Negotiated procedure, deadline 5th June, 2006 for design and build contract to replace a railway viaduct in Delft by a 1.8 km tunnel and an underground station. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=090301-2006, OJ S 85, or contact ProRail, Utrecht, fax +31 302356341. E-mail aki@prorail.nl 20/06.Belgian building company CFE and its partners Dura Vermeer and Haverkort Voormolen TBI Infra have won a contract from ProRail for the first phase of a project to build a rail tunnel in the Dutch city of Delft. CFE has a one-third stake in the Combinatie Cromme Lijn (CCL) joint venture. The "spoorzone Delft" (rail zone Delft) project, valued at EUR354 million, consists of the design and construction of a 2,300 m-long cut-and-cover tunnel for two and in the future four tracks, including a new railway station, a public transport junction and an underground car park for 650 vehicles. The joint venture will start preparatory work in August in order to begin construction in the second half of 2009. The station and the first two tracks should be operational by 2013. Visit www.cfe.be, www.duravermeer.nl, www.haverkortvoormolen.nl and www.gemeentedelft.info/spoorzone 31/08.