Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Netherlands

Netherlands, Amsterdam - nl/23

Highway

Preinformation procedure for design, build, finance and maintenance contract under a 30-year concession and PPP project for the second Coen tunnel (6 years for design and building and 24 years for maintenance) under the North Sea canal on Amsterdam's orbital highway A10. The project also contains renovation and maintenance of the first tunnel (587 m). The new tunnel will add two new tubes to the existing twin-tube tunnel. A project presentation will be held on 30th June, 2005 at the Sheraton Amsterdam Airport Hotel and Conference Centre, tel. +31 203164300 or visit www.sheraton.nl. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=114564-2005, OJ S 116, or contact Ministry of transport, public works and water management, Zwanenburg, tel. +31 235557264. E-mail m.e.werdmuller-djong@dnh.rws.minvenw.nl 25/05.Restricted call for tenders, deadline 15th September, 2005 for design, build, finance and maintenance contract under a 30-year concession and PPP project for the second Coen tunnel under the North Sea canal on Amsterdam's orbital highway A10. The project also contains renovation and maintenance of the first tunnel (587 m). The new tunnel will add two new tubes to the existing twin-tube tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=141447-2005, OJ S 142, or contact Ministry for transport, public works and water management, Haarlem, tel. +31 235557200. E-mail tender@coentunneltrace.nl 31-32/05.The Coentunnel Company BV consortium, led by Dura Vermeer and made up of VINCI Concessions, VINCI Construction's subsidiaries CFE and Dredging International, Besix, TBI and Arcadis has just been named preferred bidder for the Coen tunnel in Amsterdam. The project, with a total value of approximately EUR500 million, covers the financing, design and construction of a twin-tube immersed road tunnel (3+2 lane) as well as renovation of the existing 590 m twin-tube tunnel and operation of both tunnels for a period of 30 years. The works, which will take five years to complete, will be carried out by a consortium made up of VINCI's subsidiaries VINCI Construction Grands Projets, CFE and DEME, as well as TBI, Dura Vermeer and Besix. The Coen tunnel connects the city centre with northern Netherlands. Visit www.duravermeerinfra.nl, www.vinci.com, www.cfe.be, www.dredging.com, www.deme.be, www.besix.com, www.tbi.nl and www.arcadis.nl 30/07.The Coentunnel Company BV consortium, formed by VINCI Concessions and VINCI Construction's subsidiaries CFE and Dredging International, together with Dura Vermeer, Arcadis, Besix and TBI, signed on 22nd April, 2008 the concession contract for the Coen tunnel in Amsterdam with the Dutch Minister for Water and Public Works. The project, worth over EUR595 million in total, calls for the financing, design and construction of an immersed, 8-lane road tunnel, refurbishment of the existing 600 m tunnel and maintenance of both tunnels for a period of 30 years. The concessionaire will receive an income in the form of an annual payment paid by the concession-awarding authority. The amount will depend on the actual availability of the tunnel infrastructure to users, which connect the centre of Amsterdam with the northern part of the Netherlands. The works will last five years and will be carried out by a consortium made up of VINCI Construction Grands Projets and VINCI Construction's subsidiaries CFE and DEME, along with TBI, Dura Vermeer and Besix. Visit www.vinci.com, www.cfe.be, www.dredging.com, www.duravermeerinfra.nl, www.arcadis.nl, www.besix.com, www.tbi.nl and www.deme.be 18/08.



Permalink