Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Modriach - at/25

Highway

Austrian government announcement concerning proposed 2.4 km-long, two-lane bidirectional road tunnel to be constructed in Autumn, 2000 using drill/blast and sprayed concrete with rockbolt support. More details on likely timing of invitation to tender from Heinz Cermat in Graz, e-mail hcermat@stmk.gov.at or fax +43 31 6877 2131. January 2000.Prein Consult of Leoben have carried out preliminary investigation of the proposed 2 km-long x 90 sq m single drill/blast tube Herzogbergtunnel on the highway between Graz and Klagenfurt. Invitations to tender expected October, 2000 for a start of construction in Spring, 2001. July 2000.



Permalink

Austria, Lower Austria & Styria - at/24

Semmering - Railway

Proposed 22.2 km Semmering tunnel cleared by Austrian courts. Design proceeding. Sept 1999.Negotiated procedure, deadline 8th August, 2005 for design of the Semmering base tunnel on the Gloggnitz-Langenwang section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=139491-2005, OJ S 140, or contact OEBB-Infrastruktur Bau, Vienna, fax +43 19300045991. E-mail marko.koren@hl-ag.com. Subscribe to E-News Weekly 14/2005 & 12/2005. 31-32/05.Open call for tenders, deadline 6th February, 2006 for test drilling for the Semmering base tunnel between Gloggnitz (Lower Austria) and Muerzzuschlag/Langenwang (Styria) on the future Vienna-Graz high speed link. Read E-News Weekly 14/2005 & 12/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=240680-2005, OJ S 244, or contact OEBB Infrastruktur Bau, Vienna, fax +43 19300045829. E-mail oliver.wagner@bau.oebb.at 02/06.iC consulenten and IGT Geotechnik und Tunnelbau received a EUR3.1 million contract for geological and hydrogeological studies for the Semmering base tunnel on the Gloggnitz-Langenwang section. Read E-News Weekly 14/2005 & 12/2005. Visit www.ic-vienna.at and www.igt.co.at 22/06.ILF pocketed a EUR3.4 million contract for the environment impact study of the Semmering base tunnel on the Gloggnitz-Langenwang section. Read E-News Weekly 14/2005 & 12/2005. Visit www.ilf.com 22/06.Open call for tenders, deadline 18th February, 2008 for ground investigation campaign for the Semmering base tunnel, section Neu Gloggnitz-Raum Mürzzuschlag/Langenwang. Read E-News Weekly 9/2007, 4/2005, 12/2005 & 19/2004. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=298835-2007, OJ S 245, or contact í–BB, Vienna, tel. +43 3167729311080. 02/08.



Permalink

Invitation to tender using negotiated procedure, deadline 20.12.2011, for construction supervision services during preliminary works at the Gloggnitz portal for the Semmering base tunnel. Contract duration 02.04.2012 to 30.4.2015. Contact Anne Schuster, Vienna, tel. + 43 193000-45831, fax -45829, e-mail Anne.Schuster@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=381396-2011. Bid Code PGG1. 50/11.



Permalink

JV IC - IGT - Vigl p.A. iC consulenten ZT GesmbH (Vienna) secured the EUR25.57 million contract, VAT not included,  for engineering design services for the Semmering base tunnel, section Gloggnitz-Murzzuschlag. Contact OBB, Vienna, tel +43 31693000-6142, e-mail oliverkai.wagner@oebb.at. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=382117-2011. 50/11.



Permalink

Negotiated invitation to tender, deadline 07.03.2013, for the site supervision in Froeschnitzgraben (lot SBT 2.1) during construction of the new 27.3 km-long, twin-bore Semmering Base Tunnel. Contact OEBB, Eng. Anne Schuster, Vienna, tel +43 193000458-31, fax -29, e-mail anne.schuster@oebb.at. Further information from https://www.ava-online.at, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019671-2013. 04/13. 



Permalink

Open invitation to tender, deadline 11.07.2013, for construction of the Froeschnitzgraben tunnel (km96 +900 - km83 +975, track 1, lot SBT 2.1) SOS stop and ventilation system included on the new Gloggnitz-Muerzzuschlag line. Time limit for receipt of requests for documents or for accessing documents: 13.06.2013. Duration of contract 07.01.2014 to 12.08.2024. Contact OEBB, Eng. Gernot Nipitsch, Vienna, tel +43 316930006131, fax +43 316930006139, e-mail gernot.nipitsch@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=131641-2013. Bid Code: 2013 / @ AVA ID-Nr: 16557. 17/13.



Permalink

Negotiated invitation to tender, deadline 31.07.2013, for geotechnical measurements for the structural work of the Semmering base tunnel, and tunnels main control measurements over the entire Semmering base tunnel. Duration of contract from 01.01.2014 to 30.04.2022. Register interest at https://www.ava-online.at. Contact OEBB-Infrastruktur attn: Mr Peter Csoengei, Wien, tel +43 19300045811, e-mail peter.csoengei@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=225394-2013. 28/13.



Permalink

The JV Swietelsky Tunnelbau GmbH & Co KG/Implenia AG of Salzburg secured the contract for construction of the Froeschnitzgraben tunnel (km96 +900 - km83 +975, track 1, lot SBT 2.1) SOS stop and ventilation system included on the new Gloggnitz-Muerzzuschlag line. Contact OEBB, Eng. Gernot Nipitsch, Vienna, tel +43 6642869670, e-mail gernot.nipitsch@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=399983-2013. Bid Code: 2013 / @ AVA ID-Nr: 16557. 49/13.



Permalink

The JV Geodata ZT GmbH – DI Maletz Vermessungskanzlei of Leoben, Austria secured the contract for geotechnical measurements for the structural work of the Semmering base tunnel, and tunnels main control measurements over the entire Semmering base tunnel. Contact OEBB-Infrastruktur attn: Mr Peter Csoengei, Vienna, tel +43 19300045811, e-mail peter.csoengei@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=094033-2014. 12/14.



Permalink

JV MAPAG Materialpruefung GmbH/ Buero fuer Geologie und Hydrogeologie Ziviltechniker GmbH/Sachverstaendigenbuero Boden + Waser GmbH of Gallneukirchen (Austria) secured the contract for classification of spoil and rock from new Semmering base tunnel excavation. Contact Oebb, attn Jutta Krainz, Vienna, tel +43 316930006131, fax +43 316930006139, e-mail jutta.krainz@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148617-2014. Ref. n. 2013/@AVA ID-Nr. 19733. 18/14.



Permalink

JV Nievelt Labor Pruefstelle/MAPAG Materialpruefung/Nievelt Labor of Stockerau secured the contract for the identity tests for concrete and building earthworks for the entire Semmering base tunnel. Contact OEBB, Eng. Roland Leitner, Vienna, tel +43 6648243407, fax +43 316930006139, e-mail roland.leitner@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154422-2014. Ref. n. 2013 / @ AVA ID-Nr: 23438. 19/14.



Permalink

Invitation to tender using negotiated procedure, deadline 19.08.2014, for construction supervision services during lot SBT1.1 works at the Gloggnitz tunnel, part of the Semmering base tunnel. Contract duration 02.02.2015 to 31.12.2024. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Tenders or requests to participate must be sent to  https://www.ava-online.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=241613-2014. Ref.n. AVA25887, G16519. 29/14.



Permalink

Open invitation to tender, deadline 07.10.2014, for construction of eastern section

twin single-track tubes of lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contract comprises two lots: lot 1 from km76.640 to km83.975; lot 2 onwards to km84.050. Contract duration 15.04.2015 to 10.03.2024. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Further information, specs and docs from https://www.ava-online.at, where tenders or requests to participate can be registered. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=243209-2014. Ref.n. AVA30444, B13047. NUTS-Code AT12. 29/14.



Permalink

Deadline postponed from 07.10.2014 to 21.10.2014 for open invitation to tender for construction of eastern section twin single-track tubes of lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contract comprises two lots: lot 1 from km76.640 to km83.975; lot 2 onwards to km84.050. Contract duration 15.04.2015 to 10.03.2024. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Further information, specs and docs from https://www.ava-online.at, where tenders or requests to participate can be registered. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339654-2014. Ref.n. AVA30444, B13047. 41/14.



Permalink

Postponed to 18.11.2014 the deadline of the open invitation to tender for construction of eastern section twin single-track tubes of lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contract comprises two lots: lot 1 from km76.640 to km83.975; lot 2 onwards to km84.050. Contract duration 15.04.2015 to 10.03.2024. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358026-2014 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=372678-2014. 45/14.



Permalink

The Group IL – Ingenieurburo Laabmayr & Partner ZT GesmbH/BERNARD Ingenieure ZT-GmbH/Geoconsult Salzburg ZT GmbH – pA IL – Ingenieurburo Laabmayr & Partner ZT GesmbH of Salzburg secured the EUR21.93 million contract, excluding VAT, for construction supervision services during lot SBT1.1 works at the Gloggnitz tunnel, part of the Semmering base tunnel. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=203542-2015. Ref.n. AVA25887, G16519. 25/15. 



Permalink

The JV Implenia Oesterreich GmbH/Hochtief Infrastructure GmbH/Thyssen Schachtbau GmbH – pA Implenia Oesterreich GmbH of Salzburg secured the EUR456.555.964, excluding VAT, for construction of eastern section twin single-track tubes of lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, tel + 43 193000-45812, fax -45829, e-mail richard.polaczek@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231104-2015. Ref.n. AVA30444, B13047. NUTS-Code AT12. 27/15




Permalink


The Group Geoconsult ZT GmbH, Geoconsult Wien ZT Gesellschaft mbH – pA Geoconsult ZT GmbH of Wals bei Salzburg  secured the EUR5.86 million contract, excluding VAT, for hydro-geological documentation and engineering geological consulting for lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, e-mail richard.polaczek@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238560-2015. Ref.n. AVA25886, G16456. 28/15.




Permalink


Invitation to tender using negotiated procedure, deadline 12.10.2015, for supervision services during lot SBT3.1 works at the Grautschenhof tunnel, part of the Semmering base tunnel. Contract duration 04.04.2016 to 30.04.2026. Contact OEBB Infrastruktur AG, attn Ing. Andreas Windhaber, Graz, tel +43 316930006645, e-mail andreas.windhaber@oebb.at. Tenders or requests to participate must be sent to  https://www.ava-online.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=333129-2015. Ref.n. 2015/@AVA ID-N.31040. 39/15.




Permalink


Invitation to tender using negotiated procedure, deadline 27.10.2015, for geological and hydro-geological services for the Grautschenhof tunnel and its access at Mürzzuschlag  (lot SBT3), part of the Semmering base tunnel. Contract duration 01.05.2016 to 31.10.2022. Contact OEBB Infrastruktur AG, attn Ing. Roland Leitner, Vienna tel +43 6648243407, fax +43 316930006616, e-mail roland.leitner@oebb.at. Tenders or requests to participate must be sent to  https://www.ava-online.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=343588-2015. Ref.n. 2015/@AVA ID-N.33205. 40/15.




Permalink


Marti GmbH with Marti Tunnelbau AG secured the EUR 300.86 million contract, excluding VAT, for construction works at the 7km twin tube Grautschenhof tunnel (lot SBT3.1), which is part of the Semmering base tunnel. The contract duration is from 04.04.2016 to 30.04.2026. For further information contact OEBB Infrastruktur AG, OEBB Infrastruktur AG, Vienna, e-mail ferdinand.zinsmeister@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=176965-2016. Ref.n. 2015/@AVA ID-N.41688. 21/16.




Permalink


Open invitation to tender, deadline 30/11/2023, for the railway equipment for the Semmering Base Tunnel and the associated operationally required facilities such as technical and ventilation buildings (lot SBT4.1). Click here for tender documents and where tenders must be sent. Duration of contract from 01/06/2024 to 26/11/2029. Contact OEBB-Infrastruktur AG, Vienna, email peter.csoengei@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=387416-2023. Ref.n. 101079. 42/23. 




Permalink


Negotiated procedure with prior call for competition, deadline 25/04/2024, for the delivery and laying of the track support slabs (GTP) for the slab track (FF) in the Semmering Base tunnel (lot SBT5.1). Click here for tender documents and where tenders must be sent. Duration of contract is from 02/06/2025 to 03/12/2028. Contact OEBB-Infrastruktur AG, Vienna, email thomas.Thaller@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=624345-2023. Ref.n. 106056. 42/23. 




Permalink


Negotiated procedure with prior call for competition, deadline 15/12/2023, for the local construction supervision service for the equipment (including track superstructure, slab track, electrical engineering, telecommunications, mechanical systems, etc.) for the Semmering Base Tunnel. Duration of contract is from  01/06/2024 to 31/12/2029. Contact OEBB-Infrastruktur AG, Vienna, email reinhard.stoiser-resch@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=653539-2023. Ref.n. 102727. 44/23. 



Permalink

Austria, Land of Salzburg - at/23

Highway

6.4 km existing tube to be dualled under contract to be issued in 2001 following disastrous fire in first tube which killed 12 people on 29th May, 1999. Repairs underway. August 1999. Project management of second tube awarded by OSAG to Intergeo/Kermer engineering consortium who will act as independent reviewer checking design, tender and execution, together with plausibility of procedures and conformance with relevant standards, regulations and instructions. Updating of existing design carried out by Geoconsult. Visit www.geoconsult.at August 2000.Preinformation notice for construction supervision of the second tube of the Tauern tunnel (6.4 km). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=068251-2003, OJ S 77, or contact í–SAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at and visit www.asfinag.at 17/03.Preinformation notice for construction supervision for the second tube of the Tauern tunnel (6.4 km) on the Tauern motorway A10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=222103-2003, OJ S 249, or contact í–SAG, Vienna, fax +43 15313414020. E-mail office.wien@oesag.at. Visit www.asfinag.at 02/04.Restricted call for tenders, deadline 14th December, 2004 for construction supervision for the second tube of the 6.4 km Tauern tunnel on highway A10. Work to begin in April 2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=188810-2004, OJ S 219, or contact Asfinag, Vienna, fax +43 15313414420. E-mail office.wien@asfinag.at 47/04.Restricted procedure, deadline 19th January, 2005 for construction supervision for the electrical and mechanical equipment of the second bores of the Katschberg and Tauern tunnels, 5.8 km and 6.4 km respectively, as well as renovation of the first bores. Estimated cost for electrical and mechanical equipment: EUR55 million. Contract running from May 2005 to 2011. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=205152-2004, OJ S 238, or contact Osterreichische Autobahnen- und Schnellstrassen, Vienna, fax +43 15313414420. E-mail office.wien@asfinag.at 51-52/04.Restricted procedure, deadline 14th November, 2005 for work inspection during the construction phase of the 6.4 km second tube of the Tauern tunnel on highway A 10 Tauern, including the rehabilitation of the existing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=195562-2005, OJ S 198, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 43/05.Open call for tenders, deadline 8th February, 2006 for construction of the second tube of the Tauern tunnel on highway A 10. Total length is 6,545 m, whereof 6,244 m mined. Cross section: 88 to 107 sq m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=230806-2005, OJ S 234, or contact ASFINAG, Vienna, fax +43 5010814020. E-mail baumanagement@asfinag.at 50-51/05.Restricted procedure, deadline 18th January, 2006 for geotechnical measurements, control measurements and scanning of documents during construction of the second tube (6,546 m) of the Tauern tunnel on highway A 10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=236930-2005, OJ S 240, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 52/05-01/06.Restricted procedure, deadline 18th January, 2006 for the structural tunnel designs for the second Tauern tunnel (6,546 m) and preparation of the tender and design for the rehabilitation of the existing tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=237999-2005, OJ S 241, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 52/05-01/06.Restricted procedure, deadline 18th January, 2006 for geological engineering during and after tunnelling of the second Tauern tunnel (6,546 m) on highway A 10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=237996-2005, OJ S 241, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 02/06.Open call for tenders, deadline for 9th January, 2007 for process instrumentation for the second tube of the Katschberg and Tauern tunnels. Both the 5,565 m-long Katschberg and the 6,546 m-long Tauern tunnels are on highway A 10. The bored part of the Tauern tunnel is 6,392 m long. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=229272-2006, OJ S 214, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 47/06.Open invitation to tender, deadline 17th June, 2008 for supply and assembly of the tunnel ventilation plant for the Salzburg-bound and the Villach-bound tubes (2 x 6,400 m) of the Tauern tunnel on the Tauern motorway A10. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112428-2008, OJ S 83, or contact ASFINAG, Vienna, fax +43 5010814420. E-mail baumanagement@asfinag.at 20/08.IDS bagged a EUR1.5 million contract related to the new Tauern tunnel, the old Tauern tunnel and the operation centre in Salzburg. The main job is for site management and to be in contact with the companies, who offer the safety equipment for both tubes (ventilation, power supply, emergency power supply, fire detection, air quality measurement systems, lighting, control systems, etc.). All these different systems have to be monitored during installation in respect to their function, costs and time. Also cost and time control as well as status reports are included in the contract. The operation centre in Salzburg is the main point for all incoming information from all tunnels in the area. Visit www.ids.or.at 22/08.



Permalink

G. Völkl GesmbH of Leoben, www.voelkl.co.at, has secured the EUR1.5 million contract for supply and installation of the flaps for the tunnel ventilation system for the Salzburg-bound and the Villach-bound tubes (2 x 6,400 m) of the Tauern tunnel on the A10 motorway. Contact ASFINAG, Vienna, fax +43 5010814420, e-mail baumanagement@asfinag.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=137277-2009. 22/09.