Part of Betuwe line (see nl/11). Tubecon consortium will start construction in April, 2000 using Herrenknecht 10 m-diameter EPB for 2 x 4 km bores in clays and peaty layers. Overall length of tunnel 8 km to include 2 km-long cut-and-cover sections at each end. Slightly heavier segments than elsewhere on Betuwe line, but 8.65 m inside diameter similar to Botlek to accommodate stacked container traffic. Visit www.herrenknecht.com February 2000.