Route options under study on RN5 in Isle of Reunion include a unique tunnel between Entre-Deux and Cilaos or two tunnels, the first between Entre-Deux and Palmiste-Rouge (3-4 km) and the second between Palmiste-Rouge and Bras-Sec in Cilaos (700-800 m). Two lanes, bi-directional, diameter 12 m. Cost estimate €122-€228 million. 21/02.



Permalink

France, Rhone - Alps - fr/47

Highway

Restricted procedure, deadline 10th June, 2002 for engineering services dealing with construction of a 12.9 km 4.8 m-diameter safety tunnel parallel to the existing Frejus tunnel between France and Italy. There will be 30 m-long interconnecting passages every 400 m. The tender also deals with the installation of tunnel equipment (ventilation, lighting, telephone, video, electric supply, etc.). Construction estimated at €230 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 94-74382 or contact SFTRF, Paris, fax +33 144689955. 21/02. Restricted call for tenders, deadline 7th April, 2003 for engineering services as part of the construction of a 4.8 m-diameter 6 km-long service tunnel on the French part of the Fréjus road tunnel, with cross passages every 400 metres. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040828-2003, OJ S 47, or contact Société franí§aise du tunnel routier du Fréjus (SFTRF), Patrick Guilhaudin, Paris, fax +33 147059901 or Yves Cipierre, Modane, fax 479202610, e-mail ycipierre@tunneldufrejus.com 11/03.Restricted call for bids, deadline 18th August, 2003 for engineering services prior to the construction of a 12.9 km-long 4.8 m-diameter service tunnel parallel to the main tunnel. Also 30 m-long cross passages every 300 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126377-2003, OJ S 139, or contact SFTRF, Paris, fax +33 147059901. 31/03.Lombardi has pocketed a EUR1.44 million contract for engineering services for the study of a 12.9 km-long 4.8 m-diameter service tunnel parallel to main tunnel. Also 30 m-long cross passages every 300 m. Visit www.lombardi.ch 24/04.Restricted call for tenders, deadline 21st July, 2004 for engineering as part of construction of a 12.9 km safety and rescue tunnel parallel to the existing cross-border Frejus tunnel between France and Italy. SFTRF, the French operator, and its Italian counterpart SITAF will deal with the same engineering consultancy. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100639-2004, OJ S 119, or contact SFTRF, Modane, fax +33 479202610. 27/04.Accelerated restricted procedure, deadline 27th June, 2005 for repairs in the Frejus tunnel, where a fire erupted on 4th June. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=112916-2005, OJ S 114, or contact SFTRF, Modane, fax +33 479202610. 25/05.Open call for tenders, deadline 18th September, 2007 for engineering from the contract awarding phase to the commissioning phase for the planned safety tunnel parallel to the existing 12.9 km tunnel. Read E-News Weekly 1/2007, 19/2006 & 35/2003. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=170600-2007, OJ S 138, or contact SFTRF, Modane, fax +33 479053120. 31/07.Inexia, the engineering arm of the French Railways, SNCF, in joint venture with SEA Consulting and SWS Engineering, both of Italy, pocketed a EUR6.2 million project management contract for the planned safety tunnel parallel to the existing 12.9 km Frejus cross-border road tunnel between France and Italy, from the contract awarding phase to the commissioning phase. Visit www.inexia-ingenierie.com, www.seaconsult.eu and www.swsengineering.it 16/08.Open invitation to tender, 16th December, 2008 for construction of the Frejus tunnel safety bore (lot 1) on the French side. The 12.9 km-long 9 m-wide bidirectional tunnel links Modane in France and Bardonecchia in Italy and is the major road connection between Lyon and Turin. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=251497-2008, OJ S 190, or contact SFTRF, Modane, fax +33 479053120. E-mail marchespublics@tunneldufrejus.com. Click here. 41/08.



Permalink

Open invitation to tender, deadline 19.01.2010, for topographical and photographic mapping of the Frejus tunnel (12,870 m). Contract duration 4 months. Contact Director General at SFTRF in Modane, tel +33 47920-2600, fax -6806, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=326307-2009. 49/09.



Permalink

Open invitation to tender, deadline 16.02.2010, for the refurbishment of the electrical installations in the Frejus tunnel. Contact Didier Simonnet at GEIE-GEF in Modane, tel +33 47920-2600, fax -6806, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=355981-2009. 53/09.



Permalink

Postponed from 16.02.2010 to 16.03.2010, the deadline for open invitation to tender for refurbishment of electrical installations in Frejus tunnel. Contact Didier Simonnet at GEIE-GEF in Modane, tel +33 47920-2600, fax -6806, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=039005-2010. 07/10.



Permalink

Contract notice, deadline 07.09.2010, for installation of permanent lighting equipment in the 12.9 km Frejus cross-border road tunnel between France and Italy. French or Italian legislation may be followed, but the same method has to be used for the entire tunnel by way of contracts with both SITAF SpA and SFTRF SA. Contract value EUR17,120,379.66, excluding VAT, duration 31 months. Contact Sitaf SpA, Direzione tecnica, Susa, tel +39 0122621621, fax +39 0122629673, e-mail dt@sitaf.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=217101-2010. 30/10.



Permalink

Razel groupement Bilfinger Berger (Orsay) secured the EUR130 million contract, VAT not included, for construction of the Frejus tunnel safety bore (lot 1) on the French side. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=143996-2009, OJ S 100. 23/09.



Permalink

Open invitation to tender, deadline 08.09.2011, for general management for replacement of ventilation system in the Frejus tunnel. Duration of contract 96 months. Contact Direttore Generale, SFTRF, Modane, tel +33 4792026-00, fax -10, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214431-2011 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=241448-2011. 32/11.



Permalink

Open invitation to tender, deadline 20.03.2012, for new safety signs along Frejus tunnel to new safety tunnel bypasses. Contract duration 36 months. Contact SFTRF, attn General Manager, Modane, tel  +33 479202600, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=SeekDeliver&language=en&docid=032215-2012. 06/12.



Permalink

Open invitation to tender, deadline 03.05.2012, for radio communication equipment maintenance in Frejus tunnel. Duration of contract 12 months. Contact Salvatore Sergi,  GEIE-GEF, Modane, tel +33 4792026-00, fax -10, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=081842-2012. 12/12.



Permalink

Sielte SpA of San Gregorio di Catania secured the EUR8.9 million contract, excluding VAT, for installation of permanent lighting equipment in the 12.9 km Frejus cross-border road tunnel between France and Italy. Contact Sitaf SpA, Direzione tecnica, Susa, tel +39 0122621621, fax +39 0122629673, e-mail dt@sitaf.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092254-2012. 14/12. 



Permalink

Negotiated procedure, deadline 09.07.2012, for the French side of the HVDC Italy-France interconnection inside the safety gallery of the Frejus tunnel as well as emergency repair on faults due to internal or external causes or third party action, for 10 years. Participation in the tender is subject to a preliminary qualification of suppliers.

The execution of the work is foreseen between January and March, 2014 in the safety gallery, and until October, 2014 outside the gallery. Contract duration 01.09.2013 to 01.09.2015. Contact RTE (Reseau de transport d'electricite), attn Emilie Hetier, Paris La Defense, tel +33 1444530-90, fax -50, e-mail emilie.hetier@rte-france.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=197729-2012. 26/12.



Permalink

Open invitation to tender, deadline 13.06.2013, for rental and maintenance of fire extinguishers placed in Frejus tunnel. The contract is composed of two lots: lot 1 for Italy side and lot 2 for France side. Duration of contract 12 months after award. Contact GEIE-GEF, att.n Salvatore Sergi, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=136456-2013. 17/13.



Permalink

Dekra Inspection SAS of Limoges secured the EUR7,549 contract, excluding VAT, for periodic controls and checks, required by law, on power installations, mechanical equipment, pressure equipment  and thermal installations in the Frejus tunnel and two platforms in the tunnel. Duration of contract 12 months after award. Contact GEIE-GEF, att.n Salvatore Sergi, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135802-2013. 17/13.



Permalink

Open invitation to tender, deadline 23.09.2013, for o.m of the Frejus tunnel and access platforms, competence of Geie-Gef. Duration of contract 12 months, extendable up to a maximum of 4 years. Contact GEIE-GEF, att.n Salvatore Sergi, Modane, tel +33 479202600, fax +10, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=261093-2013. 32/13.



Permalink

Open invitation to tender, deadline 19.12.2013, for rockbolting in the Frejus tunnel. Duration of contract 24 months after award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=380388-2013. Ref. n. DTE/AO/TUN13-21. 46/13. 



Permalink

Open invitation to tender, deadline 17.01.2014, for maintenance of uninterruptible power system in the 12.9 km Frejus cross-border road tunnel between France and Italy. Duration of contract 12 months, value EUR40,000-EUR160,000. Contact Salvatore Sergi, GEIE-GEF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=402832-2013. Ref.n. GEIE GEF 13-09. 49/13.



Permalink

Open invitation to tender, deadline 10.03.2014, for periodic detailed inspection of civil engineering of the Frejus tunnel. Duration of contract 36 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=019982-2014. Ref n. DTE/AO/TUN 14-04. 04/14.



Permalink

Sitalfa SPA of Turin secured the contract for o.m of the Frejus tunnel and access platforms, competence of Geie-Gef. Contact GEIE-GEF, att.n Salvatore Sergi, Modane, tel +33 479202600, fax +10, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079071-2014. 11/14.



Permalink

Open invitation to tender, deadline 11.09.2014, for periodic detailed inspection of the A43 structures. Value of contract EUR50,000-150,000, duration 12 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=246059-2014. Ref. n. SIE/AO/AUT/14-21. 30/14.



Permalink

Restricted invitation to tender, deadline 03.11.2014, for general management during the last part of construction of the Frejus tunnel safety bore (lot 1) on the French side. Duration of work 38 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com .Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=337173-2014. Ref. DTE/AOR/TUN 14-28. 41/14.



Permalink

Open invitation to tender, deadline 16.01.2015, for maintenance of the payment system in the Frejus tunnel. Value of contract EUR100,000-400,000, excluding VAT. Duration of  contract 12 months from award. Contact GEIE-GEF, attn Salvatore Sergi, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=407672-2014. Ref. n. GEIE-GEF 14-09. 49/14.



Permalink

GTS of Saint Priest secured the EUR3.77 million contract, excluding VAT, for rockbolting in the Frejus tunnel. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=000127-2015. Ref. n. DTE/AO/TUN13-21. 01/15. 



Permalink

Sites of Rueil-Malmaison secured the EUR254,156 contract, excluding VAT, for periodic detailed inspection of civil engineering of the Frejus tunnel. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=001409-2015. Ref n. DTE/AO/TUN 14-04. 02/15.



Permalink

SPIE Sud Est of Feyzin secured the EUR77,571.24 contract, excluding VAT, for maintenance of uninterruptible power system in the 12.9 km Frejus cross-border road tunnel between France and Italy. Contact Salvatore Sergi, GEIE-GEF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=003445-2015. Ref.n. GEIE GEF 13-09. 02/15.



Permalink

Postponed from 16.01.2015 to 30.01.2015, the deadline of the open invitation to tender for maintenance of the payment system in the Frejus tunnel. Value of contract EUR100,000-400,000, excluding VAT. Duration of contract 12 months from award. Contact GEIE-GEF, attn Salvatore Sergi, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012770-2015. Ref. n. GEIE-GEF 14-09. 04/15.



Permalink


Restricted invitation to tender, deadline 09.07.2015, for replacement of the ventilation system in the Frejus road tunnel, before opening of the second tube. Duration of work 90 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=190046-2015. Ref. DTE/AOR/TUN/15-16. 23/15.



Permalink


Restricted invitation to tender, deadline 09.07.2015, for the renovation of the power supply chain and control of the ventilation system of the Frejus road tunnel, before opening of the second tube. Duration of work 90 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=190042-2015. Ref. DTE/AOR/TUN 15-17. 23/15.



Permalink


Restricted invitation to tender, deadline 07.10.2016, for the ventilation system in the second tube of the Frejus road tunnel (lot 4). Duration of work 60 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=272651-2016. 32/16.




Permalink

Restricted invitation to tender, deadline 07.10.2016, for the installation of cooling, lighting, power, fire detection and signalling equipment in the new second                                                                                                                                                                                                                                                                                                                                                                              Frejus road tube and for the upgrading in the existent tube (lot 1). Duration of the work is 60 months from award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=272649-2016. 32/16.





Permalink


Eiffage Energie from Meyziau and Eiffage Genie Civi from Lyon secured the EUR14.11 million contract, excluding VAT, for the replacement of ventilation systems in the Frejus road tunnel. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=275043-2016. Ref.n. 15-76524. 32/16.




Permalink


Clemessy SA from Mulhouse and Sielte SpA from Rome secured the EUR8.55million contract, excluding VAT, for the upgrading of the power supply and control-operation chain of the ventilation system in the Frejus road tunnel. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=275040-2016. Ref.n. 15-81304. 32/16.




Permalink

Restricted invitation to tender, deadline 07.10.2016, for installation in the Frejus road tunnel of CCTV equipment,  automatic incident detection, radio, emergency call system, fire detection, access control and telephones, to be put in the new tube  and also for updating the existing tube. Further information for the candidature phase at can be found at http://marches-publics.sis-marches.com/srtf/index.jsp. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=267242-2016. 40/16.



Permalink

Restricted invitation to tender, deadline 07.10.2016, for installation of centralized technical management (GTC) / Supervision (Sup) - communication networks (Rsx) equipment in the new tube of the Frejus road tunnel and also for  the existing tube and platforms buildings to be upgraded. Further information for the candidature phase at http://marches-publics.sis-marches.com/srtf/index.jsp. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=267687-2016. 40/16.



Permalink

Restricted invitation to tender, deadline 21.07.2017, for the supply of two fire fighting vehicles to be used in the Frejus tunnel. Contact Didier Simonnet at GEIE-GEF in Modane, tel +33 47920-2600, fax -6806, e-mail marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234488-2017. Ref.n. GEIE GEF/17-01. 26/17.



Permalink

The awarding procedure for the ventilation system in the second tube of the Frejus road tunnel (lot 4) has been interrupted. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=047648-2018.

Ref.n. DTE/AOR/TUN/16-16. 06/18.



Permalink

Restricted invitation to tender, deadline 05.03.2018, for the ventilation system in the second tube of the Frejus road tunnel (lot 4). Duration of the contract is 30 months. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=047627-2018.

Ref.n. DTE/AOR/TUN/18-02. 06/18.



Permalink

Open invitation to tender, deadline 20.03.2018, for the manufacture and supply of protection buffers for the fire control conduit in the Frejus tunnel. Duration of  the contract will be 24  months from the award. Contact SFTRF, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062841-2018.

Ref. n. DTE/AO/TUN/18-03. 10/18.



Permalink

Restricted invitation to tender, deadline 23.07.2018, for the assignment to an Civil engineering support service for all of the lots from the M1 to M5 for the safety coordination in the Frejus tunnel. Value of the contract is EUR121,16 million, excluding VAT. Duration of the contract is 1740 days from award. Contact SITAF, Susa, tel +39 122621621, fax +39 122629658, email ar@sitaf.it. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=274939-2018.

26/18.



Permalink

The JV Exenet Srl/Sidel Ingegneria Srl/Rocksoil SpA from Padoa secured the EUR657,577.18 contract, excluding VAT, for the safety coordination services, for lots from M1 to M5, during equipment works in the Frejus safety tunnel. Contact SITAF, Susa, tel +39 122621617, fax +39 122629658, email gare@sitaf.it. For bid documents click here.

Ref.n. CIG 753582250A. 32/19.



Permalink

SFTRF (Societe française du Tunnel Routier du Frejus ) awarded the contracts for roadside assistance, towing and evacuation on the motorway under SFTRF concession of the heavy vehicles (over 3.5 t): Maurienne Depannage from Pontamafrey-Montpascal secured Lot 1 from Aiton to Saint-Michel de Maurienne; Modane Depannage from Modane secured Lot 2 from Saint-Michel de Maurienne to Frejus tunnel platform and Frejus tunnel both directions. Contact Societe française du Tunnel Routier du Frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. For bid documents click here. 32/19.



Permalink

Restricted invitation to tender, deadline 23.07.2018, for the safety coordination services for every lots from M1 to M5, during equipment works in the Frejus safety tunnel. Value of the contract is EUR897,522.53, excluding VAT. Duration of the contract is 1740 days from award. Contact SITAF, Susa, tel +39 122621621, fax +39 122629658, email ar@sitaf.it. For bid documents click here

Ref.n. CIG 753582250A. 26/18.



Permalink

TTS - Trafic Transport Surete from Venissieux secured the EUR 499,480 contract, excluding VAT, for maintenance of video surveillance and automatic incident detection systems for the Frejus tunnel. Contact Groupement d'exploitation du Frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. For bid documents click here. Ref.n. Gef201902. 35/19.



Permalink

Duverneyautomobiles SAS from Saint-Jean-de-Maurienne secured the EUR201,982.40 contract, excluding VAT, for the renewal of patrol vehicles for the Frejus Tunnel safety service. Contact Groupement d'exploitation du Frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. For tender information please click here Ref.n. Gef201906. 08/20.



Permalink

The French company Spie Citynetworks from Feyzin secured the EUR2.01 million contract, excluding VAT, for  preventive and corrective maintenance of fire detection and electrical installations in the Frejus tunnel. Contact Groupement d'exploitation du Frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. For tender information please click here . Ref.n. Gef201907. 21/20.





Permalink


TTS  - Trafic Transport Surete from Venissieux (F) secured the EUR401,983 contract, excluding VAT, for  maintenance of the video/ automatic incident detection system for the A43 Maurienne including the Frejus tunnel. Contact SOC francaise tunnel routier de Freju, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com

For tender information please click here. Ref.n. 2020aoes08. 30/20.





Permalink


GTA from Lyon secured the EUR1.97 million contract, excluding VAT, for metal structures, painting of technical rooms and various fittings in the new tube of the Frejus road tunnel.  Contact SFTRF,  Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. For further tender information please click here. Ref.n. 2020aotf15. 51/20.

 




Permalink


Open invitation to tender, deadline 05/07/2021, for road assistance services, towing and evacuation of vehicles with GVW <=3.5 t and their attachments on the SFTRF network. The contract consists of two lots: Aiton - Pontamafrey (lot 1), Pontamafrey - Tunnel du Frejus platform and Tunnel du Frejus in both directions (lot 2). For tender documents click here, where tenders must be sent. Duration of the contract is 60 months. Contact Societe francaise du tunnel routier du Frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. For further information on tender click here. Ref.n. 2021pasc13. 22/21. 

 




Permalink

See Critical Comms from Lens Lestang has secured the EUR569,811.92 contract, excluding VAT, for maintenance of radiocommunication equipment inside the Frejus tunnel. Contact Groupement d'exploitation du Frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=301046-2022. Ref.n. Gef202106. 23/22. 



Permalink

 

Open invitation to tender, deadline 21/12/2023, for maintenance of IT networks, applications and cybersecurity of the Frejus tunnel. For tender documents click here, where tenders must be sent. Duration of the contract is 12 months. Contact Groupement d exploitation du frejus, Modane, tel +33 479202600, fax +33 479202610, email marchespublics@tunneldufrejus.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=699364-2023. Ref.n. GEF202303. 46/23. 

 




Permalink

France, Biarritz - fr/46

Sewer

Open tendering, deadline 21st June, 2002 for construction of the Marbella 774 m outfall sewer, 1.6 m to 1.8 m in diameter, and 15 m-deep 12 m-diameter shaft. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 71-55126 or contact Communauté d'Agglomération de Bayonne-Anglet-Biarritz, Bayonne, fax +33 559447299. 21/02.Award to Smet Tunnelling (Belgium) of a €4.9 million contract to build the 774 m-long 1.6-1.8 m-diameter Marbella outfall sewer. 38/02.



Permalink

France, Bordeaux - Lyon - fr/45

Highway

Restricted procedure, deadline 27th May, 2002 for the drill/blast construction of the Muratel twin-tube tunnel (260 + 270 m) and the Guillaumaux twin-tube tunnel (2 x 795 m) on section 4.2 between Thénon and Villac on the A89 highway in Dordogne. Support with rockbolts, steel arches and shotcrete. Work to start first semester of 2003. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 81, documents 63096- and 63097-2002 or contact Autoroutes du Sud de la France, Paris, fax +33 147533634, and the Scetauroute/Ingerop jv, fax +33 450273940, for technical info. Visit www.asf.fr 18/02. A JV of Scetauroute and Ingérop has pocketed a €2.4 million contract for engineering studies for the Muratel tunnel (260 + 270 m) on the A89, section Thénon-Villac.Visit www.scetauroute.fr 03/03.Restricted call for tenders, deadline 15th November, 2004 for engineering for the Tarare and Chalosset tunnels plus a viaduct on section Balbigny - La Tour-de-Salvagny on highway A89. The contract includes a review of the draft design, preliminary studies, cost estimate, quality assurance, etc. The tunnels, 1 km and 1.1 km in length respectively, will be twin tubes with two lanes per direction. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=171226-2004, OJ S 200, or contact Autoroutes du Sud de la France, Paris, fax +33 147533634. 43/04.Restricted call for tenders, deadline 15th November, 2004 for engineering for the Violay tunnel on section Balbigny - La Tour-de-Salvagny on highway A89. The contract includes a review of the draft design, preliminary studies, cost estimate, quality assurance, etc. The tunnel, 4 km in length, will be a twin tube with two lanes per direction. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=171214-2004, OJ S 200, or contact Autoroutes du Sud de la France, Paris, fax +33 147533634. 43/04.Restricted procedure, deadline 30th January, 2006 for ground investigation (core drilling and tests) for three tunnels planned on the A89 highway, section Balbigny-La Tour de Salvagny. From Balbigny in the east to La Tour de Salvagny in the west, the tunnels and their estimated lengths are Violay (3,880 m / 3,980 m for the full lengths including the portals), Buissière (950 m mined and 1 km with the cut-and-cover portals) and Chalosset (680 m mined and 740 m with the cut-and-cover portals). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=248968-2005, OJ S 252, or contact ASF, Paris, fax +33 172714709. 02/06.Scetauroute and ISIS received a EUR22.9 million contract for lead engineering (studies and construction) for section Balbigny-La Tour de Salvigny on highway A89. Three tunnels are planned on this section: Violay (3,880 m / 3,980 m), Buissière (950 m / 1 km) and Chalosset (680 m / 740 m). Visit www.scetauroute.fr and www.isis-its.com 30/06.Scetauroute and Jean Muller International (JMI) received a EUR22 million contract for studies and construction supervision for the Violet, Bussiere and Chalosset tunnels on section Balbigny - La Tour-de-Salvagny on highway A89. Click fr/45. Visit www.scetauroute.fr and www.jmi.groupegis.com 31-32/06.Cofor pocketed a EUR3.2 million contract for ground investigation (core drilling and tests) for the Violay, Bussiere and Chalosset tunnels on section Balbigny - La Tour-de-Salvagny on highway A89. Visit www.spac.fr 31-32/06.Open call for tenders, deadline 15th January, 2007 for geological investigation by very high resolution seismic reflection, on the 4 km route of the Violay tunnel on the A89. The overburden varies from 50 to 180 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=233162-2006, OJ S 217, or contact Scetauroute, Pringy, fax +33 450 273940. 47/06.Restricted call for tenders, deadline 31st January, 2008 for construction of the 2 x 3.9 km Violay tunnel on the Balbigny-La Tour de Salvagny section of motorway A89. Both tubes will be connected by seven pedestrian cross passages and six vehicular cross passages. Conventional tunnelling will be used. Support with bolts, steel arches and shotcrete. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290921-2007, OJ S 239, or contact ASF, Rueil-Malmaison, fax +33 477325652. 52/07-01/08.Restricted invitation to tender, deadline 5th June, 2008 for construction of the 2 x 1 km La Bussière tunnel on the Balbigny-Lyon section of highway A89 in the Rhone department. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=115099-2008, OJ S 85, or contact ASF, Lyon, fax +33 472139819. 20/08.Restricted invitation to tender, deadline 5th June, 2008 for construction of the 2 x 700 m Chalosset tunnel on the Balbigny-Lyon section of highway A89 in the Rhone department. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=115100-2008, OJ S 85, or contact ASF, Lyon, fax +33 472139819. 20/08.



Permalink

JV Eiffage TP and Campenon Bernard TP secured the contract, value EUR158 million, for construction of the 2 x 3.9 km Violay tunnel on the Balbigny-La Tour de Salvagny section of motorway A89. Contract duration 37 months, starting May, 2009 using conventional methods. Both tubes will be equipped with 7 pedestrian bypasses, 6 vehicular crosspassages, an electrical sub-station and a longitudinal ventilation system. The section will be opened in 2012. Visit www.travauxpublics.eiffage.com, www.dodincampenonbernard.fr and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=39857-2009. 20/09.



Permalink

Invitation to tender by restricted procedure, deadline 10.09.2010, for installation of electrics, lighting, fire suppression, ventilation, signs, video and radio communications in three bi-tube tunnels situated on A89 east Balbigny-La Tour de Salvagny section, Violay (3.9 km), Bussiere (1 km), and Chalosset (0.7 km) together with associated construction work. Contract duration 18 months. Further information from J J Lacaze at ASF in Lyon, tel +33 427462701, fax +33 472139819 to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=221934-2010. 30/10.



Permalink

Additional information notice covering restricted invitation to tender for installation work in Violay, Bussiere and Chalosset tunnels on A89 East Balbigny-La Tour de Salvagny section originally published under TED 221934. Refer to tunnelbuilder archive fr/45 for original notice. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=255375-2010. 35/10.



Permalink

Cegelec Centre Est and SAS Enfrasys secured the EUR38.2 million contract, VAT not included, for installation of electrics, lighting, fire suppression, ventilation, signs, video and radio communications in three bi-tube tunnels situated on A89 east Balbigny-La Tour de Salvagny section, Violay (3.9 km), Bussiere (1 km), and Chalosset (0.7 km) together with associated construction work. Further information from ASF in Rueil-Malmaison, tel +33 172719000. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=137188-2011. 18/11.



Permalink

Open invitation to tender,  deadline 17.05.2018, for the repair and maintenance services of electrical distribution equipment in tunnels situated on the A89 motorway, east of Lyon, from 2019 to 2022. Value of the contract is EUR526,000 excluding VAT. The duration of the contract is 48 months. Tenders or requests to participate must be submitted electronically via https://consultations-asf.omnikles.com. Further information from ASF in Rueil-Malmaison, email yann.morcello@vinci-autoroutes.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=157554-2018.15/18.



Permalink

France, Paris - fr/44

Metro Line 4

STIF, the Paris area transport authority, has approved the Line 4 extension between Montrouge and Bagneux. The 3.2 km underground extension will serve three new stations at Mairie de Montrouge, Verdun sud and Bagneux. The first phase comprises the construction of the Mairie de Montrouge station and the tunnel from Porte d'Orléans, for a cost of €144 million. Commissioning programmed for 2007. Visit www.stif-idf.fr 17/02.Negotiated procedure, deadline 21st July, 2006 for construction of the Porte d'Orleans-Montrouge extension on Line 4. The 1,477 m-long extension is divided in three lots and includes an underground station in Mairie de Montrouge. Read E-News Weekly 16/2005. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118057-2006, OJ S 110, or contact RATP, Paris, fax +33 158769449. E-mail thomas.arrondeau@ratp.fr 25/06.A joint venture of BEC Frères, Soletanche Bachy, Urbaine de Travaux and Sotraisol Fondations bagged a EUR35.6 million contract to build lot T1 of the extension of Line 4 from Porte d'Orléans to Montrouge. This is a 677 m tunnel. Read E-News Weekly 16/2005. These companies also pocketed lot T3 of the tender for the construction of niches in the existing tunnel in Porte d'Orleans. Read E-News Weekly 14/2007. Visit www.becfreres.com, www.soletanche-bachy.com, www.fayat.com/2978-11197-11300-11641-11710/URBAINE-DE-TRAVAUX.htm, www.sotraisol.fr and http://extension-reseau.ratp.fr/m4 06/08.A joint venture of Razel and its parent company Bilfinger Berger bagged a EUR36.2 million contract to build lot T2. This is a 800 m tunnel and the Mairie de Montrouge station. Read E-News Weekly 16/2005. Visit www.razel.fr, www.bilfingerberger.de and http://extension-reseau.ratp.fr/m4 06/08.



Permalink

Invitation to tender by negotiated procedure, deadline 25.05.2009, for construction of surface ventilation shaft and underground connections at Saint-Germain-Odeon station on line 4. Contract duration 13 months. Specs and docs from Sophie Mendy at RATP in Paris, tel +33 1587-69421, fax -71381, e-mail sophie.mendy@ratp.fr to whom tenders or requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=108972-2009 17/09.



Permalink

Negotiated procedure, deadline 22.03.2010, for low-tension studies and works (lot TS01) for the Porte d'Orleans-Montrouge extension on Line 4. Contract duration 22 months. Contact Mrs Isabelle Forn at RATP in Paris, tel +33 158769926, fax +33 158771381, e-mail isabelle.forn@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061974-2010. 10/10.



Permalink

Invitation to tender by negotiated procedure, deadline 26.03.2010, for three niches, an operations sidewalk and tunnel widening (lot T4) of the Porte d'Orleans-Montrouge extension on Line 4. Contract duration 10 months. Contact Mrs Isabelle Forn at RATP in Paris, tel +33 158769926, fax +33 158771381, e-mail isabelle.forn@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=063937-2010. 10/10.Negotiated procedure, deadline 26.03.2010, for masonry and painting work (lot T5) of the Porte d'Orleans-Montrouge extension on Line 4. Duration contract 18 months. Contact as above. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=063938-2010. 10/10.



Permalink

Negotiated invitation to tender, deadline 14.09.2011, for the construction of geotechnical investigation shafts for the 1.5 km Mairie de Montrouge-Bagneux extension on Line 4. The new section will include two new stations at Verdun Sud and Bagneux. Project comprises 4 tranches, 3 of them conditional. Contact Myriam Fontaine-Boulle, RATP, Fontenay-sous-Bois Cedex, tel +33 158770195, fax +33 158769468, e-mail myriam.fontaine-boulle@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=241244-2011. 31/11.



Permalink

Negotiated invitation to tender, deadline 12.06.2013, for the metro Line 4 extension (lot T2) at Bagneux. The contract includes the cut/cover tunnel between underground and open sections, Bagneux station with main and secondary access, and other structures. Duration of contract 60 months after award. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, fax +33 158769468, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142852-2013. Bid Code n. MOP13-0039. 18/13.



Permalink

Negotiated invitation to tender, deadline 12.06.2013, for underground work for the metro Line 4 extension (lot T1) at Bagneux. Duration of contract 60 months after award. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=142853-2013. Bid Code n. MOP13-0040. 18/13.



Permalink

The awarding procedure for the metro Line 4 extension (lot T2) at Bagneux has been discontinued. The contract included the cut/cover tunnel between underground and open sections, Bagneux station with main and secondary access, and other structures. The contract may be the subject of a re-publication. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, fax +33 158769468, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328624-2013. Bid Code n. MOP13-0039. 40/13.



Permalink

The awarding procedure for underground work for the metro Line 4 extension (lot T1) at Bagneux has been discontinued. The contract may be the subject of a re-publication. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328625-2013. Bid Code n. MOP13-0040. 40/13.



Permalink

Negotiated invitation to tender, deadline 15.11.2013, for the metro Line 4 extension (lot T2) at Bagneux. The contract includes the cut/cover tunnel between underground and open sections, Bagneux station with main and secondary access, and other structures. Duration of contract 60 months after award. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, fax +33 158769468, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=352255-2013. Bid Code n. MOP13-0122. 43/13.



Permalink

Negotiated invitation to tender, deadline 15.11.2013, for underground work for the metro Line 4 extension (lot T1) at Bagneux including 630 m-long x 7.8 m vaulted tunnel using conventional mining and 600 sq m x 25 m-deep South Verdun station and associated works. Duration of contract 60 months after award. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=352256-2013. Bid Code n. MOP13-0159. 43/13.



Permalink

The JV Demathiet Bard Constrution/Guintoli SAS/Nge Genie Civil/G.T.S/Impresa Pizzarotti of Montigny-les-Metz secured the contract for the metro Line 4 extension (lot T2) at Bagneux. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, fax +33 158769468, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=63948-2015. Bid Code n. mop14-0129. 09/15.



Permalink


SPIE Batignolles TPCI, Dodin Campenon Bernard, Chantiers modernes construction, Sogea TOI, SPIE Fondations and Botte Fondation of Boulogne-Billancourt secured the contract for underground work for the metro Line 4 extension (lot T1) at Bagneux, including 630 m-long x 7.8 m vaulted tunnel using conventional mining and 600 sq m x 25 m-deep South Verdun station and associated works. Contact Jean-Philippe Da Costa, RATP, Paris, tel +33 158770350, e-mail jean-philippe.da-costa@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=191722-2015. Ref. n. MOP13-0159. 23/15.



Permalink

Negotiated invitation to tender, deadline 27.10.2017, for development work, of a centre for train maintenance, tunnel and associated works on the metro Line 4 extension (lot T4) at Bagneux. The duration of the contract is 37 months after the award. For further information https://ratp.bravosolution.com/web/login.html, where tenders have to be sent. Contact RATP, Paris, tel +33 158769920, email cecile.migeon@ratp.fr.. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=396748-2017. Bid Code n. DHA_2017MOP11626. 41/17.



Permalink

Samex from  Clamart secured the contract for heating, ventilation, air conditioning and smoke extraction works on the metro Line 4 extension (lot S3) at Bagneux. The duration of the contract is 44 months after the award. For further information https://ratp.bravosolution.com/web/login.html.Contact RATP, Paris, tel +33 158769920, email cecile.migeon@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040076-2018.

Bid Code n. DHA_2017MOP10922. 05/18.



Permalink

Firac from Poissy secured the contract for the study, supply, installation, commissioning and 1 year of preventive and corrective maintenance of 4 grids for the connection track closing on the metro line 4 of the RATP Metro. Contact RATP, attn Sylvie Guyon, Paris, tel +33 158770629, email sylvie.guyon@ratp.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061806-2018.

Bid Code n. DHA_2017GDI11217. 07/18.



Permalink

France, Lyons - fr/43

Ring Road

  Restricted tendering, deadline 12th February, 2002 for feasibility studies for the missing west portion of the ring road. Route alternatives will be studied between the north ring road in Ecully and the Bonnefoy Blvd. in Saint-Fons. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 8, document 6025-2002 or contact Communauté Urbaine  de Lyon, fax +33 4 78634979. 04/02. Award to a joint venture of Centre d'Etudes Techniques de l'Equipement (CETE)/Centre d'Etude des Tunnels (CETu)/Jean-Vincent Berlottier/Tim Boursier-Mougenot/Edmond Cezard/XL Studio/Silène of the feasibility study on the route alternatives of the west ring road in Lyon to connect the north section in Ecully with Saint-Fons. Visit www.equipement.gouv.fr/cetu and www.grandlyon.com 40/02.



Permalink

France, Alsace - Lorraine - fr/42

Road

  Preinformation notice for the upgrading of the 7 km Maurice Lemaire tunnel in Sainte-Marie-aux-Mines. A parallel tunnel, to be used both for rescue and ventilation, will be bored north of the existing tunnel from both portals. This tunnel will be connected to the existing tunnel by escape cross passages, smoke removal ducts and boreholes for utilities. The existing tunnel needs heavy renovation for ventilation, electricity and lighting, safety, centralised technical management, signalling, video and automatic detection, emergency calls, anti-fire device, etc. Work cost around €120 million. Time frame fall 2002-2007. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 4, document 2828-2002 or contact Société des Autoroutes Paris-Rhin-Rhône, fax +33 1 47533820. Also visit www.saprr.fr 03/02. Restricted tendering for the construction of a 7 km tunnel as part of the upgrading of the Maurice Lemaire tunnel in Sainte-Marie-aux-Mines. Deadline 19th February, 2002. The first 500 metres, cross section 40 sq m, will be driven using traditional means in gneiss and mylonite. The rest will be TBM-driven, 6 m-diameter in gneiss and hard abrasive granite. Drill/blast of cross passages between the new and the existing tunnels. Also raise-drilling. Complete renovation of the tunnel. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 11, document 8099-2002 or contact the Scetauroute/Bonnard et Gardel jv for technical details, Lausanne, fax +41 6181122. Also visit www.saprr.fr 04/02.A JV between Bouygues and Eiffage will renovate the 6,872 m-long Maurice Lemaire tunnel on trunk road RN159 in Sainte-Marie-aux-Mines for EUR180 million (July 2000 value). A new rescue and service tunnel will be TBM-driven parallel to the existing main tunnel which will also undergo heavy refurbishment. The JV has ordered a 6 m-diameter Herrenknecht hard rock gripper TBM. The machine will be delivered in mid-October 2004 for tunnelling start at end 2004. Support will consist of shotcrete, steel arches, wiremesh, and rockbolts. One concrete segment will be installed at the invert. The first 500 m will be bored using conventional means, a hydraulic hammer or excavator and drill/blast. Geology consists of gneiss and granite. The service tunnel will be divided in two levels by a concrete slab. The lower level will be for escape and rescue and the upper level for exhaust smoke removal and ventilation. The excavated rock will be removed out of the TBM by means of a conveyor belt. The main tunnel, closed to trucks since March 2000 for safety reasons, needs substantial improvements. These will consist in removing, dusting off and recycling the exhaust smoke duct (7 km), rebuilding the culverts, building safety niches, rock chambers for turning points and cross passages to the new tunnel every 400 m. All tunnel equipment (exhaust smoke removal, electric power, lighting, signalling, etc.) is not part of the contract. Work to start in April 2004 for completion in winter 2007. Financing by the concessionaire SAPRR (80%), the government (10%) and the Alsace and Lorraine regions (5% each). Visit www.saprr.fr and www.herrenknecht.com 04/04.Marti Technics has won the muck removal contract for the Maurice Lemaire tunnel renovation from the Bouygues / Eiffage JV. A new safety and rescue tunnel, which route follows a 250 m radius, will be built parallel to the existing 6,872 m tunnel. Marti Technics will design, build, install and manage a 6,755 m belt conveyor, equipped with a fully automatic 500 m belt reserve advancing in perfect synchronicity as the TBM progresses. The tunnel links the Vosges and Upper Rhine counties. It is a former railway tunnel first opened in 1937 and converted to road traffic in 1976. It was closed to heavy vehicles in March 2000 amid fears of another disaster further to the Mont Blanc tunnel fire which, one year earlier, killed 39 people. Visit www.martitechnik.ch. 31-32/04.Restricted call for tenders, deadline 19th May, 2005 for supply and installation of high and low voltage and lighting equipment in the 6,950 m Maurice Lemaire tunnel which connects Haut-Rhin and Vosges departments. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074258-2005, OJ S 77, or contact Autoroutes Paris-Rhin-Rhone, Paris, fax +33 147533820. 17/05.Restricted call for tenders, deadline 19th May, 2005 for ventilation equipment, associated metalwork and part of their electric supply for the 6,950 m Maurice Lemaire tunnel which connects Haut-Rhin and Vosges departments. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=075318-2005, OJ S 78, or contact Autoroutes Paris-Rhin-Rhone, Paris, fax +33 147533820. 18/05.Restricted call for tenders, deadline 19th May, 2005 for radiocommunication for the 6,950 m Maurice Lemaire tunnel, the parallel safety tunnel under construction and the portals. This tunnel connects Haut-Rhin and Vosges departments. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=075314-2005, OJ S 78, or contact Autoroutes Paris-Rhin-Rhone, Paris, fax +33 147533820. 18/05.Restricted call for tenders, deadline 19th May, 2005 for low voltage systems for the 6,950 m Maurice Lemaire tunnel (facility management, networks, PC equipment, telephone and sound systems in the cross passages, emergency call system, fire detection, galleries and technical rooms, access control). This tunnel connects Haut-Rhin and Vosges departments. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=075313-2005, OJ S 78, or contact Autoroutes Paris-Rhin-Rhone, Paris, fax +33 147533820. 18/05.Restricted call for tenders, deadline 19th May, 2005 for fixed and mobile firefighting means for the 6,950 m Maurice Lemaire tunnel which connects Haut-Rhin and Vosges departments. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=075317-2005, OJ S 78, or contact Autoroutes Paris-Rhin-Rhone, Paris, fax +33 147533820. 18/05.



Permalink


Open invitation to tender, deadline 17/11/2022, for firefighting and first aid service in the 6905 m Maurice-Lemaire tunnel and its access roads. For tender documents please click here, where tenders must be sent.  Duration of the contract is 96 months. Contact APRR - DGA Exploitation, attn Christian Noack, Saint Apollinaire, tel +33 329537500, fax +33 329537509, email Christian.noack@aprr.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=519664-2022. Ref.n. 2201501. 39/22. 

 

France-Saint-Apollinaire: Fire-brigade and rescue services


2022/S 184-519664

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: APRR - DGA EXPLOITATION
National registration number: 01625002900309
Postal address: 36, rue du Docteur Schmitt
Town: Saint apollinaire
NUTS code: FRC11 Côte-d’Or
Postal code: 21850
Country: France
Contact person: APRR - district de Lorraine - site du Tunnel Maurice-Lemaire - Christian NOACK -
E-mail: Christian.noack@aprr.fr
Telephone: +33 329537500
Fax: +33 329537509
Internet address(es):
Main address: http://www.aprr.fr
Address of the buyer profile: https://aprr.achatpublic.com
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://aprr.achatpublic.com
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://www.achatpublic.com/sdm/ent/gen/ent_detail.do?PCSLID=CSL_2022_hkoStsDmaN
Tenders or requests to participate must be submitted to the abovementioned address
I.4)Type of the contracting authority
Other type: Société concessionnaire d'autoroutes
I.5)Main activity
Other activity: Société concessionnaire d'autoroutes

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Equipes de première intervention (EPI) Tunnel Maurice Lemaire (TML) avec fourniture et maintenance des véhicules d'intervention tunnélisés (VIT)


Reference number: 2201501
II.1.2)Main CPV code
75250000 Fire-brigade and rescue services
II.1.3)Type of contract
Services
II.1.4)Short description:


Réalisation d'une prestation de première intervention (lutte contre l'incendie et secours aux personnes) et de missions complémentaires (surveillance du réseau y compris viabilité hivernale, contrôle des matériels et équipements de sécurité, sécurité au péage, sécurité sur réseau hors tunnel) sur le périmètre du domaine du Tunnel Maurice-Lemaire (TML) avec fourniture et maintenance des véhicules d'intervention tunnélisés (VIT). Le trafic moyen au sein du TML est de l'ordre de 3800 véhicules / jour dont 20 % de poids lourds.


II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.2)Additional CPV code(s)
63712320 Tunnel operation services
35111000 Firefighting equipment
34144210 Firefighting vehicles
44480000 Miscellaneous fire-protection equipment
II.2.3)Place of performance
NUTS code: FRF34 Vosges
NUTS code: FRF12 Haut-Rhin
Main site or place of performance:


Tunnel entre la commune de Lusse (Vosges -88) et Sainte-Marie-aux-Mines (Haut Rhin - 68).


II.2.4)Description of the procurement:


Service de lutte contre les incendies et de premier secours sur l'ensemble du domaine du Tunnel Maurice-Lemaire (TML) à savoir :* son espace circulé qui comprend 3 400 m + 950 m environ de routes d'accès et les 6 950 m du tunnel ,* le tunnel proprement dit et son infrastructure ,* l'ensemble des locaux sur les 2 plates-formes à chaque tête de tunnel.Fourniture d'équipement de lutte contre l'incendie : 2 Véhicules d'intervention tunnélisés et appareils d'assistance respiratoire.S'agissant d'un service de sécurité relatif à l'exploitation d'une mission d'intérêt général, le service de première intervention doit être assuré 7 jours sur 7, 24 heures sur 24.


II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 96
This contract is subject to renewal: yes
Description of renewals:


Le marché est conclu pour une durée ferme de cinq ans à compter de la date de notification et reconductible tacitement trois fois par périodes successives d'un an.


II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:


Les prestations pourront donner lieu à la passation d'un nouveau marché pour la réalisation de prestations similaires, passé en application de la procédure négociée de l'article R. 2122-7 du code de la commande publique.


II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information


A titre indicatif, les prestations du marché débuteront le 01/07/2023 à minuit et une minute . Le titulaire est soumis à une obligation de reprise du personnel. L'effectif est de 24 personnes. Tous les détails sont indiqués dans le DCE.Une visite du Tunnel Maurice-Lemaire est obligatoire préalablement à la remise des offres (RDV auprès de Christian NOACK - tel +33 6 08 86 20 30)



Permalink


Open invitation to tender, deadline 21/09/2023, for waterproofing work on building roofs and awnings on the APRR-AREA-ADELAC-ALIAE network. Click here for tender documents. The contract is composed of 6 lots: Lot 5 involves the 7km Maurice Lemaire tunnel. Duration of the contract will be 12 months.  Contact APRR , Saint Apollinaire, tel +33 325303224, email Sandrine.ruppanner@aprr.fr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=452631-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=208829-2023. Ref.n. BPC001192. 32/23. 




Permalink

France, Val-de-Marne - fr/41

Sewer

Preinformation notice released by SIAAP, the Paris metropolitan sewage authority, for the construction of a 2,290 m-long 3 m-diameter sewer main and two shafts, 10 and 12 m in diameter, in Choisy-Le-Roi and Créteil. Work cost ranging from €38 to €39 million. Work to commence in September, 2002. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 1, document 380-2002, contact SIAAP, Paris, fax +33 144754415 or e-mail andre.modot@siaap.fr 03/02. Open tendering, deadline 6th June, 2002 for the construction of a 2,290 m-long 3 m-diameter waste water sewer at an average depth of 25 metres in Choisy-Le-Roi and Créteil. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 74, document 57436-2002 or contact SIAAP, Paris, fax +33 144754415. 17/02. Preinformation notice for construction of a 1.8 km-long 4 m-diameter wastewater collector sewer in Créteil and Valenton. Work to start in February 2003. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=115627-2002, OJ S 146, or contact SIAAP, Paris, fax +33 144756960. 32/02. Open call for tenders, deadline 17th December, 2002 for construction in Créteil and Valenton of lot 2 of sewer VL10, second part from shaft P2 to the Sesame treatment plant's shaft. A TBM will be used to bore a 1,820 m-long 4 m ID tunnel. Concrete segmental lining. Geology consisting of Saint-Ouen marls and limestone with gypsum, Beauchamps sands, marls and loose stones. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=172305-2002, OJ S 217, or contact SIAAP, Paris, fax +33 144756190. 46/02.A JV of CSM Bessac, Coccinelle and Urbaine de Travaux has been awarded a €35.3 million contract to build a 1,820 m-long 4 m ID section of sewer VL10 using a shield TBM with compressed air-sealed excavation chamber. Segmental lining. The contract also includes a connection between sewers VL1 and VL10 using traditional means. Visit www.csmbessac.com, www.urbaine.com and www.siaap.fr 17/03.Open invitation to tender, deadline 21.01.2009, for construction of the second section of the V19 collector trunk between shaft P1 at Maisons Alfort in Alfortville and shaft P3 at Creteil, and design of shaft P2 and its connection to V19. Contract duration 52 months. Possible follow-up construction of P2 north, duration 36 months. Further information from Gerard Maillet at SIAAP, tel +33 1 4475 4426, e-mail gerard.maillet@siaap.fr or visit www.siaap.fr. Specs and docs from marchesiapp@siaap.fr. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=323315-2008 51/08.



Permalink

Open invitation to tender, deadline 26.05.2009, for construction of 1.6 km-long, 3 m ID tunnel Lot 3 of V19 collector together with 30 m-deep shafts P3 at 12 m ID and P4 at 10 m ID in Creteil. Contract duration 30 months. More from Gerard Mary at SIAAP in Paris, tel +33 144756-132, fax -100, e-mail gerard.mary@siaap.fr. Specs and docs, tenders and requests to participate to SIAAP, marchesiaap@siaap.fr, tel +33 1447544-26, fax -15.http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102799-2009 16/09.



Permalink

France, Grenoble - fr/40

Ring Road

Preliminary studies by Scetauroute approved by Metro, the Grenoble Metropolitan Area. Three variants are being considered. The first is a 2 m-diameter single tube. The second is a 2.7 m-diameter twin tube. They would both cross ll'íŽle Verte and the Bastille in tunnels. The third is a single bore that would cross the Bastille and Presqu'í®le in tunnels. Metro considers the project cost must be reduced scrapping the twin-tube option and opting for shallower depth under the Isère River and Presqu'í®le. Visit www.smtc-grenoble.org/Rapport 20PDU.pdf 47/01. Open call for bids, deadline 16th September, 2002 for engineering studies for the north ring road in Grenoble including eight alignment alternatives, all including tunnels, either single or twin bores. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=114159-2002, OJ S 144, or contact DDE de l'Isère, Grenoble, fax +33 476707784 or +33 476707898. 33/02. Open call for bids, deadline 1st October, 2002 for assistance during the planning and follow-up of the project consisting of a dual two-lane expressway including tunnels. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=130744-2002, OJ S 162, or contact DDE de l'Isère, Grenoble, fax +33 476707898. 35/02.Open call for bids, deadline 6th April, 2003 for assistance during the planning and management of the project consisting of a dual two-lane expressway including tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030591-2003, OJ S 36, or contact DDE de l'Isère, Grenoble, fax +33 476707898. 09/03.Preinformation notice for engineering and technical consultancy services for the draft design, environmental impact study and public hearings for a dual two-lane freeway including tunnels. Tenders to be invited in October 2003. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=137631-2003, OJ S 151, or contact DDE de l'Isère, Grenoble, fax +33 476707898. E-mail sgt.dde-isere@equipement.gouv.fr 36/03.Open invitation to tender, deadline 28th November, 2003 for the draft design for a dual two-lane freeway including tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=191114-2003, OJ S 212, or contact DDE de l'Isère, Grenoble, fax +33 476707898. E-mail sgt.dde-isere@equipement.gouv.fr 46/03.Setec, Lavigne and Pade will carry out the conceptual design of a 5 km dual two-lane freeway, including a 2.5 km tunnel under the Bastille. Visit www.setec.fr 41/04.Open call for tenders, deadline 23rd November, 2007 for assistance for the management of Grenoble’s northern ring road. This 6 km dual-carriageway road link will connect two motorways, the A41 Grenoble-Chambéry in the east and the A480 Grenoble-Lyon in the west. Its route runs mainly underground, in shallow cut-and-cover tunnels or bored tunnels. To know more, read E-News Weekly 42/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=244299-2007, OJ S 201, or contact Conseil général de l’Isère, Grenoble, fax +33 476003919. 43/07.A joint venture including CETu (Centre d'Etudes des Tunnels), CETE (Centre d'Etudes Techniques de l'Equipement), both under the Ministry of ecology, sustainable development and land planning, Bonnard et Gardel and its subsidiary Tonello scooped a EUR3.8 million contract for advise and general technical assistance for the north ring road in Grenoble. Read E-News Weekly 42/2007. Visit www.cetu.equipement.gouv.fr and www.bg-21.com 08/08.Open invitation to tender, deadline 29th April, 2008 for general project management for the northern ring road in Grenoble, a 2 x 6 km road link to connect the A41 and A480 highways. Its route is mainly underground, in shallow cut-and-cover tunnels or deep bored tunnels. Read E-News Weekly 42/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=78755-2008, OJ S 58, or contact Conseil général de l'Isère, Grenoble, fax +33 476003919. 14/08.Open invitation to tender, deadline 13th May, 2008 for geotechnical studies for the northern ring road in Grenoble, a 2 x 6 km road link to connect the A41 and A480 highways. Its route is mainly underground, in shallow cut-and-cover tunnels or deep bored tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=90605-2008, OJ S 67, or contact Conseil général de l'Isère, Grenoble, fax +33 476003919. 16/08.Open invitation to tender, deadline 13th May, 2008 for hydrogeological study for the northern ring road in Grenoble, a 2 x 6 km road link to connect the A41 and A480 highways. Its route is mainly underground, in shallow cut-and-cover tunnels or deep bored tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=90606-2008, OJ S 67, or contact Conseil général de l'Isère, Grenoble, fax +33 476003919. 16/08.Sogreah won the tender for the hydrogeological study for the northern ring road in Grenoble, a 2 x 6 km road link to connect the A41 and A480 highways. Its route is mainly underground, in shallow cut-and-cover tunnels or deep bored tunnels. Visit www.sogreah.fr 32-33/08.A joint venture led by Egis Route, with Ilex, Sogreah and Strates as partners, pocketed a EUR3 million contract for general project management for the northern ring road in Grenoble, a 2 x 6 km road link to connect the A41 and A480 highways. Its route is mainly underground, in shallow cut-and-cover tunnels or deep bored tunnels. Visit www.egis.fr 37/08.The geotechnical studies have been commissioned to Fondasol. Visit www.fondasol.fr 37/08.



Permalink

Invitation to apply, deadline 25.09.2009, for 30-40 year public works concession for design, construction, operation and maintenance of 6.1 km-long section of ring road through Grenoble, Saint-Martin-le-Vinoux, La Tronche and Meylan including 1.7 km-long tunnel beneath Bastille Hill and 2.4 km of cut and cover through Meylan and La Tronche. Construction estimate EUR550-650 million, duration four years, completion 2014. More from Departement de l'Isere: contact c.plet@cg38.fr for further information, s.jeanney@cg38.fr for specific documentation, and s.favre-buisson@cg38.fr for address for applications. For contracting authority, contact Max Lambert at mission rocade-Nord in Grenoble, tel +33 476003-003, fax -919, e-mail m.lambert@cg38.fr. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=197298-2009 30/09.



Permalink

France, Grenoble - Sisteron - fr/39

Highway

Feasibility studies in hand for two-lane dual carriageway along national road RN 75 with four tunnels including 2 x 2.35 km-long Jocou on the Croix-Haute pass, and Rochette (2 x 110 m), Rochasson (2 x 530 m) and Faye (2 x 700 m). Work also commencing on 2 x 1.3 km-long Sinard tunnel towards Coynelle. 43/01. Tenders for construction of the 990 m Sinard tunnel on A51 to be invited in March, 2002. Single bore with parallel service gallery. Tendering for preparatory works expired since 11th December, 2001. Visit www.area.fr 51/01. Preinformation notice for the construction of the Coynelle-Col du Fau section of the A51 highway. Includes the 1 km Sinard tunnel. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 11, document 8031-2002. Also visit www.area-autoroutes.fr 04/02. Restricted procedure, deadline 12th April, 2002 for the construction of the 1 km Sinard tunnel. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 52, document 40314-2002 or contact AREA, Paris, fax +33 147533820 / +33 1478718886. 12/02.Construction of the 945 m-long dual-lane Sinard tunnel on highway A 51 between Coynelle and the Fau Pass started on 17th November, 2003. The contractors Bec Frères and Carillion BTP are using a three-boom Robofore drill rig to blast the main tunnel in full section (80 sq m) from the south drive. As of 31st March, progress has reached 228 m. Half section excavation (50 sq m) of the parallel safety tunnel with a second three-boom Robofore drill rig. Progress has reached 184 m as of 31st March. A third three-boom Robofore will start at mid-April on the north drive to excavate some 20 m on the main tunnel and 50 m on the safety tunnel to clear space to allow for the construction of a viaduct. This third machine, like one of the other two, is on rental. Three ground profiles are encountered for the main tunnel. Profile 1.2 is good ground requiring 4 cm of fibre-reinforced shotcrete and 3 cm of non-reinforced shotcrete. Six to seven Swellex bolts every two metres vertically and horizontally. Profile 2.2 is ground of lower quality requiring 7 cm of fibre-reinforced shotcrete and 3 cm of non-reinforced shotcrete combined with Swellex bolts every 1.5 m. Profile 5.1 necessitates HEB 180 steel supports every 1 or 1.5 m, sheet plates or shotcrete filling. Drill rigs to be equipped with longer feeds to allow 5 m advances. The safety tunnel is supported with fibre-reinforced and non-reinforced shotcrete. There will be no lining. A Sika-PM500 shotcrete robot is used at the site. First cross passage between both tubes at 150 m and then one every 200 m. Excavation of first cross passage has just started. Visit www.robodrill-sa.com, www.sika-stm.com, www.becfreres.com and www.carillionbtp.fr 15/04.Restricted call for tenders, deadline 11th April, 2005 for firefighting equipment of the Sinard tunnel. This 945 m tunnel is a main tube, for bidirectional traffic, and a parallel safety tunnel, which will become the second tube when traffic increases once the highway is extended farther south. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=047077-2005, OJ S 38, or contact AREA, Bron, fax +33 472353201. E-mail dirc@area-autoroutes.fr 12/05.Restricted call for tenders, deadline 11th April, 2005 for high and low voltage equipment of the 945 m Sinard tunnel (electrical equipment, lighting, centralised management, video monitoring and automatic incident detection, signalling). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=047075-2005, OJ S 38, or contact AREA, Bron, fax +33 472353201. E-mail dirc@area-autoroutes.fr. Subscribe E-News Weekly 8/2005. 12/05.Yvroud Europeenne des Fluides received a EUR178,000 contract for firefighting equipment in the Sinard tunnel (945 m) on the A 51 highway Grenoble-Sisteron, section Coynelle-Col du Fau. Read E-News Weekly 8/2005. Visit www.yvroud.com 09/06.



Permalink

Awarded the contracts for light and heavy maintenance of ventilation in tunnels for APRR, AREA and ADELAC.

AXIMA CONCEPT from Lyon, Lot 1, value EUR870 207,44, excluding VAT, for Maurice Lemaire tunnel;

YVROUD from Aiton, Lot 2, value EUR 1.39 million, excluding VAT, for  tunnel Chamoise, Saint-Germain and Chatillon of APRR on the A40 motorway; and Lot 3, value EUR 1.92 million, excluding VAT, for tunnels Dullin (1600 m), Epine (3200 m), Sinard (995 m), Uriol (490 m) and Petit Brion (595 m) of AREA and ADELAC on the A41, A43 and A51 motorways. Contact APRR, Saint Apollinaire, email Laurence.galland@aprr.fr. Visit https://ted.europa.eu/en/notice/-/detail/159201-2024. Ref.n. BPC000956. 11/24.