Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Netherlands

Netherlands, Flevoland - nl/22

High Speed Railway

Negotiated procedure, deadline 17th March, 2005 for design and build contract of a tunnel under Drontermeer Lake, as part of the Hanze line from Lelystad in Flevoland to Zwolle via Dronten and Kampen. The contract consists of about 4 km of line, of which the tunnel is approximately 1.3 km in length, whereof 800 m is bored. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=027376-2005, OJ S 28, or contact ProRail, Utrecht, fax +31 302356341. E-mail aki@prorail.nl and visit www.aanbesteden.prorail.nl 07/05.Negotiated procedure, deadline 29th August, 2005 for engineering and installation of technical equipment for a 1.3 km tunnel, whereof 800 m bored under Drontermeer, as part of the 4 km Hanze line from Lelystad in Flevoland to Zwolle via Dronten and Kampen. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=128055-2005, OJ S 129, or contact ProRail, Utrecht, fax +31 302356341. E-mail aki@prorail.nl 28/05.



Permalink