The consortium 3G Gruppe Geotechnik Graz ZT GmbH, ILF Consulting Engineers Austria GmbH, Tecton Consult Baumanagement GmbH from Graz-Seiersberg secured the EUR17.86 million contract, excluding VAT, for the local construction supervision service for the equipment (including track superstructure, slab track, electrical engineering, telecommunications, mechanical systems, etc.) for the Semmering Base Tunnel. Contact OEBB-Infrastruktur AG, Vienna, tel +43 664 28 66 771, email reinhard.stoiser-resch@oebb.at. Visit https://ted.europa.eu/en/notice/-/detail/206356-2024. Ref.n. 102727. 23/24.