Colas Rail Italia SpA from Milano secured the EUR820 206.47 contract, excluding VAT, for the supply, installation and commissioning of the M1 line presence/absence voltage signalling devices (750 Vcc). And for checking the grounding of the third and fourth track in the tunnel sections near to the station platforms and along the entire Milan M1 subway line. Further information from ATM SpA, Milan, tel +39 02480311, email responsabileacquisti@atm.it. For tender information please click here. Ref.n. 3700000001. 11/20