Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Switzerland

Switzerland, Zurich - ch/51

Water Supply

Electrowatt Infra has been commissioned by the Water Supply Department of the City of Zurich to design a 7 km tunnel section between a lake water works and a reservoir in the Zurich area. The contract value is €2 million. Electrowatt Infra's services include conceptual design, call for tenders, detail design and project management. Electrowatt Infra also has an option for the site supervision. The project comprises three shafts, each 100 m-deep, a 7 km-long tunnel with a diameter of 3.5 m and a cavern with mechanical installations. Visit www.ewi.ch and www.poyry.com 26/03.



Permalink

Switzerland, Gotthard - ch/50

Highway

The Swiss Parliament voted in favour of constructing a second road tunnel through Mount Gotthard, doubling capacity on the main axis linking Germany and Italy through the Swiss Alps. A majority of upper house lawmakers accepted the proposal for a second tunnel to reduce congestion and improve safety on the artery. The lower house approved the plan in December. The construction would cost about CHF900 million ($689 million). 25/03.



Permalink

Open invitation to tender, deadline 26.03.2010, for management and safety equipment audit in Gotthard road tunnel (phase 2). Contract duration 01.07.2010 - 01.07.2012. For more visit http://www.simap.ch/shabforms/servlet/web/DocumentSearch?NOTICE_NR=455703. Written questions before 05.03.2010. Offers to OFROU, att.n Angebot 090202 EFFIGO-GST, Ingenieurleistungen BSA, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056245-2010. 09/10.



Permalink

Amstein + Walthert AG (Zurich) secured the EUR424,570 contract for management and safety equipment audit in Gotthard road tunnel (phase 2). Contact OFROU, att.n Angebot, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=163550-2010. 23/10.



Permalink

Open invitation to tender, deadline 02.07.2012, for refurbishment of the 32.4 km-long Pass Gotthard Road section, including several tunnels. Contract duration 31.08.2012-31.12.2020. For more visit http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=735591. Written questions before 11.06.2012. Offers to OFROU, attn Angebot 080082 EP Gotthard, Passstrasse, PV TP4 BSA, Zofingen, tel +41 6274575-11, fax -90, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=162216-2012. 22/12.



Permalink

Open invitation to tender, deadline 22.02.2013, for engineering services and local management during renewal of the energy supply system in Gotthard road tunnel, between Goeschenen and Airolo power stations. Contract duration 01.05.2013 to 30.06.2017. For more contact OFROU, Zofingue, e-mail beschaffung.zofingen@astra.admin.ch and visit http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=759909. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008052-2013. 03/13.



Permalink

Open invitation to tender, deadline 31.05.2013, for the General Project (GP) and Executive Design (AP, option) for the construction of the second tube of Gotthard road tunnel, between Goeschenen and Airolo and linking work with existing tube. Duration of contract October, 2013 to 31.12.2015 (GP). Time limit for requests for documents is 26.04.2013. Contact USTRA, Support sector, att.n N02, Second tube San Gottardo: IP, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90, e-mail acquistipubblici@astra.admin.ch. Visit https://www.simap.ch and http://www.news.admin.ch/message/index.html?lang=it&msg-id=48389. Project n. 96896. Pubblication n. 770123. 15/13.



Permalink

Open invitation to tender, deadline 31.05.2013, for the Environment Impact Study (EIS) 2nd phase (3rd phase optionally) for the construction of the second tube of road Gotthard tunnel, between Goeschenen and Airolo. Duration of contract October, 2013 to 31.12.2015 (RIA 2nd phase). Time limit for requests for documents is 26.04.2013. Contact USTRA, Support sector, att.n N02, Second tube San Gottardo: making RIA, Bellinzona, tel +41 91 8206811, fax  +41 91 8206890, e-mail acquistipubblici@astra.admin.ch. Visit https://www.simap.ch and http://www.news.admin.ch/message/index.html?lang=it&msg-id=48389. Project. Project n. 96946. Pubblication n. 770213. 15/13.



Permalink

Inge Cielo+ C/O Lombardi AG of Minusio secured the EUR2.8 million contract, excluding VAT, for the General Project (GP) and Executive Design (AP, option) for the construction of the second tube of Gotthard road tunnel between Goeschenen and Airolo, and linking work with existing tube. Contact Ustra, Support sector, att.n N02, Second tube San Gottardo,Bellinzona, e-mail acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=289318-2013. 36/13.



Permalink


Open invitation to tender, deadline 29.04.2016, for geodetic measurements for the construction of the second tube of the Gotthard road tunnel. The duration of the contract is from July 2016 to December 2021. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=907253. Contact Ofrou, Bellinzona, tel  +41 58 469 68 11, fax  +41 58 469 68 90, e-mail acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=96993-2016 Ref.n. 120043. 12/16.




Permalink


Open invitation to tender, deadline 19.07.2016, for high voltage installations in the Gotthard road tunnel, N2, Lot 3b NSHV. Duration of the contract is from April 2017 to April 2019. For further information use http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=916823.

Contact Ofrou, Zofingen, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188181-2016. Ref.n. 080107. 22/16.




Permalink

Bernasconi e Forrer Ingegneria e Misurazioni SA from Sorengo secured the EUR150,496 contract, excluding VAT, for geodetic measurements for the construction of the second tube of the Gotthard road tunnel. The duration of the contract is from July 2016 to December 2021. For further information go to http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=919109. Contact Ofrou, Bellinzona, tel  +41 58 469 68 11, fax  +41 58 469 68 90, e-mail acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=204035-2016. Ref.n. 120043. 24/16.





Permalink


Open invitation to tender, deadline 09.09.2016, for 2017-2026 maintenance planning of the Gotthard road tunnel, N2. For further information contact Ofrou, Zofingen,  e-mail beschaffung.zofingen@astra.admin.ch and visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=249689-2016. 30/16.




Permalink


InfraTech AG from Stans secured the EUR7.45 million contract, excluding VAT, for high voltage installations in the Gotthard road tunnel, N2, Lot 3b NSHV. For further information use http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=940207.

Contact Ofrou, Zofingen, e-mail beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=405779-2016. Ref.n. 080107. 46/16.




Permalink

EBP Schweiz AG from Zurich secured the EUR 1.67 million contract for 2017-2026 maintenance planning for the Gotthard road tunnel, N2. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR= 942665. Contact Ofrou, Zofingen,  e-mail beschaffung.zofingen@astra.admin.ch- Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=422289-2016. 48/16.



Permalink

Open invitation to tender, deadline 12.07.2018, for the support to the commitment BHU (construction and BSA) from the Detailed Project (GP) to the commission and ending acts (General management DGL, option) for the construction of the second tube of Gotthard road tunnel. Duration of contract from 01/10/2018 to 31/12/2030. Time limit for requests for question is 06.06.2018. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1021901 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1021931 (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1021953 (French).

Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=227429-2018. Project n. 120043. 22/18.



Permalink

Open invitation to tender, deadline 17.07.2018, for The General Project (GP) for the construction of the second Gotthard "Secondo tubo San Gottardo" tube was approved by the Federal Council in autumn 2017 and the implementation project (AP) was launched publicly in spring 2018.

The subject of this mandate are for project planning services and specialist site management in the areas of tunnelling and geotechnics (incl. materials management), route and civil engineering structures as well as the overall management of the dossier for the phases from the detailed project up to and including commissioning and completion.

The estimated time required for the order is approx. 240,000 hours.

For a detailed description of the services, see tender documents.

Time limit for requests for question is 13.06.2018. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1022541

(German) and/or

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1022567 (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1022569

(French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820

68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=229984-2018. Project n. 120043. 22/18.



Permalink

Open invitation to tender, deadline 18.07.2018, for planning services and general management in the areas of tunnelling and geotechnics, route and civil engineering structures for the reorganization of the Airolo Junction, part of the construction of the Second Tube of Gotthard Tunnel. Time limit for requests for question is 12.06.2018. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1022963 (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1022989 (French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234501-2018. Project n. 120043. 22/18.



Permalink

Open invitation to tender, deadline 19.07.2018, for engineering services for the operating and safety systems, ventilation included, for the construction of the Second Tube of Gotthard Tunnel. The duration of the contract is from 01/10/2018 to 31/12/2030, Time limit for requests for question is 15.06.2018. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1023073 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1023089 (Italian) and/or

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1023107

(French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820

68 90, email acquistipubblici@astra.admin.ch.

Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=236663-2018.

Project n. 120043. 22/18.



Permalink

Open invitation to tender, deadline 23.11.2018, for geologist services, senior project geologist for the (DP) phase, chief client geologist for the construction phase up to and including commissioning of the second Tube of Gotthard Tunnel.

The General Project (GP) for the construction of the second Gotthard tunnel "Secondo tubo San Gottardo" was approved by the Federal Council in autumn 2017. The final draft was published in spring 2018. The purpose of this contract is: the services of an expert geologist at the service of the contracting authority.

During the final Project phase and thereafter, for the entire duration of the execution work, the Geologist must monitor and support, on behalf of FEDRO, either the design office or the contracting authority, for all aspects concerning geology and hydrogeology.

The mandate concerns either the project to build the second Gotthard tunnel or the project to redevelop the connection to the village of Airolo. The budget for the mandate is estimated in about 13,000 hours.

Time limit for requests for questions is up until 22.10.2018. The duration of the contract is from 01.03.2019 to 31.12.2030. Further information from

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1042419 (German),

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1042565 (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1042571

(French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820

68 90, email acquistipubblici@astra.admin.ch . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=455804-2018.

Project n. 120043. 42/18.




Permalink

The consortium IG ILBP BSA c/o IM Maggia Engineering AG from Locarno, comprised of IM Maggia Engineering AG, Basler & Hofmann AG, Lombardi AG and Pöyry Schweiz AG, secured the EUR6.80 million contract (CHF7.76 million), excluding VAT, for engineering services for the operating and safety systems (ventilation included) for the construction of the Second Tube of the Gotthard Tunnel. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041509  (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041513

(Italian) and/or

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041517 (French).

Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=449712-2018.

Project n. 120043. 44/18.



Permalink

The group Airo c/o Pini Swiss Engineers SA from Lugano, which includes Pini Swiss Engineers SA, Project Partners Ltd Consulting Engineers, Studio d'ingegneria Giorgio Masotti and Studio Gendotti SA secured the EUR2.89 million contract (CHF3.30 million), excluding VAT, for planning services and general management of tunnelling and geotechnics, route and civil engineering structures for the reorganization of the Airolo Junction, part of the construction of the Second Tube of Gotthard Tunnel. Further information from  http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041899  (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041907 (French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90,  email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=453455-2018. Project n. 120043. 44/18.



Permalink

The group IG Nuovo Gottardo c/o Lombardi SA Ingegneri Consulenti from Minusio, which includes  Lombardi SA Ingegneri Consulenti, B+S AG, ILF Beratende Ingenieure AG and Emch+Berger AG Bern secured the EUR20.38 millioni contract (CHF23,28 million), excluding VAT, for engineering services in the fields of tunnelling,  geotechnics, route, manufacturing as well as the overall management of the dossier for the phases from the detailed project up to and including commissioning and  completion. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041287 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041295  (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1041303 (French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=449714-2018. Project n. 120043. 44/18.



Permalink

Open invitation to tender, closing date 05.12.2018, for Client support for information + communication (external communication agency) for the construction of the second Gotthard tube (2TG). The contract includes an option for support information + communication during the refurbishment of the existing tube (1TG). Duration of the contract is from 01/04/2019 to 29/12/2028. Further information from  http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1044391 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1044455 (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1044503 (French). Contact Ofrou, Bellinzona, tel +41 91 820 68 11, fax  +41 91 820 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=479144-2018. Project n. 120043. 44/18.




Permalink

Open invitation to tender, deadline 16.09.2019, for traffic specialist services for the MK phase - intervention plan, detail project up to commissioning/completion works (the AP phase - executive project is optional) for  the global Gotthard road tunnel system on the N2. The 16.9 km long Gotthard road tunnel, opened in 1980, and needs comprehensive renovation due to age. Nevertheless, to ensure that the most important north-south connection can be maintained, it has been decided to build a second tube to allow for rehabilitation of the existing tunnel. Duration of the contract is 168 months. Further information from

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086559 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086763

(French)  and/or

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086757 (Italian).

Contact Ofrou, Zofingen, tel +41 58 482 75 11, fax +41 58 482 75 90, email beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358651-2019.

Ref.n. 160082. 31/19.



Permalink

Open invitation to tender, deadline 30.09.2019, for client support services for the stages of the concept/execution and intervention project (stages from tendering to commissioning/completion are optional) for the Gotthard road tunnel renovation on the N2. The 16.9 km long Gotthard Road Tunnel, opened in 1980, and needs comprehensive renovation due to its age. Until 2010, a Global Conservation Concept (EK) was developed for the global project, focusing on solution without the construction of a second tunnel tube (2TG). The renovation measures proposed in the EK are therefore to be reviewed at the beginning of the project and new alignment study  has to be carried out taking into account the new conditions.

Duration contract 72 months. Further information from

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086329 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086401

(French) and/or

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086369 (Italian).

Contact Ofrou, Zofingen, tel +41 58 482 75 11, fax +41 58 482 75 90, email beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358647-2019.

Ref.n. 160082. 31/19.



Permalink

Open invitation to tender, deadline 30.09.2019, for the design of the tunnel/ geotechnical, alignment and infrastructure sectors, as well as for the responsibility for the overall dossier from the MK phase - intervention plan (the AP phase - executive project is optional).  The 16.9 km long Gotthard Road Tunnel, opened in 1980, needs comprehensive renovation due to its age. Until 2010, a Global Conservation Concept (EK) was developed for the global project, focusing on a solution without the construction of a second tunnel tube (2TG). The renovation measures proposed in the EK are therefore to be reviewed at the beginning of the project and new alignment study has to be carried out taking into account the new conditions. Duration contract 72 months. Further information from

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086525 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086541

(French) and/or

http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1086559 (Italian).

Contact Ofrou, Zofingen, tel +41 58 482 75 11, fax +41 58 482 75 90, email beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358642-2019.

Ref.n. 160082. 31/19.



Permalink

Open invitation to tender, deadline 20/12/2019, for a ventilation expert for projects N02EP 1TG and N02 2TG which are related to the construction, operation and maintenance phases of the second tube of the N02 road Gotthard tunnel. The duration of the contract is from 01/04/2020 to 31/12/2032. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1101893 (German) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1102101 (Italian) and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1102971 (French). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=521395-2019. Ref.n. 120043. 45/19.



Permalink

Open invitation to tender, deadline 20/12/2019, for the local management in the North Section during the construction of the second Gotthard tunnel. The  duration of the contract is from 01/04/2020 to 31/12/2030. For tender documents please click here, here, here and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11,  fax  +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 47/19.



Permalink

Open invitation to tender, deadline 17/01/2020, for the local management in the South Section during the construction of the second Gotthard tunnel.

The duration of the contract is from 01/04/2020 to 31/12/2030. For tender documents please click here (Italian),  here (German),  here (French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11,  fax  +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Ref.n. 120043. 48/19.



Permalink

The Consortium DL-BEDRINA, c/o Pini Swiss Engineers SA - Lugano (Pini Swiss Engineers SA + Renzo Tarchini Cantieri&Contratti SA + AF Toscano) secured the EUR26.44 million (CHF27.99 million) contract, excluding VAT, for the local management in the South Section during the construction of the second Gotthard tunnel. For tender documents please click here (Italian),  here (German),  here (French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11,  fax  +41 58 469 68 90, email acquistipubblici@astra.admin.ch.Ref.n. 120043. 18/20.



Permalink

The Consortium Ingenieurgemeinschaft (IG) 2G-BN, c/o IUB Enginnering AG - Bern (IUB Enginnering AG + Basler&Hofmann AG + Gähler und Partner AG + IM Maggia Engineering SA + Studio Ingegneria Sciarini SA) secured the EUR21.59 million (CHF22.84million) contract, excluding VAT, for the local management in the North Section during the construction of the second Gotthard tunnel. For tender documents please click here, here, here and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11,  fax  +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 18/20.



Permalink

Open invitation to tender, deadline 28/08/2020, for the transfer of the current infrastructure and service for the  north tunnel of the first tube of the Gotthard road tunnel (1TG) at Goschenen (Lot 242). Includes preparation of the construction of the second Gotthard tunnel on the N2 motorway.  Duration of the contract is from  04/01/2021 to 31/01/2023. For tender documents please click here   (German/French) and here. Contact Ofrou, Bellinzona, tel+41 58 469 68 11,  fax  +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Ref.n. 120043



Permalink

Open invitation to tender, deadline 31/07/2020, for measurement and monitoring during construction of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02. The duration of the contract is from 01/10/2020 to 31/12/2030. For tender documents please click here (Italian),  here (German),  here (French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 26/20.






Permalink


Open invitation to tender, deadline 07/10/2020, for  vibration monitoring during construction of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02. The contract includes the monitoring in the first tube and in the railway tunnel. The duration of the contract is from 01/01/2021 to 31/12/2030. For tender documents please click here (German),  here (Italian),  here (French) and here. Contact Ofrou, Bellinzona, tel +41 58

469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.chRef.n. 120043. 35/20.





Permalink


Open invitation to tender, 14/12/2020, for the access tunnel excavations and northern logistic works  (Lot 243), part of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02. The duration of the contract is from 26/04/2021 to 29/12/2023. For tender documents please click here (German/French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 37/20.





Permalink


Grunder Ingenieure AG from Burgdorf secured the contract EUR1.75 million (CHF1.89  million) contract, excluding VAT,  for measurement and monitoring during construction of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02. The duration of the contract is from 01/10/2020 to 31/12/2030. For tender documents please click here (French),  here (Italian),  here (German) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 39/20.

 




Permalink


The open invitation to tender, deadline 07/10/2020, for  vibration monitoring during construction of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02 has been interrupted. The contract included the monitoring in the first tube and in the railway tunnel. For tender documents please click here (Italian),  here (German),  here (French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 39/20. 

 




Permalink


Open invitation to tender, deadline 05/11/2020, for  vibration monitoring during construction of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02. The contract includes the monitoring in the first tube and in the railway tunnel. The duration of the contract is from 01/01/2021 to 31/12/2030. For tender documents please click here (German),  here (Italian),  here (French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Ref.n. 120043. 41/20.

 




Permalink


Open invitation to tender, deadline 10/03/2021, for  electric installations  in the safety & maintenance  tunnel section of the 2nd Gotthard road tunnel (2TG) project on the N02. The duration of the contract is from 12/05/2021 to 30/08/2024. For tender documents please click here (German),  here (Italian),  here (French) and http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=057086-2021here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Ref.n. 120043. 05/21. 

 




Permalink


The JV Implenia Schweiz AG from Wallisellen (leader, 40%),Webuild SpA from Milan, CSC Costruzioni SA from Lugano (40%) and Frutiger AG from Thun (20%) secured the EUR 78.25million contract (CHF86.49 million contract), excluding VAT, for the access tunnel excavations and northern logistic works  (Lot 243), part of the 2nd tube of the Gotthard road tunnel (2TG) project on the N02. For further on the tender please click here (German), here (French) and here. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Ref.n. 120043. 11/21.  

 




Permalink


Open invitation to tender, deadline 23/11/2021, for the construction of the main South tunnel or 2nd tube of the Gotthard road tunnel (2TG) on the N02 (Lot 341). For tender documents please click here (German),  here (Italian),  here (French) and here . The duration of the contract is from 01/06/2022 al 31/12/2029. Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Ref.n. 120043. 41/20. 

 




Permalink



Open invitation to tender, deadline 30/07/2021, for a tunnel engineer from Detailed design phase to commissioning for the 2nd Gotthard road tunnel (2TG) project on the N02. The duration of the contract is from 03/01/2022 to 31/12/2030. For tender documents please click here (German),  here (Italian) and  here (French). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. For further on TED tender, please click here.  Ref.n. 120043. 26/21.  

 




Permalink


Open invitation to tender, deadline 27/08/2021, for the designing phase, the tendering phase and the implementation phase up to commissioning, including local construction management for technical area 3 (ventilation) of the North and South tubes of the Gotthard motorway tunnel and of Airolo tunnel on the N2. This mandate includes coordination and support for the integration of the ventilation system (installation) into the higher-level control system of the Wassen - Stalvedro entire project perimeter. For tender documents please click here (German), here (French) and here (Italian). Duration of the contract will be 132 months. Contact USTRA, Zofinguen, tel +41 627457511, fax +41 627457590, email beschaffung.zofingen@astra.admin.ch.  For further on TED tender, please click here and here.  Ref.n. 160082/120043. 26/21.

 

 




Permalink


Open invitation to tender, closing date 10/09/2021, for the project planning phase, the tendering phase and the implementation phase up to commissioning, including local construction management, for department 5 (monitoring systems) and department 6 (communication and control technology) of the north and south tubes of the Road Gotthard tunnel, the Airolo tunnel and the north and south areas (Wassen - Stalvedro); overall coordination, project planning and construction management of the integration of all controls from all departments 1 to 8 (energy, lighting, ventilation, Signalization, ancillary systems) in the higher-level infrastructures (higher-level control system and communication system) for the entire project perimeter (Wassen-Stalvedro). The coordination and support of the integration of the controls of the departments 5 and 6 (page Annex) into the higher-level control system of the entire project perimeter (Wassen - Stalvedro) are also part of the present mandate.Duration of the contract is 132 months. For tender documents please click here (German),  here (French) and here (Italian). Contact Ofrou, Zofingen, tel +41 58 482 75 11, fax +41 58 482 75 90, email beschaffung.zofingen@astra.admin.ch. For further on TED tender, please click here.  Ref. n. 120043/160082. 28/21.

 




Permalink


Open invitation to tender, deadline 17/09/2021, for all tests for the client's construction laboratory for materials and work for the 2nd Gotthard road tunnel (2TG) project on the N02 motorway. The contract also includes tests in connection with the excavated material and its preparation. The services are provided both outdoors and underground. The duration of the contract is from 01/12/2021 to 31/12/2030. For tender documents and more detailed information please click here (Italian), here (German)  and  here (French). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. For further on TED tender, please click here.  Ref.n. 120043. 30/21.   

 




Permalink


Open invitation to tender, deadline 06/10/2021, for the design, submission, implementation,   commissioning and  local management for the equipment (Energy distribution, Lighting, Installation monitoring, Communication and management system, auxiliary installations) renewal  as part of the N02  Gotthard motorway tunnel.  The contract also includes coordination and support for the integration of facilities into the current Senior Management System (BLE).  For tender documents and more detailed information please click here (German)  and  here (French). The duration of the contract is from 01/02/2022 to 31/12/2025. Contact Ofrou, Zofingue, email beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=405805-2021.  Ref.n. 190045. 33/21.    



Switzerland-Zofingue: Engineering services

2021 / S 152-405805

Contract notice

Services

Legal Basis:

Directive 2014/24 / EU

Section I: Contracting authority

I.1)Name and addresses

Official name: Federal Roads Office OFROU Branch of Zofingue
Postal address: Brühlstrasse 3
Town: Zofingue
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 4800
Country: Switzerland
Contact person: project management south
Internet address (es):
Main address: https://www.simap.ch
Address of the buyer profile: www.astra.admin.ch

I.3)Communication

Access to the procurement documents is restricted. Further information can be obtained at: http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1210307

Additional information can be obtained from the abovementioned address

Tenders or requests to participate must be submitted to the following address:

Official name: Federal Roads Office OFROU Zofingen branch
Postal address: Brühlstrasse 3
Town: Zofingue
Postal code: 4800
Country: Switzerland
Contact person: project management south
NUTS code: CH0 Schweiz / Switzerland / Svizzera
Internet address (es):
Main address: https://www.simap.ch

I.4)Type of the contracting authority

Ministry or any other national or federal authority, including their regional or local subdivisions

I.5)Main activity

General public services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

N02,190045 Erhalt BSA GST bis 2030, Lot5.0, PV Different equipment including DLT, Phases SIA 32-53

II.1.2)Main CPV code

71300000 Engineering services

II.1.3)Type of contract

Services

II.1.4)Short description:

Subject of this mandate are the project phase, the submission phase and the implementation phase until commissioning, including the local management of works, for the renewal of various equipment (Energy distribution, Lighting, Installation monitoring, Communication and management system, Auxiliary installations, subdivided into different Lots) of the Gotthard motorway tunnel.

This mandate also includes coordination and support for the integration of facilities into the current higher management system (BLE).

For a detailed description of the tasks, see the documents in the tender dossier.

II.1.5)Estimated total value

II.1.6)Information about lots

This contract is divided into lots: no

II.2)Description

II.2.3)Place of performance

NUTS code: CH0 Schweiz / Switzerland / Svizzera

Main site or place of performance:

ASTRA Zofingue, Airolo / TI, Göschenen / UR, Baubüro ASTRA

II.2.4)Description of the procurement:

Subject of this mandate are the project phase, the submission phase and the implementation phase until commissioning, including the local management of works, for the renewal of various equipment (Energy distribution, Lighting, Installation monitoring, Communication and management system, Auxiliary installations, subdivided into different Lots) of the Gotthard motorway tunnel.

This mandate also includes coordination and support for the integration of facilities into the current higher management system (BLE).

For a detailed description of the tasks, see the documents in the tender dossier.

II.2.5)Award criteria

Criteria below

Cost criterion - Name: The following award criteria must be attached to the tender dossier (predefined): / Weighting: 1

Cost criterion - Name: CA1: Quality of the tenderer: Qualifications of the key persons in relation to the requirements of the project; / Weighting: 40%

Cost criterion - Name: Weighting subdivided as follows / Weighting: 1

Cost criterion - Name: CA1.1: Project manager (20%) / Weighting: 1

Cost criterion - Name: CA1.1.1: Reference (comparability of the function and the reference structure with the function and the structure of this call for tenders) 10% / Weighting: 1

Cost criterion - Name: ZCA1.1.2: CV (evaluation of training and professional experience in view of the project) 10% / Weighting: 1

Cost criterion - Name: CA1.2: Local works manager (20%) / Weighting: 1

Cost criterion - Name: CA1.2.1: Reference (comparability of the function and the reference structure with the function and the structure of this call for tenders) 10% / Weighting: 1

Cost criterion - Name: CA1.2.2: CV (evaluation of training and professional experience in view of the project) 10% / Weighting: 1

Cost criterion - Name: The project manager and the local works manager are considered to be key persons. A person can take on several functions at the same time. / Weighting: 1

Cost criterion - Name: CA2: Quality of the offer: / Weighting: 35%

Cost criterion - Name: subdivided as follows / Weighting: 1

Cost criterion - Name: CA2.1: Task analysis including risk analysis, 15% / Weighting: 1

Cost criterion - Name: CA2.2: Suggested procedure (including analysis of sustainability from a social and ecological point of view), 15% / Weighting: 1

Cost criterion - Name: CA2.3: Project organization, 5% / Weighting: 1

Cost criterion - Name: CA3: PRICE; / Weighting: 25%

Cost criterion - Name: - Price of the revised offer / Weighting: 1

II.2.6)Estimated value

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 47

This contract is subject to renewal: no

II.2.10)Information about variants

Variants will be accepted: no

II.2.11)Information about options

Options: no

II.2.13)Information about European Union funds

The procurement is related to a project and / or program financed by European Union funds: no

II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation

III.1.2)Economic and financial standing

List and brief description of selection criteria:

The following supporting documents / certificates must be attached to the (predefined) offer file, otherwise the offer cannot be taken into consideration:

SUITABILITY CRITERION 1:

TECHNICAL ABILITY

Description of a reference project of the company or main partner on the support of at least 1 completed project comparable with the defined task.

A reference project is considered comparable if it meets the following conditions:

a) Technical areas of operating and safety equipment (EES) with at least the following technical areas:

FB1 (Energy distribution), FB2 (Lighting) and FB8 (Auxiliary installations)

b) EES project author task for the project phase (32) until commissioning (53)

c) Construction or remediation of BSA installations for a tunnel with several ventilation units (at least 2) in the context of national roads or high performance roads.

d) Investment (cost of construction BSA of the reference ≥ CHF 1 Mio.)

e) The reference must not be more than 8 years old.

f) project completed

If the proof concerning the phases according to point b) or the investment according to point d) has not been satisfied with the first reference, it is possible to present a second reference. Also this second reference must satisfy conditions c) and e).

SUITABILITY CRITERION 2:

ECONOMIC AND FINANCIAL ABILITY

For the tenderer: the tenderer's turnover for the years 2019 and 2020 must correspond to more than double the value of the contract.

Evidence to be provided by the company at the request of the contracting authority after the tender has been submitted (by submitting his tender, the tenderer confirms that the corresponding obligations have been met):

A2.1. current extract from the commercial register

A2.2. current extract from the debt collection register

A2.3. current extract from the AVS / IV / APG / AC compensation fund

A2.4. current SUVA / AFC certificate

A2.5. valid insurance certificates from the tenderer regarding professional liability insurance

Current extracts from the commercial register and the debt collection register (no more than 3 months).

SUITABILITY CRITERION 3:

REFERENCES OF KEY PERSONS

A.3.1 REFERENCES OF THE PROJECT MANAGER

A3.1.1: Comparable reference

Description of a reference project from the project manager on the support of at least 1 completed project comparable with the defined task.

A reference project of the project manager is considered comparable if it meets the following conditions:

a) Technical areas EES with at least the following technical areas:

FB1 (Energy distribution), FB2 (Lighting) and FB8 (Auxiliary installations)

b) EES project author task for the project phase (32) until commissioning (53)

c) Construction or remediation of BSA installations for a tunnel with several ventilation units (at least 2) in the context of national roads or high performance roads.

d) Investment (cost of construction of the benchmark BSA ≥ CHF 1 million)

e) The reference must not be more than 10 years old.

f) project completed

If the proof concerning the phases according to point b) or the investment according to point d) has not been satisfied with the first reference, it is possible to present a second reference.

This second reference must also satisfy conditions c) and e).

A3.1.2 Training

EPF / HES Engineering degree or comparable in the field of electrotechnics / IT / mechanics.

SUITABILITY CRITERION 4:

PROOF OF THE AVAILABILITY OF KEY PERSONS

A4.1: proof of availability for two years of the under-mentioned key person: Detailed list and presentation of the workload due to other tasks and projects.

The key people are:

Project Manager

Minimum availability of the project manager: 30% for the year 2022 and 30% for the year 2023

SUITABILITY CRITERION 5:

MAXIMUM BENEFIT PROVIDED BY SUBCONTRACTORS

A5.1: Proof that the subcontractors will provide a maximum of 50% of the services.

III.1.3)Technical and professional ability

List and brief description of selection criteria:

mandate, and able to provide proof of their ability are invited to submit an offer in CHF.

A1: Technical aptitude

A2: Economic and financial aptitude

A3: References of key persons

A4: Proof of the availability of key persons

A5: Proof from the part of the subcontractors' service

Section IV: Procedure

IV.1)Description

IV.1.1)Type of procedure

Open procedure

IV.1.3)Information about a framework agreement or a dynamic purchasing system

IV.1.8)Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: yes

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 06/10/2021

Local time: 23:59

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages ​​in which tenders or requests to participate may be submitted:

German

IV.2.7)Conditions for opening of tenders

Date: 10/12/2021

Local time: 23:59

Square:

Federal Roads Office OFROU, 4800 Zofingue

Information about authorized persons and opening procedure:

The opening of tenders is not public.

Section VI: Complementary information

VI.1)Information about recurrence

This is a recurrent procurement: no

VI.3)Additional information:

Partial offers are not allowed.

Conditions for bidders from non-member states of the WTO Agreement on Government Procurement:

any.

General conditions: According to the planned contract.

Negotiations: There will be no site visit.

Fundamental requirements: The adjudicator awards this contract only to tenderers who comply with the conditions for participation set out in the tender documents and in the legislation. This concerns in particular compliance with the provisions relating to the protection of workers, working conditions, equal pay between women and men and environmental law, and behavior in accordance with competition rules and free from corruption.

Other indications: 1. The contract will be awarded subject to the maturity of the project and the availability of credits. 2. The preparation of offers is not remunerated. The corresponding files are not returned. 3. The tender documents are available in German. In the event of discrepancies between the versions, the German version prevails. 4. The Contracting Authority reserves the right to modify the deadlines mentioned in the tender documents (in particular for the award and the start of works). The tenderer has no right to compensation under any circumstances. 5. The award will be made for the phase of the project until the commissioning / conclusion of the project. With the signing of the contract, however, only the phases of the Draft detail and submission, evaluation of tenders, adjudication proposal. Subsequent phases will be released from phase to phase through written confirmation from the Employer. 6. Publication on SIMAP is binding. In the event of ambiguities or contradictions in the tender documents, the German version prevails.

Indication of remedies: In accordance with art. 56, al. 1, of the Federal Law on Public Procurement (LMP), this decision may be appealed, within 20 days of its notification, to the Federal Administrative Court, PO Box, 9023 St. Gallen. Presented in duplicate, the appeal brief must indicate the conclusions, reasons and means of proof and bear the signature of the appealing party or his representative; A copy of this decision and the documents relied on as evidence, when available, will be attached thereto. In accordance with art. 56, al. 2, LMP, the provisions of the Federal Law on Administrative Procedure (PA) relating to the suspension of time limits do not apply.

Closing deadline for submitting tenders / Comments: The deadline for submitting tenders applies as indicated in ch. 4.5 to pre-involved companies - even if they were only part of a consortium in the preparation phase of the contract. Specific deadlines and formal requirements: The tender (tender dossier) must be submitted in hard copy in duplicate and in electronic form (on USB key) in triplicate. Sending by mail A (date of the stamp affixed by a Swiss post office or an officially recognized foreign post office; franking by a company machine is not recognized as a postmark). The tenderer must in all cases be able to prove that the tender was submitted on time. Offers submitted after the deadline will not be taken into consideration. The envelope must include, in addition to the name of the project, the indication “Do not open - tender dossier” clearly visible. Personal delivery: In case of personal delivery, the offer must be left at the OFROU lodge at the latest on the date indicated above, during opening hours (hours: 8h00 - 12h00 and 1:00 p.m. - 5:00 p.m., Friday - 4:00 p.m.), against delivery of an acknowledgment of receipt (address in point 1.2). In the event of delivery to a Swiss diplomatic or consular representation abroad, foreign bidders may submit their offer there against delivery of an acknowledgment of receipt, at the latest on the date mentioned above, during opening hours. . The acknowledgment of receipt must then be sent to the adjudicator by email, at the latest on the date indicated.

Comments (Preferred time for asking questions in writing) Questions must be asked in German on the forum at www.simap.ch . The answers will be formulated in a general way on this forum by 06.09.2021. Questions received after 27.08.2021 will not be answered.

National reference publication: Simap of 04.08.2021, doc. 1210307 Desired deadline for asking questions in writing: 08/27/2021.

File available from 04.08.2021 until 06.10.2021

Terms of payment keine.

VI.4)Procedures for review

VI.4.1)Body review

Official name: Bundesverwaltungsgericht
Postal address: Postfach
Town: St. Gallen
Postal code: 9023
Country: Switzerland

VI.5)Date of dispatch of this notice:

08/04/2021





Permalink



The contract for the project planning phase, the tendering phase and the implementation phase up to commissioning, including local construction management, for department 8 (ancillary facilities) of the north and south tubes of the N02 Gotthard road tunnel was not awarded. The open invitation to tender, deadline 20/08/2021, has been interrupted. For further information please click here (German),  here (French) and here (Italian). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=512456-2021.  Ref.n. 160082/120043. 40/21.   

 

 




Permalink


Open invitation to tender, deadline 10/11/2021, for the designer (Project author -PV) and local construction management (DLL) from planning (32) to commissioning phase (53) of the operational and safety systems (BSA),  FB1 (Power), FB2 (lighting), FB7 (Cablage), FB8 (ancillaries) and FB9 systems in the Airolo tunnel, part of the 2nd Gotthard road tunnel (2TG) project on the N02 motorway. The duration of the contract is from 01/06/2022 to 31/12/2032. For tender documents and more detailed information please click here (German), here (Italian) and here (French). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=501173-2021.  Ref.n. 120043. 42/21.    

 

Switzerland-Bellinzona: Engineering services


2021/S 192-501173

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Ufficio federale delle strade USTRA Filiale Bellinzona divisione Infrastruttura stradale
Postal address: Via C. Pellandini 2a
Town: Bellinzona
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 6500
Country: Switzerland
Contact person: "NON APRIRE - OFFERTA: 2TG - (PV) und örtliche Bauleitung BSA Galleria di Airolo (GdA)"
E-mail: acquistipubblici@astra.admin.ch
Internet address(es):
Main address: https://www.simap.ch
Address of the buyer profile: www.astra.admin.ch
I.5)Main activity
Housing and community amenities

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


N2 Secondo tubo San Gottardo (2TG) - Auteur de projet (PV) et direction locale des travaux BSA Galleria di Airolo (GdA); FB1, FB2, FB7, FB8 et FB9 Galleria di Airolo; inkl. öBL Phases 32 à 53 (inclue mise en service)


II.1.2)Main CPV code
71300000 Engineering services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: CH0 Schweiz / Suisse / Svizzera
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/06/2022
End: 31/12/2032
This contract is subject to renewal: yes
Description of renewals:


On est susceptible d’avoir une prolongation lorsque la validation du crédit requise, les délais de la procédure d’approbation et/ou des circonstances imprévues l’exigent.


Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 10/11/2021
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German, Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
29/09/2021



Permalink


Lombardi SA Ingegneri Consulenti from Giubiasco (Switzerland) secured the EUR16.11 million (CHF16.80 million) contract, excluding VAT, for a tunnel engineer from Detailed design phase to commissioning for the 2nd Gotthard Road tunnel (2TG) project on the N02. For further information, please click here (German),  here (Italian) and  here (French). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=607456-2021. Ref.n. 120043. 47/21.   

 




Permalink


Open invitation to tender, deadline 19/04/2022, for the replacement of the traffic management system in the Gotthard tunnel, N02 motorway (Lot 41). For further information click here (German) and/or  here (French). The duration of the contract is 24 months. Tender applications to be sent to Ofrou, Zofingue, tel +41 58 482 75 11,  fax  +41 58 482 75 90, email beschaffung.zofingen@astra.admin.ch. Contact Ofrou, Zofingue, tel +41 58 482 75 11,  fax  +41 58 482 75 90, email zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118281-2022.  Ref.n. 190045. 10/22.     

 

Switzerland-Zofingue: Construction work

2022/S 045-118281

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Office fédéral des routes OFROU
Postal address: Brühlstrasse 3
Town: Zofingue
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 4800
Country: Switzerland
Contact person: Gestion des projets Sud
E-mail: zofingen@astra.admin.ch
Internet address(es):
Main address: https://www.simap.ch
Address of the buyer profile: www.astra.admin.ch
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

N02, 190045, ERBSAGST30, Erhalt BSA GST bis 2030 / Lot 41 - Remplacement système de gestion de trafic pour le tunnel du Gotthard

II.1.2)Main CPV code
45000000 Construction work
II.1.3)Type of contract
Works
II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: CH0 Schweiz / Suisse / Svizzera
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 24
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 19/04/2022
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
28/02/2022



Permalink


Open invitation to tender, deadline 06/05/2022, for the design phase, the tender phase up to commissioning, including local construction management for technical area 5-6 (surveillance, communication and management systems) of the North and South tubes of the Gotthard motorway tunnel and of the Airolo tunnel on the N2. For tender documents please click here (German), here (French) and here (Italian). Duration of the contract will be 125 months after signing the contract. Contact USTRA, Zofinguen, tel +41 627457511, fax +41 627457590, email beschaffung.zofingen@astra.admin.ch.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=125888-2022.  Ref.n. 120043/160082. 12/22. 

Switzerland-Zofingue: Engineering services

2022/S 048-125888

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Office fédéral des routes OFROU Succursale de Zofingue
Postal address: Brühlstrasse 3
Town: Zofingue
NUTS code: CH0 Schweiz / Suisse / Svizzera
Postal code: 4800
Country: Switzerland
Contact person: Gestion des projets Sud
E-mail: zofingen@astra.admin.ch
Internet address(es):
Main address: https://www.simap.ch
Address of the buyer profile: www.astra.admin.ch
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

N02,120043/160082, 2TG/EP 1TG, Secondo tubo Gottardo/EP GST bestehende Röhre 1TG / PV und öBL BSA FB 5-6 Système de surveillance, de communication et système de gestion

II.1.2)Main CPV code
71300000 Engineering services
II.1.3)Type of contract
Services
II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: CH0 Schweiz / Suisse / Svizzera
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 125
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 06/05/2022
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
04/03/2022



Permalink


SISAG AG from Schattdorf have secured the EUR 1.74 million (CHF1.80 million) contract, excluding VAT, for the replacement of the traffic management system in the Gotthard tunnel, N02 motorway (Lot 41). For further information click here (German) and/or  here (French). Contact Ofrou, Zofingue, tel +41 58 482 75 11,  fax  +41 58 482 75 90, email beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303674-2022.  Ref.n. 190045. 23/22.

 




Permalink


GESTE Engineering SA from Bellinzona secured the EUR2.80 million (CHF2,71 million) contract, excluding VAT, for the designer (Project author -PV) and local construction management (DLL) from planning (32) to commissioning phase (53) of the operational and safety systems (BSA),  FB1 (Power), FB2 (lighting), FB7 (Cablage), FB8 (ancillaries) and FB9 systems in the Airolo tunnel, part of the 2nd Gotthard road tunnel (2TG) project on the N02 motorway. For further information please click here (German), here (Italian) and here (French). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=446445-2022.  Ref.n. 120043.  33/22.     

 




Permalink


The Secondo tubo Joint Venture, composed of  Implenia from Glattpark  (60%)  and Frutiger from Thun (40%), have secured the EUR482.08 million (CHF467 million) contract, including VAT, for the construction of  the northern section of the second tube of the Gotthard road tunnel (Lot 241). The construction is scheduled to take place from 2022 to 2029.  For further information please click here (French), here (Italian) and here (German), Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.ch.  Visit https://implenia.com/en/ and http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=455332-2022. 33/22. 

 

 





Permalink


Consortium Marti 2TG Lot 341 composed of Marti Tunnel AG from Moosseedorf,  Mancini & Marti SA from Bellinzona and Ennio Ferrari Impresa Generale SA from Lodrino have secured the EUR514.17 million (CHF498.87 million) contract, including VAT,  for the construction of  the southern section of the second tube of the Gotthard road tunnel (2TG) on the N02 (Lot 341). For further information please click here (Italian),  here (French) and here (German). Contact Ofrou, Bellinzona, tel +41 58 469 68 11, fax +41 58 469 68 90, email acquistipubblici@astra.admin.chVisit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=455330-2022.    Ref.n. 120043. 33/22. 

 




Permalink


Open invitation to tender, deadline 05/10/2023, for the replacement of lighting in emergency exits, of an OLE control unit, LED modules and lighting in the Airolo maintenance center, for the Gotthard motorway tunnel on the N2. For tender documents please click here (German), here (French) and here (Italian), where tenders must be sent. Duration of the contract will be 35 month. Contact USTRA, Zofingen, tel +41 627457511, fax +41 627457590, email beschaffung.zofingen@astra.admin.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=524224-2023.  Ref.n. MP-190045. 37/23. 




Permalink


Open invitation to tender, deadline 09/01/2025, for the manufacture, supply and installation of HV cables in the technical gallery (WELK)of the Gotthard motorway tunnel on the N2. For tender documents please click here, where tenders must be sent. Duration of the contract from 01/04/2025 to 31/12/2034. Contact Swissgrid AG - Asset & Maintenance, Aarau, tel +41585802111, email ausschreibungen-MechanicalEquipment@swissgrid.ch. Visit https://ted.europa.eu/en/notice/-/detail/701481-2024 and https://ted.europa.eu/en/notice/-/detail/497484-2024.  47/24.



Permalink

Switzerland, Ticino - ch/49

Railway

A 6.7 km cross-border railway is under planning between Stabio, in the Tessin Canton and Arcisate in Lombardy. The link will connect directly Lugano to the Milan Malpensa Airport in 50 minutes. On the Italian side, a 985 m tunnel is planned prior to the Gaggiolo station. A bi-national coordination committee has been set up between the Tessin Canton, Lombardy, the Swiss federal railways and Rete Ferroviaria Italiana. Work may start end of 2005. Visit www.rfi.it and www.rail.ch 15/02.As part of the preliminary studies on the alignment of the new Gotthard railway link through the Alps, south of Lugano, the feasibility and opportunity analysis of the four alternatives has been commissioned to the consortium RBM (Rapp Trans, Basler & Hofmann and Ingegneria Maggia), that gathers ten companies altogether. The study, awarded by the federal office of transport (OFT) on behalf of the federal department of the environment, transport, energy and communications (DETEC), will analyse the feasibility and opportunity of the four alternatives along the Lugano-Chiasso corridor, three of which plan to cross Lake Lugano under water. A steering group, comprising officials of the OFT, the canton of Ticino and the Swiss railways, will be in charge of following up the choice of the path until the Italian border. The results will be available in end 2008 or early 2009. Visit www.rapp.ch/trans.html, www.bhz.ch and www.im-maggia.chItaly is studying also three options (Cadenazzo-Laveno, Lugano-Laveno, Lugano-Luino) for the new section along the Cadenazzo-Luino-Laveno corridor (the so-called “Gronda Ovest”) and has already released the first results. The Italian experts are currently examining the opportunity of the alternatives. These studies will also be carried out in coordination with Swirterland. Read E-News Weekly 22/2006. 09/08.



Permalink

Switzerland, Collombey - ch/48

Highway

  Single tube, 807 m-long, 11 m-wide, Collombey tunnel under drill/blast excavation on 65 sq m full face using 4.5 m-deep rounds by Züblin-Schlittler-Murer-Etra SA. Tunnel climbs at a 7-12% grade with a side slope of 5-7% describing a curve. 30 m to breakthrough. Full-length pilot tunnel driven by Wirth 3.5 m-diameter TBM, together with 400 m-long escape tunnel running parallel with upper portion of main tunnel. Opening to traffic, including 500 m cut and cover section and bridge scheduled 2003. Tunnel by-passes Monthey to give easy access to mountain resort of Morgins and Val d'Illiez. Visit www.wirth-europe.com 48/01.



Permalink

Switzerland, Illas - ch/47

Highway

Open invitation to tender, deadline 11th October, 2001, for construction of two road tunnels. Contact Brig-Glis Roads Section, fax +41 279 243943. 41/01.



Permalink

Switzerland, Moutier - ch/46

Highway

Award of $50 million TBM construction contract for twin 1.2 km-long, 10.2 m-diameter tubes to consortium led by Marti AG for completion 2007. Visit www.emsch-berger.ch 23/01.



Permalink

Switzerland, Aarwangen - ch/45

Sewer

Open invitation to tender, deadline 8th June, 2001 for construction of 2.1 km-long Muniberg sewer tunnel. Contact Rothpletz, Lienhard, 5001 Aarau. Published in SCJ 26th April, 2001. 21/01.



Permalink

Switzerland, Gamsen - ch/44

Motorway

Award of 950 m-long tunnel, including 250 m cut and cover, to Wadeg consortium of local contractors. 07/01.



Permalink

Switzerland, Susten - ch/43

Motorway

Approval for 11.5 km-long section of A9 Sion-Brig motorway between Leuk and Gampel with 2.1 km tunnel at Susten (250 m cut and cover); 1.2 km cut and cover at Turtmann; and 510 m bored tunnel at Riedberg. Bids estimated $350 million to be called by end-2001 for 2002 construction start. Connect through www.susten.ch 06/01.



Permalink

Open invitation to tender, deadline 16.10.2014, for the conclusion of the Riedberg tunnel (451.5 m, 587.15 m) excavation on A9 motorway. At the moment the two tubes are partially built: north tube 133m, south tube 192 m. Duration of  contract from 02.03.2015 to 15.12.2019. Site visit will be held on 24.07.2014 at 10 a.m. Gampel-Steg station. Contact Office de construction des routes nationales, attn Elmar Meichtry, Glis. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=250441-2014 and www.a9-vs.ch. Ref. n. L05721. 30/14.



Permalink

Open invitation to tender, deadline 19.01.2015, for local general management for the conclusion of the Riedberg tunnel (451.5 m, 587.15 m) excavation on A9 motorway. Duration of contract from 01.02.2015 to 30.07.2020. Contact Office de construction des routes nationales, Glis, website www.a9-vs.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=409906-2014. Ref. n. M05522. 49/14.



Permalink

Open invitation to tender, deadline 02.03.2015, for the conclusion of the Riedberg tunnel (451.5 m, 587.15 m) excavation on A9 motorway. Duration of contract from 01.04.2015 to 31.12.2021. Contact Ofrou, Glis. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022067-2015, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022066-2015 and www.a9-vs.ch. Ref. n. M05524. 04/15.



Permalink


Open invitation to tender, deadline 30/10/2020, for the detailed design, construction and commissioning of the Susten tunnel (1210 m rock tunnel and 870 m cut & cover) on the A9 motorway between Sierre East and Leuk/Susten East. The contract duration is from 01/06/2021 to 31/12/2035. For tender information please click here (French), here  (German) and here. Contact Ofrou, Glis, tel +41 27 606 97 00, email ansb-beschaffung@admin.vs.ch. Ref. n. M10038. 35/20.





Permalink


Rothpletz, Lienhard + Cie AG from Olten secured the EUR 614.37 million (CHF674.29 million) contract, excluding VAT, for the detailed design, construction and commissioning of the Susten tunnel (1210 m rock tunnel and 870 m cut & cover) on the A9 motorway between Sierre East and Leuk/Susten East. For tender information please click here  (German) and here. Contact ANSB, Glis, email ansb-beschaffung@admin.vs.ch. Ref. n. M10038. 17/21. 

 




Permalink

Switzerland, Sissach - ch/42

Highway

Construction of 2.29 km-long x 10.2 m-diameter Chienberg underway in swelling Triassic formation of marls and anhydrite by contracting jv of Batigroup, Frutiger and Itin for completion end-2003 at value $100 million. 1.4 km to be bored and 850 m cut-and-cover. Visit www.batigroup.ch December 2000.



Permalink