The Tuneles Lleida Joint Venture composed of Fulcrum, Planificacio, Analisis y Proyecto SAU and Tuneles Geomecanica SL secured the EUR1.85 million contract, excluding VAT, for adaptation of 6 tunnels, 16 overpasses, and the catenary of the Zaragoza–Tarragona railway line via Lleida to adapt them to the dimensions of the P-400 semi-trailers. Contact Adif, Madrid, tel +34 913007661, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/285112-2025.
Ref.n. 3.24/27507.0123. 18/25.
More Information
Budimex S.A. from Warsaw secured the contract for the securing and maintaining of the Retkinia chamber construction Site as part of the construction of a long-distance tunnel in Łodz along railway line n. 85 together with its connection to railway line n. 14. The Retkinia chamber will be used as the TBM launch shaft. Contact Centralny Port Komunikacyjny sp. z o.o., Warsaw, tel +48 539 188 116, email zamowienia@cpk.pl. Visit https://ted.europa.eu/en/notice/-/detail/285112-2025. Ref.n. FZA.2510.1.2025/RP/4. 18/25.
Lombardi Ingenierie from Lyon have secured the EUR 300,000 contract, excluding VAT, for assistance to Sytral in relation to environmental aspects for the construction of the West Lyon Express Tramway or TEOL. The line will be 6.5 - 7 km long, including 3-4 km of tunnel. Contact Sytral Mobilites, attn Bruno Bernard, Lyon, tel +33 472845800, fax +33 478531284, email unitemarches@sytral.fr. Visit https://ted.europa.eu/en/notice/-/detail/284249-2025. Ref.n. 24M0119. 18/25
IB Schiessl Gehlen Sodeikat GmbH from Munich, IGS INGENIEURE GmbH & Co. KG from Weimar, Kiwa GmbH from Gersthofen and WTM ENGINEERS Munchen GmbH from Munich secured the contract for ultrasonic detection of hollows in the roof area of tunnels constructed using the NATM method between subway stations in Munich. Contact Stadtwerke Munchen GmbH, attn Gregor Holzapfel, Munich, tel +49 89 2361-2643, email Holzapfel.Gregor@swm.de. Visit https://ted.europa.eu/en/notice/-/detail/232394-2025. Ref.n. SV-JWA-240913-002. 17/25.
Elimaen Huoltopalvelu Ky from Elimaki secured the EUR 1.08 million contract for maintenance of tunnel structures and track auxiliary works (Lot 1); Konepalvelu Erkco Oy from Kouvola secured the EUR 748,800 contract for telehandler service with rail wheels (lot 2) for the Helsinki metro line and public transport in Helsinki-Uusimaa region. Contact Paakaupunkiseudun Kaupunkiliikenne Oy and/or Lansimetro Oy and/or Helsingin kaupungin liikenneliikelaitos and/or Helsingin kaupungin liikenneliikelaitos, tel +358 294444200, email kilpailutus@hansel.fi. Visit https://ted.europa.eu/en/notice/-/detail/231967-2025. Ref.n. 509116. 17/25.
DE - Nexans Suisse SA from Cortaillod secured the EUR 53.13 million (CHF49.91 million) contract for the manufacture, supply and installation of HV cables in the technical gallery (WELK)of the Gotthard motorway tunnel on the N2. Contact Swissgrid AG - Asset & Maintenance, Aarau, tel +41585802111, email ausschreibungen-MechanicalEquipment@swissgrid.ch. Visit https://ted.europa.eu/en/notice/-/detail/229458-2025. 17/25.
Page:
06.01.2026 France
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
20.01.2026 Romania
23.01.2026 Switzerland
26.01.2026 Italy
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.