Poland,
Zabrze
- pl/22
Access Subway
Closing Date:
31.01.2012 (Tender Closed)
Open invitation to tender, deadline 31.01.2012, for tunnelling and equipping access subway to European Centre for Technical Culture and Tourism Industry in Zabrze, Phase 1. Further information, specs and docs from Krzysztof Cyberski in Zabrze, tel +48 322714-077, fax –859, e-mail kcyberski@kopalniaguido.pl to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399461-2011. 52/11.
Additional information for the open invitation to tender, deadline 31.01.2012, for tunnelling and equipping access subway to European Centre for Technical Culture and Tourism Industry in Zabrze, Phase 1. Duration contract from 10 to 12 months after award. Further information, specs and docs from Krzysztof Cyberski in Zabrze, tel +48 322714-077, fax -859, e-mail kcyberski@kopalniaguido.pl to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=006255-2012. 03/12.
Award of contract to Karbon of Katowice, value EUR730,000 including 23 percent VAT, for tunnelling and equipping access subway to European Centre for Technical Culture and Tourism Industry in Zabrze, Phase 1. More from Krzysztof Cyberski in Zabrze, tel +48 322714-077, fax –859, e-mail kcyberski@kopalniaguido.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=024444-2012. 04/12.
Award of contract to CPRG of Chorzow, Poland value EUR752,500 excluding VAT for technical equipment installation in access subway to European Centre for Technical Culture and Tourism Industry in Zabrze, Phase 1. Further information from Krzysztof Cyberski in Zabrze, tel +48 322714-077, fax –859, e-mail kcyberski@kopalniaguido.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106961-2012. NUTS-code PL22. 14/12.
Award of contract 1 lot 1 to Karbon of Myslowice, Poland value EUR1.95 million including 23 percent VAT and contract 2 lot 2 to WBE of Czestochowa, Poland value EUR581,000 including 23 percent VAT, for construction and technical equipment installation in access subway to European Centre for Technical Culture and Tourism Industry in Zabrze, Phase 1. Further information from Arkadiusz Maraszek in Zabrze, tel +48 326303091, fax 322771125, e-mail biuro@kopalniaguido.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=374399-2012. NUTS-code PL229. 48/12.
Poland,
Wronki
- pl/20
Canal
Closing Date:
15.02.2011 (Tender Closed)
Open invitation to tender, deadline 15.02.2011, for construction of canal tunnel and associated works. Further information, specs and docs from Maciej Pospieszny at PK in Wronki, tel +48 67254-5655, fax -0645, e-mail m.pospieszny@pk-wronki.pl to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=026445-2011. 04/11.
Award of contract, value EUR4.45 million excluding VAT, to Wuprinz SA of Poznan for construction of canal tunnel and associated works. Contact +48 616565770, fax +48 618425686, e-mail tp@wuprinz.pl. Further project information from Maciej Pospieszny at PK in Wronki, tel +48 67254-5655, fax -0645, e-mail m.pospieszny@pk-wronki.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=089157-2011. 12/11.
Award of contract, value EUR1.92 million including VAT at 23 percent, to ATA Technik of Budzyn, Poland for construction of sewage pipelines and associated works. Further project information from Maciej Pospieszny at PK in Wronki, tel +48 67254-5655, fax –0645, e-mail m.pospieszny@pk-wronki.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=289142-2013. 35/13.
Open invitation to tender, deadline 16.06.2014, for construction of sewage pipelines and associated works. Further project information, specs and docs from Maciej Pospieszny at PK in Wronki, tel +48 67254-5655, fax –0645, e-mail m.pospieszny@pk-wronki.pl to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=185547-2014. 23/14.
Postponed from 16.06.2014 to 23.06.2014 the deadline of the open invitation to tender for construction of sewage pipelines and associated works. Further project information, specs and docs from Maciej Pospieszny at PK in Wronki, tel +48 67254-5655, fax –5650, e-mail m.pospieszny@pk-wronki.pl to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=201586-2014. 25/14.
Poland,
Lodz-Masovia
- pl/18
High Speed Railway
Closing Date:
05.01.2010 (Tender Closed)
Invitation to tender using restricted procedure, deadline 05.01.2010, for construction of Stage 2, Lot B2 of modernization of Warsaw-Lodz railway line, comprising 16.5 m-deep Lodz-Fabryczna multimodal station with four 400 m-long platforms and eight tracks, and 1.6 km of underground access tunnels and rebuilding of infrastructure around the installation into an integrated hub. All excavated material to be removed through existing Lodz-Widzew station.Further information, specs and docs from Justyna Zareba at PKP PLK in Warsaw, tel +48 22473-3597, fax -2404, e-mail j.zareba@plk-sa.pl to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339604-2009. 51/09.
Deadline postponed from 05.01.2010 to 19.01.2010 for invitation to tender using restricted procedure for construction of Stage 2, Lot B2 of modernization of Warsaw-Lodz railway line, comprising 16.5 m-deep Lodz-Fabryczna multimodal station with four 400 m-long platforms and eight tracks, and 1.6 km of underground access tunnels and rebuilding of infrastructure around the installation into an integrated hub. All excavated material to be removed through existing Lodz-Widzew station. Further information, specs and docs from Justyna Zareba at PKP PLK in Warsaw, tel +48 22473-3597, fax -2404, e-mail j.zareba@plk-sa.pl to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=354901-2009. 53/09.
Deadline postponed again from 19.01.2010 to 05.02.2010 for invitation to tender using restricted procedure for construction of Stage 2, Lot B2 of modernization of Warsaw-Lodz railway line, comprising 16.5 m-deep Lodz-Fabryczna multimodal station with four 400 m-long platforms and eight tracks, and 1.6 km of underground access tunnels and rebuilding of infrastructure around the installation into an integrated hub. All excavated material to be removed through existing Lodz-Widzew station. Further information, specs and docs from Justyna Zareba at PKP PLK in Warsaw, tel +48 22473-3597, fax -2404, e-mail j.zareba@plk-sa.pl to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=009731-2010. 04/10.
Deadline postponed again from 05.02.2010 to 08.03.2010 for invitation to tender using restricted procedure for construction of Stage 2, Lot B2 of modernization of Warsaw-Lodz railway line, comprising 16.5 m-deep Lodz-Fabryczna multimodal station with four 400 m-long platforms and eight tracks, and 1.6 km of underground access tunnels and rebuilding of infrastructure around the installation into an integrated hub. Further information, specs and docs from Justyna Zareba at PKP PLK in Warsaw, tel +48 22473-3597, fax -2404, e-mail j.zareba@plk-sa.pl to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=036097-2010. 06/10.
Postponed from 05.01.2010 to 01.04.2010, the deadline for invitation to tender using restricted procedure for construction of Stage 2, Lot B2 of modernization of Warsaw-Lodz railway line, comprising 16.5 m-deep Lodz-Fabryczna multimodal station with four 400 m-long platforms and eight tracks, and 1.6 km of underground access tunnels, and rebuilding of infrastructure around the installation into an integrated hub. All excavated material to be removed through existing Lodz-Widzew station. Contract duration from 36 to 42 months. Further information, specs and docs from Justyna Zareba at PKP PLK in Warsaw, tel +48 22473-3597, fax -2404, e-mail j.zareba@plk-sa.pl, to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=066938-2010. 11/10.
Contract No 1, value EUR338 million excluding VAT, awarded to Torpol Spolka of Poznan for construction of Stage 2, Lot B2 of modernization of Warsaw-Lodz railway line, comprising 16.5 m-deep Lodz-Fabryczna multimodal station. More from torpol@torpol.pl, tel +48 6187827-00, fax -90. Further information from Justyna Zareba at PKP PLK in Warsaw, tel +48 22473-3597, fax -2404, e-mail j.zareba@plk-sa.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=280621-2011. 36/11.
Open invitation to tender, deadline 22.02.2017, for the reconstruction of a tunnel connecting three railway stations in Łodz – Fabryczna, Kaliska and Żabieniec.
Tunnels will be built by mechanised shield (two-track tunnel) and open-pit and mining (tunnels monorail). Contact PKP Polskie Linie Kolejowe SA, att.n Mariusz Madej, Varsavia, fax +48 224732399, email mariusz.madej@plk-sa.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=417815-2016, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=434005-2016, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=458962-2016 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=030121-2017. Ref.n. 6060/ICZ 6/26012/09895/16/P. 04/17.
Additional information on the open invitation to tender, deadline 22.02.2017, for the reconstruction of a tunnel connecting three railway stations in Łodz – Fabryczna, Kaliska and Żabieniec. Tunnels will be built by mechanised shield (two-track tunnel) and open-pit and mining (tunnels monorail). Contact PKP Polskie Linie Kolejowe SA, att.n Mariusz Madej, Varsavia, fax +48 224732399, email mariusz.madej@plk-sa.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=042390-2017. Ref.n. 6060/ICZ 6/26012/09895/16/P. 05/17.
Energopol-Szczecin SA from Szczecin and Przedsi & Budowy
from Minsk Mazowiecki secured the EUR309.72 million contract, excluding VAT,
for the reconstruction of a tunnel connecting three railway stations in – Fabryczna & Kaliska.
The tunnels will be built by mechanised shield (two-track
tunnel) and open-pit and mining (monorail tunnels). Contact PKP Polskie Linie
Kolejowe SA, att.n Mariusz Madej, Varsavia, fax
+48 224732399, email mariusz.madej@plk-sa.pl.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=010060-2018.
Ref.n. 6060/ICZ 6/26012/09895/16/P. 02/18.
Open invitation to tender, deadline 03/02/2021, for the preparation of pre-design and design documentation with technical support for project n. 00100011 for construction of a long-distance tunnel in Łodz along the railway line n. 85. Duration of the contract is until 30/10/2028. Contact Centralny Port Komunikacyjny sp. z o.o., attn Joanna Olędzka-Kowalska, Warsaw, tel +48 539188692, email zamowienia@cpk.pl.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=643237-2020. Ref.n. 156/20/KRI/11/PZP/WD/90. 01/21.
The JV Biuro Projektow Metroprojekt Sp. z o.o. from Warsaw/Sud Architekt Polska Sp. z o.o. from Warsaw secured the EUR 12.70 million (PLN59.85 million) contract, excluding VAT, for the preparation of pre-design and design documentation with technical support for project n. 00100011 for the construction of a long-distance tunnel in Łodz along the railway line n. 85. Contact Centralny Port Komunikacyjny sp. z o.o., attn Joanna Olędzka-Kowalska, Warsaw, tel +48 539188692, email zamowienia@cpk.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=601661-2021. Ref.n. 156/20/KRI/11/PZP/WD/90. 47/21.
Budimex S.A. from Warsaw secured the contract for the securing and maintaining of the Retkinia chamber construction Site as part of the construction of a long-distance tunnel in Łodz along railway line n. 85 together with its connection to railway line n. 14. The Retkinia chamber will be used as the TBM launch shaft. Contact Centralny Port Komunikacyjny sp. z o.o., Warsaw, tel +48 539 188 116, email zamowienia@cpk.pl. Visit https://ted.europa.eu/en/notice/-/detail/285112-2025. Ref.n. FZA.2510.1.2025/RP/4. 18/25.
The company PORR secured the EUR400 million (PLN 1.7 billion), excluding VAT, contract for the construction of a 4.6 km long, 14-m wide High-Speed Rail (HSR) tunnel, running from the Retkinia launch shaft to the Fabryczna exit shaft in Lodz. The long-distance tunnel in Łodz, a key part of railway line n. 85 - the so-called Y line, will allow high-speed trains to pass under the city centre at depths of 25-35 m, ensuring fast connections between Warsaw, Sieradz, Wrocław and Poznan. The tunnel will be the longest and widest rail tunnel in Poland to be constructed in a single section using a TBM (3,200 t with a 14m-diameter cutterhead). Contact Centralny Port Komunikacyjny sp. z o.o., attn Biuro Zakupow, Warsaw, tel +48 539 188 404, email zamowienia@cpk.pl.. Visit https://www.cpk.pl/ and https://porr-group.com/. Ref.n. FZA.2510.12.2024/IG/24. 26/25.
Postponed to 01/07/2025 the deadline of the open invitation to tender for the development of design documentation together with technical support for the project entitled: Construction of a long-distance tunnel in Łodz, along the railway line n. 85, including its connection with the railway line n. 14 - section of the Łodz Retkinia branch line. Click here https://portal.smartpzp.pl/cpk/public/postepowanie?postepowanie=80219121 for bid documents and where tenders must be sent. Duration of the contract is 96 months. Contact Centralny Port Komunikacyjny sp. z o.o., attn Biuro Zakupow, Warsaw, tel +48 539188116, email zamowienia@cpk.pl. Visit https://ted.europa.eu/it/notice/-/detail/408948-2025, https://ted.europa.eu/it/notice/-/detail/401625-2025, https://ted.europa.eu/it/notice/-/detail/389237-2025 and https://ted.europa.eu/it/notice/-/detail/365623-2025. Ref.n. FZA.2510.4.2025/RP/10. 26/25.
Open invitation to tender, deadline 10/06/2025, for the development of design documentation together with technical support for the project entitled: Construction of a long-distance tunnel in Łodz, along the railway line n. 85, including its connection with the railway line n. 14 - section of the Łodz Retkinia branch line. Click here https://portal.smartpzp.pl/cpk/public/postepowanie?postepowanie=80219121 for bid documents and where tenders must be sent. Duration of the contract is 96 months. Contact Centralny Port Komunikacyjny sp. z o.o., attn Biuro Zakupow, Warsaw, tel +48 539188116, email zamowienia@cpk.pl. Visit https://ted.europa.eu/it/notice/-/detail/338596-2025 and https://ted.europa.eu/it/notice/-/detail/292204-2025. Ref.n. FZA.2510.4.2025/RP/10. 22/25.
Poland,
Radom
- pl/17
Road
Open invitation to tender, deadline 25.05.2009, for construction work and installation of lighting and signalling systems in Radom road tunnel and approach roads, for completion 30.09.2010. More from Franciszek Bogatek at MZDIK in Radom, tel +48 4836546-52, fax -51, e-mail mzdik@mzdik.pl.http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104247-2009 16/09.
Award of contract to Cezet Bis/Jawal consortium, value EUR8.82 million excluding VAT, for construction work and installation of lighting and signalling systems in Radom road tunnel. More from Cezet in Starachowice, tel +48 4127-40184, fax -55359, e-mail cezet1@go2.pl. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=227012-2009 34/09.
Open invitation to tender, deadline 12.08.2011, for construction of 13.5 km of Radom southern ring road in five lots including one tunnel. Further information, specs and docs from Franciszek Bogatek at MZDIK in Radom, tel +48 36546-52, fax -51, e-mail mzdik@mzdik.pl to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=207380-2011. 27/11.
Award of contract, value EUR36.85 million including VAT at 23 percent, to consortium F/T/M-L/B-S of Kielce, tel +48 413619-960, fax –817, for construction of Radom southern ring road including one tunnel. Further information, specs and docs from Franciszek Bogatek at MZDIK in Radom, tel +48 36546-52, fax -51, e-mail mzdik@mzdik.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=047454-2012. 07/12.
Poland,
Warsaw
- pl/15
Ring Road
DHV is designing a 19.5 km stretch of the future southern ring road in Warsaw. The section includes a 2.6 km tunnel below the Ursynow residential district. DHV is responsible for designing the route, obtaining building permissions and preparing tendering documents. The contract value is EUR9.5 million and DHV's assignment will be completed in December 2006. Visit www.dhv.nl 27/05.
Restricted invitation to tender, deadline 28.02.2014, for design and construction of the S2 Puławska-Lubelska section, South ring road of Warsaw. The contract is composed of three lots. Lot A (4.6 km) from Pulawska to Przyczołkowa (not included), with a 2.6 km tunnel; lot B (6.5 km) from Przyczołkowa to Wał Miedzeszynski (included) and lot C (7.5km) from Wał Miedzeszynski to Lubelska. Duration of contract 41 months from award. Contact GDDKiA (Generalna Dyrekcja Drog Krajowych i Autostrad), att.n Sebastian Chada, Anna Cybulska, Agata Zielinska, Beata Misiewic in Warsaw, tel +48 222092362, fax +48 222092474, e-mail schada@gddkia.gov.pl, acybulska@gddkia.gov.pl, agzielinska@gddkia.gov.pl, bmisiewicz@gddkia.gov.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=429953-2013. 52/13.
23 consortium/companies sent their tender for design and construction of the S2 Puławska-Lubelska section, South ring road of Warsaw: 16 for Lot A (4.6 km) from Pulawska to Przyczołkowa (not included), with a 2.6 km tunnel below the Ursynow residential district; 15 for lot B (6.5 km) from Przyczołkowa to Wał Miedzeszynski (included) and 16 for lot C (7.5km) from Wał Miedzeszynski to Lubelska. Click pl/15 and visit http://www.gddkia.gov.pl/pl/a/14306/23-chetnych-do-budowy-Poludniowej-Obwodnicy-Warszawy. 10/14.
Egis Polska Inzynieria from Warsaw secured the PLN79.22 million contract, including VAT, for the supervision of the construction of the S2 Pulawska-Lubelska section, South ring road of Warsaw, composed of 3 lots.
Contact GDDKiA (Generalna Dyrekcja Drog Krajowych i Autostrad), att.n Sebastian Chada, Warsaw, tel +48 222092362, fax +48 222092474, email schada@gddkia.gov.pl . for tender information please click here and here. 51/15.
Gddkia awarded the contracts for the design and construction of the Puławska-Lubelska section of the S2 motorway, Warsaw's South Ring Road.
Astaldi di Roma secured the contract for approximately 1,222 million Polish Sloti for 4.6 km-long Lot A from Pulawska to Przyczołkowa (excluding), including approximately 2.6 km-long tunnel.
Consortium Gulermak Agir Sanayi Inssat ve Taahhut and Przedsiębiorstwo Budowy Drog i Mostow from Ankara secured the contract for approximately 757.6 million Polish Sloti for 6.5 km-long Lot B from Przyczołkowa to Wał Miedzeszynski (included).
Warbud SA of Warsaw was awarded the contract for approximately 561,7 million Polish Sloti Poles for lot C of 7,5 km from Wał Miedzeszyński to Lubelska.
Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), att.ne Sebastian Chada, Anna Cybulska, Agata Zielińska, Beata Misiewic, Warsaw, tel +48 222092362, fax +48 222092474, email schada@gddkia.gov.pl, acybulska@gddkia.gov.pl, agzielinska@gddkia.gov.pl, bmisiewicz@gddkia.gov.pl. For tender information please click here and here. OJ S 243 and . 51/15.
Open invitation to tender, deadline 05/08/2025, for the Technical‑Economic‑Environmental Study, including the materials required for obtaining the Environmental Conditions Decision, for the project ‘Construction of the S‑17 expressway, Drewnica – Zakręt section (14 km) in Warsaw. The objective is to select the most advantageous route option, taking into account tunnel solutions. Click here for bid documents and where tenders must be sent. Duration of contract 48 months. Contact GDDKiA (Generalna Dyrekcja Dróg Krajowych i Autostrad), Varsavia, tel +48 222092361, email azeynalov@gddkia.gov.pl. Visit https://ted.europa.eu/en/notice/-/detail/421068-2025 and https://ted.europa.eu/en/notice/-/detail/408727-2025. Ref.n OWA.D-3.2411.8.2025. 27/25.