Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Milan - it/16

Metro

Extension to Line 3 between Zara and Maciachini with 980 m in driven tunnel commenced September, 1998 and 1,330 m extension to Line 2 between Famagosta and Abbiategrasso with 188 m in tunnel will start April, 1999. April 1999.   Invitation to tender by prequalified contractors for extension to Line 3, deadline 20th January, 2000. Fax Metropolitana Milanese +39 02780033. December 1999.   Award of line 3 extension contract between Machiachini and Dergano stations to CMC/Torno. Visit www.torno.it 23/01.   Extensions to lines 1, 3, 4 and 5 in design totalling 29.5 km of 9 m-diameter tunnel with 34 stations. Invitations to tender expected 2002-2004. Fax Metro Milan +39 027 80033 or visit www.atm-mi.it 37/01.   Preinformation notice for construction of the Molino Dorino-Rho Fiera extension to Line 1, running 2.1 km underground with two stations. Cost ?115 million. Bids will be invited by end October 2002. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=126737-2002, OJ S 158, or contact Metropolitana Milanese, Milan, fax +39 02780033. 35/02.   Open call for bids, deadline 5th December, 2002 for construction of the 2.1 km-long Molino Dorino-Rho Fiera extension to Line 1 serving two stations. Tender value €122 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=174838-2002, OJ S 220, or contact Metropolitana Milanese, Milan, fax +39 027780033. 47/02.  A JV formed by Torno Internazionale, FIAT Engineering and ICLET has been awarded a €87 million contract to design and build the Molino Dorino-Rho Fiera extension to line 1. Visit www.atm-mi.it 06/03.A group of companies headed by Astaldi, including Torno Internazionale, Ansaldo Trasporti Ferroviari, AnsaldoBreda and Alstom has won a 27-year concession contract to design and build Line 5 for €504 million. The 5.6 km line is fully underground, starting in Garibaldi with stops in Isola, Zara, Marche, Istria, Ca' Granda, Rodi, Bicocca and Bignami. Time frame: five years. Visit www.astaldi.it and www.torno.com 49/03.Open call for bids, deadline 7th July, 2004 for construction of the 1.6 km Dergano-Affori FNM extension to Line 3 with two stations in Affori Centro and Affori FNM. From Dergano, this dual-track tunnel includes two 8.7 m-diameter bored stretches, 338 m and 700 m in length, separated by a 10 m-long conical junction at the entrance of Affori Centro station, a 96.5 m-long 8.9 m-diameter cut-and-cover portion, a 51 m-long 8.7 m-diameter bored tunnel segment and a 82.4 m-long 8.7 m-diameter cut-and-cover stretch. Equipment is not included. Tender value: EUR67 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=079389-2004, OJ S 100, or contact Metropolitana Milanese, Milan, fax +39 02780033. E-mail info@metropolitanamilanese.it 23/04.Torno Internazionale secured a EUR48 million contract for the civil engineering of the 1.6 km Dergano-Affori FNM extension to Line 3 with two stations in Affori Centro and Affori FNM. From Dergano, this dual-track tunnel includes two 8.7 m-diameter bored stretches, 338 m and 700 m in length, separated by a 10 m-long conical junction at the entrance of Affori Centro station, a 96.5 m-long 8.9 m-diameter cut-and-cover portion, a 51 m-long 8.7 m-diameter bored tunnel segment and a 82.4 m-long 8.7 m-diameter cut-and-cover stretch. Visit www.torno.com 02/05.Notice of works contract, deadline 13th June, 2005 for construction of the Famagosta-Assago section on Line 2, including approx. 1.5 km of cut-and-cover tunnel and two stations in Assago Milanofiori Nord and Assago Milanofiori Forum. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=070349-2005, OJ S 73, or contact Metropolitana Milanese, Milan, fax +39 02780033. E-mail info@metropolitanamilanese.it or visit http://osservatorio.oopp.regione.lombardia.it 16/05.Concession contract, deadline 30th May, 2005 for final and construction design, construction and operation during 27 years of Line 5. This is a 5,645 m line, entirely underground, between Garibaldi station on Line 2 and Bignami, to serve 9 stations every 600 m approximately (Garibaldi, Isola, Zara, Marche, Istria, Ca' Granda, Bicocca, Ponale and Bignami). A project financing proposal presented by Astaldi, Torno Internazionale, Ansaldobreda, Ansaldo Trasporti Sistemi Ferroviari and Alstom has been accepted in November 2003 to promote the project. This consortium has a right of preemption on the project. If the city of Milan receives better offers from other bidders, the Astaldi-led JV will be allowed to modify its bid in accordance with the best offer. Tender estimate: EUR503.1 million (VAT not included). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=071216-2005, OJ S 74, or contact Comune di Milano, Milan, fax +39 0288467226. E-mail giuseppe.cozza@comune.milano.it. Also visit www.comune.milano.it/bandi/index.html 17/05.Line 5 of Milan's metro will be Italy's first metro line to be designed, built and operated under a concession contract by a private operator. The line is proposed by a consortium formed by Astaldi, Torno Internazionale, Alstom, Ansaldobreda and Ansaldo Trasporti Sistemi Ferroviari. Their proposal has been declared of public interest. Last May, when the invitation to tender expired, another consortium of companies, including Impregilo, Condotte and Grassetto, requested to participate in the tender, by submitting a prequalification request for the design, construction and operation of the new line. On 18th October, the City of Milan received a financial and technical bid submitted by this consortium. The concession contract for the line should be awarded by year's end. The 5.6 km fully automatic driverless line will run completely underground and serve nine stations. The estimated cost is EUR504 million (EUR193 million paid by the private sector and EUR311 million by public financing). Construction to last 5 ½ years. 50-51/05.A JV headed by Astaldi and including Torno Internazionale, Ansaldo Trasporti Sistemi Ferroviari, Ansaldobreda, Alstom and ATM, Milan's public transport operator, received a EUR504 million contract to design, build and operate during 27 years Line 5 of the Milan metro. Fully automatic driverless light trains will travel below ground along the Zara-Testi axis and serve nine stations (5.6 km). Completion of the project will take five years. Click it/16 and here. Visit www.comune.milano.it, www.astaldi.it and www.torno.com 09/06.Notice of works contract awarded by the concessionnaire, deadline 3rd May, 2006 for design and construction of the 1.2 km Affori FNM-Comasina extension of Line 3 in north Milan, Comasina station and service and security structures. The internal diameter of the twin-track tunnel is 8.9 m. It will be built using the jet grouting method and open cut excavation. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=050110-2006, OJ S 48, or contact Metropolitana Milanese, Milan, fax +39 02780033. E-mail dac@metropolitanamilanese.it 12/06.Notice of public works concession, deadline 28th July, 2006 for design and construction of Line 4 of the Milan metro. The 7.5 km line will serve 13 stations. The contract is estimated at EUR717 million. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118613-2006, OJ S 111, or contact Comune di Milano, Milan, fax +39 0288467221. E-mail giuseppe.cozza@comune.milano.it 25/06. The concessionaire led by Astaldi, and including Ansaldo Trasporti Sistemi Ferroviari (STS), Ansaldobreda, Torno, Alstom Trasporti and Azienda Trasporti Municipalizzata (ATM), has signed its contract with the city of Milan for the construction of Line 5 of the metro, for a total value of EUR502 million. The signing paves the way to Italy's first ever urban transport infrastructure to be developed under concession, which includes the line's management for 27 years. Astaldi and Ansaldo STS hold stakes of 23.3% and 26.4% respectively. For the design and the construction activities, Astaldi's share equals to EUR119 million, with Ansaldo STS accounting for EUR118 million and Alstom for EUR46 million, while EUR35 million corresponds to Ansaldobreda's supply of rolling stock. The 5.6 km light, fully automated underground Line 5 will link Garibaldi station to Via Bignami in Milan's eastern outskirts, through nine stations. Click here. Visit www.astaldi.it and www.ansaldo-sts.com 25/06.Europea 92 has been awarded a EUR25.8 million contract for design and construction of the 1.2 km Affori FNM-Comasina extension of Line 3 in north Milan, Comasina station and service and security structures. The internal diameter of the twin-track tunnel is 8.9 m. It will be built using the jet grouting method and open cut excavation. Visit www.europea92spa.it 49/06.



Permalink

Open invitation to tender, deadline 14.07.2009, for equipment and finishing works at Maciachini-Comasina section of Milan Metro Line 3, including Dergano, Affori Centro, Affori FNM and Comasina stations. Contract value EUR54,562,444, duration 456 days. Latest date for receipt of requests for documents or for accessing documents is 26.06.2009. Contact Metropolitana Milanese S.p.A, Direzione Appalti e Contratti, Milan, tel +39 0277471, fax +39 02780033, e-mail dac@metropolitanamilanese.it. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=132319-2009. 21/09.



Permalink

The JV A.M.G.C./Appalti Setter/Elevatori Normac/Montanari (Genoa) secured the contract, value EUR16.4 million, for technological systems, completion structural works and surface arrangements of the Famagosta-Assago extension of Line 2 metro Milan. Duration of work 305 days. Contact Metropolitana Milanese SpA, Direzione Appalti e Contratti, Milan, tel +39 0277471, fax +39 02780033, e-mail dac@metropolitanamilanese.it. Visit www.amgc.it and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=256742-2009. 39/09.



Permalink

Consorzio Ravennate (Ravenna) secured the contract for equipment and finishing works at Maciachini-Comasina section of Milan Metro Line 3, including Dergano, Affori Centro, Affori FNM and Comasina stations. Contract value EUR 33,377,768, duration 456 days. Contact Metropolitana Milanese SpA, Direzione Appalti e Contratti, Milan, tel +39 (0)2 77471, fax +39 (0)2 780033, e-mail dac@metropolitanamilanese.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=306906-2009. 47/09.



Permalink

Open invitation to tender, deadline 30.06.2010, for design and equipment of the 1.8 km-long Line 1 metro extension from Sesto FS to Monza in Milan. Contract value EUR 89,711,702 excluding VAT, duration 1,460 days. Time limit for receipt of requests for documents or for accessing documents 18.06.2010. Contact Metropolitana milanese SpA, att.n Direzione appalti e contratti, Milan, tel +39 (0)2 77471, fax +39 (0)2 780033, e-mail dac@metropolitanamilanese.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130057-2010. 19/10.



Permalink

SIFEL SpA at Spigno Monferrato (AL) secured the EUR1.7 million contract, VAT not included, for overhead line construction in the M1 and M2 tunnels at Milan. Bid Code n. 486.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=326389-2010. 45/10.



Permalink

On 02.02.2011 Metro 5 SpA, the concessionaire led by Astaldi, and including Ansaldo STS, Ansaldo Breda, Azienda Trasporti Municipalizzata (ATM) of Milan and Alstom signed its contract with the city of Milan for the extension Garibaldi station - San Siro Stadium (7 km with 10 new stations) of driverless automatic Line 5 of the metro, for a total value of EUR872 million. Four TBMs will be used. End of construction is scheduled to coincide with Expo 2015. Metro SpA will manage the new metro secton for 25 years and 7 months. For more click here and it/16. Visit www.metro-5.com. 06/11.



Permalink

The JV Coestra/Bonciani/ACMAR di Firenze secured the EUR61.05 million contract, VAT not included, for design and equipment of the 1.8 km-long Line 1 metro extension from Sesto FS to Monza in Milan. Contract duration 1,460 days. Contact Metropolitana milanese SpA, att.n Direzione appalti e contratti, Milan, tel +39 (0)2 77471, fax +39 (0)2 780033, e-mail dac@metropolitanamilanese.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=059598-2011. 09/11.



Permalink

Notice of qualification system for suppliers for waterproofing work in tunnels and stations of the Milan metro lines 1, 2 and 3, classified in three amount groups: to EUR5 million; to EUR10 million; and to EUR15 million, excluding VAT. Further information, specs and docs from ATM SpA, Direzione logistica, Milan, tel +39 02 48038301, fax +39 02 6887778, website www.atm-mi.it. Bid Code n.524. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=099270-2011. 14/11.



Permalink

The ATI comprising Impregilo (leader), with Astaldi, Ansaldo STS, Ansaldo Breda, ATM and Sirti has been provisionally awarded the tender to select a private partner for Public Private Partnership for the concession for engineering, construction and operation of the proposed Milan metro blue line 4. The 15.2 km line from Linate to San Cristoforo Fs will be driverless and fully automated. The project covers detailed and executive design and construction of two single-track tunnels with 21 stations and a workshop depot. The overall value of the investment is approximately EUR1.7 billion, two thirds of which will be provided by the Italian State and Milan City Council. Impregilo and Astaldi will be responsible for the civil works, value EUR870 million. The concession is for 30 years, with 6.5 years for engineering and construction works and 23.5 years for the operating phase. The project envisages total operating revenues of approximately EUR2.7 billion from 86 million passengers/year, guaranteed by Milan City Council. Impregilo and Astaldi have a 9.6 percent participation in the concession project. 22/11.



Permalink

Notice of the existence of a qualification system with licitation, 3 years duration, for list of qualified companies for maintenance of fire fighting equipment and for adaptation to UNI laws of existing fire fighting equipment in tunnels and stations of metro lines. Bid Code n. 541. Contact ATM SpA, Direzione acquisti, Milan, tel +39 0248038218, fax +39 026887778. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=261446-2011. 38/11.



Permalink

Open invitation to tender, deadline 07.05.2013, for the maintenance of fire protection systems installed at metro stations, car parks, depots, and offices. Contract value EUR7.93 million, excluding VAT, duration 48 months after award. Time limit for access to documents 29.04.2013. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=102706-2013. Bid Code n. 607. 14/13.



Permalink

Mosconi of Edolo (BS) secured the EUR1.54 million contract, excluding VAT, for waterproofing work in tunnels and stations of the Milan metro lines 1, 2 and 3. Contact ATM SpA, Milan, tel +39 02 480311. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=175058-2013. Bid Code n. 580. 23/13.

 



Permalink


Open invitation to tender, deadline 07.01.2016, for maintenance of electrical systems in some sections of Metro Line 1 in Milan. Value of the contract is EUR4.95 million, excluding VAT. The duration of the contract will be 420 days from award. Contact  ATM SpA, att.n Valeria Banfi, Milan, tel +39 0248038312, fax +39 026887778, e-mail valeria.banfi@atm.it.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=401759-2015. Ref.n. 738. 47/15.




Permalink


Sifel SpA at Spigno Monferrato (AL) secured the EUR 2.41 million contract, excluding VAT, for the maintenance of electrical systems on sections of the Metro Line 1 in Milan. Contact  ATM SpA, Milano, tel +39 02480311, e-mail responsabileacquisti@atm.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=176290-2016. Ref.n. 738. 21/16.




Permalink

Open invitation to tender, deadline 03.08.2017, for the monitoring of water resources during the phase III of the Brenner Base Tunnel. The Phase III includes the construction of the main tunnels and the remaining sections of the exploratory tunnels leading the main tubes. Time limit for receipt of requests for documents or for accessing documents: 02.08.2017.

Contract duration 93 months from award, estimated value EUR10.70 million, excluding VAT. Contact Brenner Basis Tunnel BBT SE, attn Avv. Arturo Piero Mazzucato, Bolzano, tel +39 0471 062210, fax 39 0471 062211, email ava@bbtse.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=246436-2017.

Ref.n. AP268. 26/17.



Permalink

Open invitation to tender, deadline 10.04.2018, for ordinary maintenance of metro superstructures. Value of the contract is EUR2.40 million, excluding VAT. The duration of the contract will be 30 months. Contact ATM SpA, Milan, tel , tel  +39 0248038301, fax +39 026887778, email valeria.banfi@atm.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=101725-2018.Ref.n. 854. 10/18.



Permalink

Open invitation to tender, deadline 25.09.2018, for the refurbishment works in the tunnel between Piola and Lambrate stations, on the Milan Metro Line 2. Value of the contract is EUR11.28 million, excluding VAT. The duration of the contract will be 698 months. Contact ATM SpA, Milan, tel  +39 02 4803811, email responsabileacquisti@atm.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=391310-2018 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=311613-2018.

Ref.n. 888. 37/18.



Permalink

Palingeo Srl (Carpenedolo,BS)/Consorzio italiano costruzioni, manutenzioni e servizi società cooperativa (Bologna) secured the EUR8.03 million contract, excluding VAT, for the refurbishment works in the tunnel between Piola and Lambrate stations, on the Milan Metro Line 2. Contact ATM SpA, Milan, tel  +39 02 4803811, email responsabileacquisti@atm.it. Click here  for bid docs. Ref.n. 888. 05/19.



Permalink

The JV G.C.F. SpA (Rome)/Uniferr Srl (Reggio Emilia) secured the EUR2.22 million contract, excluding VAT, for ordinary maintenance of metro superstructures. Contact ATM SpA, Milan tel  +39 02480311, email responsabileacquisti@atm.it. Click here for more Ref.n. 854. 05/19.



Permalink

Restricted invitation to tender, deadline 06/09/2019, for the supply, installation and commissioning of the M1 line presence/absence voltage signalling devices (750 Vcc) and for checking the grounding of the third and fourth track  in the tunnel sections near to the station platforms and along the entire Milan M1 subway line. Value of the contract is EUR839,365.86, excluding VAT. The duration of the contract will be 267 days from award. Further information from ATM SpA, att.n Valeria Banfi, Milan, tel +39 0248038301, fax +39 026887778, email valeria.banfi@atm.it.For bid documents click here Ref.n. 3700000000. 31/19.



Permalink

Open invitation to tender, deadline 18/11/2019, for the facility management service for buildings, stations, tunnels, depots, parking and rolling stock in the Milan M1, M2, M3 and M5 subways. Value of the contract is EUR 144 989 630.00 excluding VAT. The duration of the contract will be 36 months. Further information from ATM SpA, Milan, tel +39 0248038313, fax +39 026887778, email andrea.virgilio@atm.it. For bid documents click here .

Ref.n. 3600000039. 38/19.



Permalink

Colas Rail Italia SpA from Milano secured the EUR820 206.47 contract, excluding VAT,  for the supply, installation and commissioning of the M1 line presence/absence voltage signalling devices (750 Vcc). And for checking the grounding of the third and fourth track  in the tunnel sections near to the station platforms and along the entire Milan M1 subway line. Further information from ATM SpA, Milan, tel +39 02480311, email responsabileacquisti@atm.it. For tender information please click here.  Ref.n. 3700000001. 11/20



Permalink


Open invitation to tender, deadline 22/10/2020, for work on track system of Metro Line 2 in Milan. Value of the contract is EUR33.77 million, excluding VAT. Contact  ATM SpA, Milan, tel  +39 0248038301, fax +39 026887778, email valeria.banfi@atm.it. Click here for more information. Ref.n. 3600000081. 37/20. 

  




Permalink


The contract for the open invitation to tender, deadline 22/10/2020, for work on track system of Metro Line 2 in Milan was not awarded. Value of the contract is EUR33.77 million, excluding VAT. Contact  ATM SpA, Milan, tel  +39 0248038301, fax +39 026887778, email valeria.banfi@atm.it. Click here for more information. Ref.n. 3600000081. 44/20.

 




Permalink


Open invitation to tender, deadline 27/04/2021, for work on track system of Metro Line 2 in Milan. Value of the contract is EUR 37.36 million, excluding VAT. Duration of the contract is 2530 days. Contact  ATM SpA, Milan, tel  +39 0248038301, fax +39 026887778, email valeria.banfi@atm.it. Click here for more information. Ref.n. 3600000097. 12/21.  



Permalink


The contracts for the 3 lots for the facility management services for buildings, stations, tunnels, depots, parking and rolling stock for the Milan M1, M2, M3 and M5 subways, have been awarded: 

  • Lot 1: RTI MIORELLI SERVICE SPA (Trento), B&B SERVICE SOC. COOP. (Pietrasanta), TEPOR SPA (Cagliari), value contract EUR42.92 million, excluding VAT;
  • Lot 2:  RTI LA LUCENTE SPA (Modugno), VIVALDI & CARDINO SPA (Milan), ALFREDO CECCHINI SRL (Rome), value contract EUR36,33 million, excluding VAT;
  • Lot 3: CONSORZIO STABILE CMF (Trento), value contract EUR44,92 million, excluding VAT. 

Contact ATM SpA, Milan, tel +39 02480311, email responsabileacquisti@atm.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120829-2022. Ref.n. 3600000039. 11/22.



Permalink

Open invitation to tender, deadline 29/04/2022, for cleaning services for the metro M1, M2, M3, M4 and M5 underground lines in Milan. Click here where tenders must be sent. Value of the contract is EUR7.83 million, excluding VAT. Duration of the contract will be 36 months. Contact Azienda Trasporti Milanesi SpA, Milan, tel +39 0248037430, email  andrea.virgilio@atm.it. Visit https://www.atm.it/it/ImpreseEFornitori/BandiGara/Pagine/3600000131.aspx.  Ref.n. o 3600000131. 13/22

 



Permalink


Open invitation to tender, deadline 26/05/2023, for fire-fighting adaptation interventions pursuant to Ministerial Decree 10.21.2015 of the water systems installed in the stations and tunnels of the M1 and M2 metro lines in Milan. Click here where tenders must be sent. Value of the contract is EUR12.11 million, excluding VAT. Contact Azienda Trasporti Milanesi SpA, attn Valeria Banfi, Milan, tel +39 0248037431, email  valeria.banfi@atm.it. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=164056-2023.  Ref.n. 3600000172. 11/23. 

 




Permalink


ELETECNO ST SpA from Robbiate (LC) have secured the EUR 4.58 million contract, excluding VAT, for fire-fighting adaptation interventions pursuant to the Ministerial Decree 10.21.2015 of the water systems installed in the stations and tunnels of the M1 metro line (Lot 1) in Milan. Contact Azienda Trasporti Milanesi SpA, Milan, tel +39 02480311, email  responsabileacquisti@atm.it. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=644008-2023.  Ref.n. 3600000172. 43/23. 



Permalink


ELETECNO ST SpA from Robbiate (LC) secured the EUR 2.43 million contract, excluding VAT, for fire-fighting adaptation interventions pursuant to the Ministerial Decree 10.21.2015 of the water systems installed in the stations and tunnels of the M2 metro line (Lot 2) in Milan. Contact Azienda Trasporti Milanesi SpA, Milan, tel +39 02480311, email  responsabileacquisti@atm.it. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=645980-2023.  Ref.n. 3600000172. 43/23. 



Permalink