engineering related to the 13.9 km western extension of the Helsinki metro to Espoo. The section will all run underground in a twin tube tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234626-2008, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234627-2008, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234628-2008, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234629-2008, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234630-2008, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234631-2008, OJ S 176, or contact Länsimetro, Espoo, tel. +358 503471558 or fax +358 9141132. E-mail etunimi.sukunimi@espoo.fr or etunimi.sukunimi@sweco.fi. Visit www.lansimetro.fi 38/08.Länsimetro, which is owned jointly by the cities of Helsinki and Espoo, has awarded Sweco a project management contract, worth close to EUR10 million, in connection with the western extension of Helsinki's sole metro line that will link Helsinki and Espoo. The project is the largest infrastructure initiative of all time in Finland, with an estimated price tag of around EUR700 million. The western metro extension consists of a 13.5 km subway section with a total of eight stations (Lauttasaari, Koivusaari, Keilaniemi, Otaniemi, Tapiola, Niittymaa, provision made for a later station in Niittykumpu and Matinkylä), starting from the present end of the line in Ruoholahti. The extension will be completely underground. One of the biggest challenges will be to plan the extensive construction activities and material transports to avoid disruption to local residents or existing traffic flows during the building phase. The line extension is scheduled for completion at the end of 2013. Visit www.sweco.se and www.lansimetro.fi 40/08.Rock and tunnel engineering design contracts value EUR1.3 million awarded to Poyry by Lansimetro Oy for the Keilaniemi and Matinkyla tunnels and 5 stations together with HVAC and electrical engineering for the tunnels and shafts section of the whole 14 km-long Western Metro extension. Visit www.poyry.com. Lansimetro has commenced gathering information for a proposed restricted invitation to tender, deadline 30.12.2009, for extensive related activities such as quarrying, material transport and trackwork. More information from Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi, to whom expressions of interest, requests to participate, and tenders should be sent. Sweco in Helsinki may also be approached through Kari Auranen, Ulla Valtonen, or Aku Kallio, tel +358 108205000, e-mail etunimi.sukunimi@sweco.fi. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=044279-2009 11/09.



Permalink

Invitation to tender by restricted procedure, deadline 20.05.2009, for the construction of 800 m-long safety tunnel and Ruoholahti-Lauttasaarenranta metro section, part of the 13.9 km-long extension of Western Metro in Helsinki from Ruoholahti to Matinkyla. Contract duration 12 months. Click here for the alignment. For more contact Matti Kokkinen at Lansimetro, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=125947-2009. 20/09.



Permalink

Request for information from specialist design companies on rock blasting, construction, M & E, and rail works with respect to proposed 13.9 km-long twin-tube Western Metro with seven stations. Seven driving shafts and 15 vertical shafts are planned, with shaft site preparation in 2009. Rock blasting in tunnels starts in 2010 with a view to project completion in 2014. Visit tunnelbuilder archive fi/14 for full background to this project. Enrollment by Aku Kallio of Sweco PM Oy, PL 10491 (Tapiontori 3 A), 02070 Espoon kaupunki, Finland, e-mail aku.kallio@sweco.fi http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179956-2009 27/09.



Permalink

Lansimetro awarded ODEN Anlaggningsentreprenad AB, the fully-owned Swedish subsidiary of STRABAG construction group, the contract to establish a 1.8 km track tunnel with intermediate stations for the metro phase 1, LU1 Matinkyla in Helsinki, Finland. The works will start this month for completion November, 2013. The contract value is EUR27.12 million excluding VAT. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202041-2011, www.strabag.com and www.oden.se. 34/11.



Permalink

Solicitud de información a empresas especializadas en voladuras, construcción, M & E, y trabajos de construcción de ferrocarriles, con la intención de construir el Metro Occidental formado por 7 estaciones, 13,9 Km de longitud y de doble tubo. Están proyectados 7 ejes de conducción y 15 pozos verticales. Los túneles empezarán en 2010 para poder terminar el proyecto en el 2014. Viste el archivo fi/14 en Tunnelbuilder, si quiere tener acceso a los antecedentes de este proyecto. Para realizar la inscripción contacte con Aku Kallio de Sweco PM Oy, PL 10491 (Tapiontori 3 A), 02070 Espoon kaupunki, Finland, correo electrónico: aku.kallio@sweco.fi. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179956-2009 28/09.



Permalink

Invitation to tender by restricted procedure, deadline 28.08.2012, for tunnel construction planning of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contract duration 01.11.2012 to 30.9.2014. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232573-2012. 31/12.



Permalink

Invitation to tender by restricted procedure, deadline 28.08.2012, for railway planning of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contract duration 01.11.2012 to 29.12.2017. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232572-2012. 31/12.



Permalink

Invitation to tender by restricted procedure, deadline 28.08.2012, for PS Structural Engineering of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contract duration 01.11.2012 to 28.06.2019. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232571-2012. 31/12.



Permalink

Invitation to tender by restricted procedure, deadline 28.08.2012, for Architectural Design of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contract duration 01.11.2012 to 28.06.2019. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232567-2012. 31/12.



Permalink

Invitation to tender by restricted procedure, deadline 28.08.2012, for engineering services for the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contract duration 01.11.2012 to 28.06.2019. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232565-2012. 31/12.



Permalink

Invitation to tender by restricted procedure, deadline 28.08.2012, for architectural, engineering and planning services for the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contract duration 01.11.2012 to 28.06.2019. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=232564-2012. 31/12.



Permalink

Restricted invitation to tender, deadline 03.04.2013, for design, delivery and commissioning supervision of security lighting in underground stations, tunnel, safety tunnel access and exit on the 13.9 km-long extension of Helsinki metro. More information from Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082306-2013. 11/13.



Permalink

Restricted invitation to tender, deadline 16.04.2013, for Tapiola station construction on the west extension of Helsinki metro to Espoo (lot RU4). More information from Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098070-2013. 15/13



Permalink

Destia of Vantaa has been awarded the contract for building work in the West Metro tunnels between Lauttasaari and Keilaniemi (lot RU13A). Contract covers technical construction work in a 3.5 km-long section and construction of five vertical shafts, including surface buildings. Contract value EUR16.33 million, excluding VAT. More information from Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079338-2013. 15/13.



Permalink

Arkkitehtitoimisto CJN Oy of Espoo secured the EUR4.1 million contract, excluding VAT, for engineering services for the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=300860-2013. 37/13.



Permalink

Finnmap Infra Oy of Helsinki secured the EUR1,358,500 contract, excluding VAT, for tunnel construction planning of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309597-2013. 38/13.



Permalink

Poyry Finland Oy of Vantaa secured the EUR794,650 contract, excluding VAT, for railway planning of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309584-2013. 38/13.



Permalink

Poyry-Ramboll of Vantaa secured the EUR1,725,500 contract, excluding VAT, for PS Structural Engineering of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=309456-2013. 38/13.



Permalink

Konsulttiryhma PES-Arkkitehdit Oy ja Poyry Architects Oy of Helsinki secured lot 1 and 2, value EUR4,836,000, excluding VAT; Arkkitehtitoimisto ALA Oy of Helsinki secured lot 3 and 3, value EUR5,112,500, excluding VAT, for Architectural Design of the Western Metro extension from Matinkyla to Kivenlahti in Helsinki. Contact Espoo City Council, Espoo, e-mail hankinta@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=319760-2013. 40/13.



Permalink

Restricted invitation to tender, deadline 05.12.2013, for firefighting equipment in the tunnels and stations of the 13.9 km-long extension of Western Metro in Helsinki from Ruoholahti to Matinkyla. More information from Aku Kallio  at Sweco PM Oy, e-mail etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388798-2013. 47/13.



Permalink

Restricted invitation to tender, deadline 03.02.2014, for uninterruptible power supply (UPS) systems on the 13.9 km-long extension of Helsinki metro to Espoo. Duration of contract 17 months from award. Contact Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. More information from Aku Kallio at Sweco PM, tel +358 405260671, e-mail etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=010360-2014. 03/14.



Permalink

Restricted invitation to tender, deadline 03.02.2014, for installation work for GSM, VIRVE, WLAN network in the 13.9 km-long extension of Helsinki metro to Espoo. Duration of contract 17 months from award. Contact Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. More information from Aku Kallio at Sweco PM, tel +358 405260671, e-mail etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=010316-2014. 03/14.



Permalink

Siemens of Espoo secured the EUR3,499,097 contract, excluding VAT, for fire-alarm system installation work in the western extension of Helsinki's sole metro line that will link Helsinki and Espoo. Duration of contract 28 months from award. Contact Lansimetro, att.n Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065249-2014. 10/14.



Permalink

Invitation to tender by restricted procedure, deadline 27.08.2014, for excavation work of Kivenlahti (lot LU26A) and Espoonlahti (lot LU24A) tunnels in the Western Metro extension from Matinkyla to Kivenlahti. Contract duration 10 months after award. Contact Espoo City Council, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=252184-2014. 31/14.



Permalink

Invitation to tender by restricted procedure, deadline 08.08.2014, for excavation work of Sammalvuoren (lot LU5A) and Finnoon (lot LU1A) tunnels in the Western Metro extension from Matinkyla to Kivenlahti. Contract duration 11 months after award. Contact Espoo City Council, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=216394-2014. 31/14.



Permalink

Not awarded: the restricted invitation to tender, deadline 03.02.2014, for uninterruptible power supply (UPS) systems on the 13.9 km-long extension of Helsinki metro to Espoo. Contact Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=325252-2014. 40/14.



Permalink

Restricted invitation to tender, deadline 16.10.2014, for uninterruptible power supply (UPS) systems on the 13.9 km-long extension of Helsinki metro to Espoo. Duration of contract 15 months from award. Contact Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. More information from Aku Kallio at Sweco PM, tel +358 405260671, e-mail etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328989-2014. 40/14.



Permalink

Palokatkomiehet of Parainen secured the EUR246,599 contract, excluding VAT, for firefighting equipment in the tunnels and stations of the 13.9 km-long extension of Western Metro in Helsinki from Ruoholahti to Matinkyla. Contact Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328947-2014. 40/14.



Permalink

Restricted invitation to tender, deadline 31.03.2015, for delivery of transport equipment and auxiliary products to Western Metro of Helsinki and HKL (Helsinki City Transport). Duration of contract 18 months from award. Contact Matti Kokkinen at Lansimetro in Espoo, tel +358 503471558, e-mail etunimi.sukunimi@espoo.fi. More information from Aku Kallio at Sweco PM, tel +358 405260671, e-mail etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=87674-2015. 11/15.



Permalink

Invitation to tender by restricted procedure, deadline 21.05.2015, for vibration monitoring and measurements during Western Metro extension from Matinkyla to Kivenlahti. Contract duration 30 months after award. Contact Espoo City Council, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=150318-2015. 19/15.



Permalink

Restricted invitation to tender, deadline 07.07.2015, for delivery, instaRestricted invitation to tender, deadline 07.07.2015, for delivery, installation and running of rock mechanical monitoring devices during the construction of the Matinkyla - Kivenlahti section of the West metro in Helsinki. The new section will be 7 km-long with five new underground stations (Finnoo, Kaitaa, Soukka, Espoonlahti and Kivenlahti) and the underground Sammalvuori metro depot. Duration of contract 50 months from award. Contact Lansimetro Oy, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi   or  Sweco PM Oy, attn Aku Kallio, tel +358 405260671, email etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210546-2015. 25/15.




Permalink

Restricted invitation to tender, deadline 07.07.2015, for site measurements for the construction of the Matinkyla - Kivenlahti section of the West metro in Helsinki. The new section will be 7 km-long with five new underground stations (Finnoo, Kaitaa, Soukka, Espoonlahti and Kivenlahti) and the underground Sammalvuori metro depot. The measurements are both above ground and underground. Duration of contract 50 months from award. Contact Lansimetro Oy, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi or Sweco PM Oy, attn Aku Kallio, tel +358 405260671, email etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=210545-2015. 25/15.



Permalink

Restricted invitation to tender, deadline 23.06.2015, for construction of LU26 Kivenlahti station and its tunnels. The station is part of the 7 km-long Matinkyla - Kivenlahti section of the West metro in Helsinki with five new stations and a metro depot at Sammalvuori. Duration of contract 20 months from award. Contact Lansimetro Oy, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi or Sweco PM Oy, attn Aku Kallio, tel +358 405260671, email etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=189700-2015. 25/15.



Permalink

Restricted invitation to tender, deadline 23.06.2015, for construction of LU24 Espoonlahti station and 1.5 km of tunnels. The station is part of the 7 km-long Matinkyla - Kivenlahti section of the West metro in Helsinki with five new stations and a metro depot at Sammalvuori. Duration of contract 20 months from award. Contact Lansimetro Oy, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi  or Sweco PM Oy, attn Aku Kallio, tel +358 405260671, email etunimi.sukunimi@sweco.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=189701-2015. 25/15.



Permalink


Restricted invitation to tender, deadline 07.08.2015, for design, supply and installation of signalling for the Ruoholahti-Matinkyla section of the West metro in Helsinki. The underground section will be 13.9 km-long with 7+1 stations. Duration of contract 10 months from award. Contact Lansimetro Oy, attn Matti Kokkinen, Espoo, tel +358 503471558, e-mail matti.kokkinen@espoo.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=255389-2015. 30/15.




Permalink

Negotiated invitation to tender, deadline 14.03.2018, for the construction work of the Kivenlahti Station RU26 on  the Matinkyla-Kivenlahti project.

The metro in the Helsinki metropolitan area is set to continue from Ruoholahti via Lauttasaari to Espoo. In the first phase, a rail line of 14 km from Ruoholahti to Matinkylä was completed including 8 new stations.

The Matinkyla–Kivenlahti stretch of the west metro will be the next construction phase consisting of 7 km and including the stations Finnoo, Kaitaa, Soukka, Espoonlahti, and Kivenlahti. The duration of the contract will be 50 months.

Tenders must be submitted electronically via https://tarjouspalvelu.fi/lansimetro?id=176377&tpk=48b1afd0-3924-44dd-a18e-e1734e76dbdf.

Contact Lansimetro Oy, Espoo, email hankinnat@lansimetro.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=090567-2018.

09/18.



Permalink

Negotiated invitation to tender, deadline 09.04.2018, for the construction work of the Kaitaa Station RU22 on  the Matinkyla-Kivenlahti stretch of the west metro in Helsinki consisting of 7 km and including the stations Finnoo, Kaitaa, Soukka, Espoonlahti, and Kivenlahti. The duration of the contract will be 50 months. Tenders must be submitted electronically via https://tarjouspalvelu.fi/lansimetro?id=180779&tpk=91664e4e-fe6e-4b21-be61-27a8748cc0a6.

Contact Lansimetro Oy, Espoo, email hankinnat@lansimetro.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=133361-2018.13/18.



Permalink

Negotiated invitation to tender, deadline 07.01.2019, for the track superstructure on 7km of the Matinkyla-Kivenlahti stretch of the Helsinki metro. The duration of the contract will be 50 months. Tenders must be submitted electronically via https://tarjouspalvelu.fi/lansimetro?id=213018&tpk=e4c186b2-99d3-4b3b-bb39-54875d50b99c.

Contact Lansimetro Oy, Espoo, email hankinnat@lansimetro.fi. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=553470-2018.

51/18.



Permalink

Prior information to tender, deadline 07.01.2019, for tunnel and track maintenance support works on the Helsinki metro. Estimated date of publication of a notice or invitation to tender under this procedure will be 09/08/2024. Contact HKL - Helsingin Kaupungin Liikenneliikelaitos, attn Hansel Oy, Helsinki, tel +358 294444200, email kilpailutus@hansel.fi; Lansimetro Oy, attn Hansel Oy, Espoo, email kilpailutus@hansel.fi. Visit https://ted.europa.eu/en/notice/-/detail/256916-2024. Ref.n. 509116. 18/24. 



Permalink


Open invitation to tender, the deadline was 30/09/2024, for auxiliary works for the tunnel structures and track maintenance, as well as rail wheel extender services for the Helsinki metro line and public transport in Helsinki-Uusimaa region.  The contract is composed of  two lots. Click here for bid/tender documents and where tenders must be sent. Value of the contract is EUR1.82 million, excluding VAT. Duration of contract 48 months. Contact Paakaupunkiseudun Kaupunkiliikenne Oy and/or Lansimetro Oy and/or Helsingin Kaupungin Liikenneliikelaitos, tel +358 294444200, email kilpailutus@hansel.fi. Visit https://ted.europa.eu/en/notice/-/detail/562399-2024 and https://ted.europa.eu/en/notice/-/detail/506182-2024. Ref.n. 509116. 39/24.



Permalink


Prior information notice for the market dialogue/presentation that will take place on 18 December 2024 at 09:00 - 11:00 in relation to the Rautatientor station modernisation on the Helsinki metro. A questionnaire related to the market dialogue will be sent to participants on 19/12/2024. Responses to the survey shared in the market dialogue must be submitted by 19/01/2025. The request for participation in the project tender will be published in winter 2025. The submission of offers and selection of the contractor will take place in spring 2025. Registration for the market dialogue must be made by 5 December 2024 at 12:00 via the portal https://tarjouspalvelu.fi/.Contact Paakaupunkiseudun Kaupunkiliikenne Oy, Helsinki, tel +358 951046000, email kilpailutus@kaupunkiliikenne.fi. Visit https://ted.europa.eu/en/notice/-/detail/701912-2024 Ref. n. 772645. 47/24.



Permalink