The Group Geoconsult ZT GmbH, Geoconsult Wien ZT Gesellschaft mbH – pA Geoconsult ZT GmbH of Wals bei Salzburg secured the EUR5.86 million contract, excluding VAT, for hydro-geological documentation and engineering geological consulting for lot SBT1.1 at the Gloggnitz tunnel, part of the Semmering base tunnel. Contact OEBB Infrastruktur AG, attn Richard Polaczek, Vienna, e-mail richard.polaczek@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238560-2015. Ref.n. AVA25886, G16456. 28/15.