WSP Sverige AB from Stockholm-Globen secured EUR7.78 million (SEK90 million) contract, excluding VAT, for the preparation of consultation documents and consultation documents, for the selection of Maria-Helsingborg double track extension location alternatives in Helsingborg Municipality. : The stretch between Maria station and Helsingborg C is a 4.5km long single-track railway that goes through a tunnel. In the early 1990s, it was decided that the West Coast Railway's long-term standard should be double-track. When Angelholm-Maria and Varbergstunnel are completed, only the Maria-Helsingborg section does not meet this requirement. Contact Trafikverket Myndighet, attn Malin Isaksson, Borlange, tel +46-70-724 52 48, email malin.isaksson@trafikverket.se. Visit https://ted.europa.eu/en/notice/-/detail/697499-2024. Ref.n. KOM-413177. 46/24.