Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Switzerland

Switzerland, Lausanne - ch/36

Metro

$100 million new line with 14 stations to be built for Vaud Canton between Ouchy in the south and Epalinges in the north will be 6 km long with 1.8 km in single 7.5 m-diameter tunnel excavated by roadheader in molasse and moraine with sprayed concrete support. Restricted invitations to tender closed 7th July, 2000 with a view to starting construction early-2002 for commissioning 2005. Contact Service des Routes, tel +41 213 167069. Alstom will supply $25 million fully-automated, driverless train control system and $50 million 15 two-car, rubber-tyred train sets. Visit www.alstom.com July 2000. The Swiss Confederation is to grant Sfr70 million until 2007 to finance the 6 km extension of Line 2, known as Métro-Ouchy, between the central station and Croisettes in Epalinges in the northeast thus reducing the financial burden of the Vaud Canton to Sfr305 million. At least 70% of the alignment will be underground. There will be 14 stations on an average gradient of 5.7%. The overall budget totals Sfr590 million. Visit http://www.dinf.vd.ch/target/body/gp_transport/doss_avenir/b_dav_metro_ne.html 09/02.Preparatory work has started on Line 2. Contracts 1100 and 1200 will be built by a consortium formed by Deneriaz, Zschokke Locher, Grisoni Zaugg, and Walo Bertschinger. Contract 1100 includes two tunnels (238 m and 246 m), a 28 m-long cut-and-cover stretch and a 77 m-long station. Contract 1200 encompasses two tunnels (306 m and 265 m), two cut-and-cover portions (41 m and 12 m) and one 33 m-long station. Visit www.deneriaz.chContract 1300 has been secured by Losinger and Frutiger. It includes a 136 m tunnel. Contract 1400 goes to Losinger. It requires two tunnels (63 m and 486 m), a 161 m cut-and-cover tunnel and a 33 m-long station. Visit www.losinger.chJPF Construction, Induni, Evequoz and Getra secured contract 1500 which includes a 503 m tunnel, a 69 m cut-and-cover tunnel and a 58 m-long station.Contract 1700 will be constructed by Marti Tunnelbau and Batigroup. It includes a 665 m tunnel, a 41 m cut-and-cover stretch and a 33 m-long station. Visit www.martiag.chContract 1900 includes a 452 m tunnel, a 72 m cut-and-cover portion and a 100 m-long station. It will be built by Infra Tunnel and Bernasconi. Visit www.infratunnel.chContract 2000, awarded to Batigroup, Marti Travaux, Perrin Frères and Bertholet & Mathis, includes a 30 m cut-and-cover stretch. Visit www.batigroup.comContract 2100 has been awarded to JPF Construction and includes a 68 m cut-and-cover portion. Also visit www.t-l.ch 22/04.



Permalink

Open invitation to tender, deadline 22.12.2016, for engineering services for underground equipment (EQUI) for the m2-m3 metro lines in Lausanne. Further information from http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=930051. Contact Techdata SA, att.n Etienne Rass, Epalinges. Tenders to be sent to DGMR, Lausanne. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=363306-2016. Ref.n. MP 2016.05.232. 42/16



Permalink

Open invitation to tender, deadline 20.09.2019, for the design, tender and construction of the M3 Lausanne metro line section, from Lausanne-Flon to Blecherette, including 3 km in tunnel and 5 underground stations. The bid is composed of 5 lots: Lausanne-Gare and Lausanne-Flon stations (Lot 1); the tunnel from Lausanne-Flon to Beaulieu and the Chauderon station (Lot 2); the tunnel from Beaulieu to Plaines-du-Loup and the Beaulieu and Casernes stations (Lot 3); the tunnel from Plaines-du-Loup to Blecherette and the Plaines-du-Loup and Blecherette stations (Lot 4); a maintenance building at Blecherette (Lot 5). Duration contract from 01/01/2020 to 31/12/2027. For further information http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1085665. Contact Direction générale de la mobilité et des routes DGMR direction des metros, Lausanne, email metro-m3@vd.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=320785-2019.

Bid Code n. FLO-BLE - AR/GC. 28/19.



Permalink

Switzerland, Sörenberg - ch/35

Gas pipeline

  Joint venture of Ilbau, Cogeis and Scheifele taking delivery of 4.5 m-diameter Herrenknecht shielded hardrock TBM for 5.2 km gas pipeline tunnel through marl and disturbed sandstones, siltstones and mudstones erecting six-piece 3.8 m i.d. dowelled and gasketed precast concrete segmental lining in rings 1.5 m-wide and 250 cm thick. Possibility of gas in sedimentary deposits. Boring to commence July on 15-month schedule. Visit www.herrenknecht.com May 2000.5.3 km extension of gas pipeline between Belgium and Italy in Canton Lucerne awarded to jv with Ilbau as technical leader, value $30 million. Rockmore will supply drilling consumables from its Austrian plant. Visit www.strabag.at and www.rockmore-intl.com October 2000. Consortium of Strabag, Cogeis, Specogna and Scheifele using 4.56 m-diameter Herrenknecht hardrock TBM with trunk conveyor belt on 5.2 km segmentally-lined tube at 5 % gradient in Sörenberg mélange, flysch and globigerina marl. TBM, which has automatic power cut-off if gas is detected, launched August, 2000 on ten month run. 2.2 km completed by end-November. Best week 200 m; best day 38 m in 18 h. Unique compact 26 m-high belt storage tower with 300 m capacity. Visit www.strabag.at and www.herrenknecht.de 02/01.4.56 m-diameter Herrenknecht hardrock TBM averaging 18 m/day working 24/7 with 18 h/day operating, peaking at 36 m/day. Around 4 km of 5.2 km drive completed, all at 5% upgrade. Up to 150 m/week being maintained in Sorenberg melange. Lining with rings of six tapered, gasketed segments 1.5 m wide and 250 mm thick, with internal diameter 3.8 m. TBM ahead of schedule, with completion expected May, 2001. Visit www.strabag.com and www.herrenknecht.com 14/01.



Permalink

Switzerland, Bern - ch/34

Highway

Open tendering underway for the 300,000 cu m Moutier road tunnel, deadline 31st August, 2000. Apply to the National Highways Office, Roads and Bridges, Canton of Bern, Reiterstrasse 11, 3011 Bern, Switzerland, fax +41 31 3856117. May 2000.



Permalink

Open invitation to tender, deadline 27.01.2010, for axial and jet fans in the tunnels Moutier (1,191 m, 1,172 m) and Graitery (2,462 m) on A16 between Roches and Court, Lot EM 5.1. Contract duration 01.03.2010 – 26.10.2012. Time limit for receipt of requests for documents or for accessing documents: 18.11.2009. Contact M. Viktor Ruch, Office des ponts et chaussées del Bern canton, Section construction national roads, Bern, tel +41 316333543, fax +41 316333580, e-mail viktor.ruch@bve.be.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=308012-2009. 47/09.



Permalink

Open invitation to tender, deadline 11.05.2010, for video surveillance and detection of events systems for the tunnels of Moutier (1,191 m/1,172 m) and Graitery (2,462 m) on A16 between Roches and Court. Time limit for receipt of requests for documents or for accessing documents: 08.03.2010. Contract duration: 01.09.2010 - 31.01.2012. Contact Mr Viktor Ruch, Bridge and roads office, national roads section, Canton Bern, Bern, tel +41 3163335-43, fax -80, e-mail viktor.ruch@bve.be.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=045072-2010. 07/10.



Permalink

Open invitation to tender, deadline 02.07.2010, for painting in the tunnels of Moutier (1,191 m/1,172 m) on A16 between Roches and Court. Time limit for receipt of requests for documents or for accessing documents: 16.06.2010. Contact M. Alain Koenig, bridge and roads office, national roads section, Bern, tel +41 3163335-11, fax -80, e-mail alain.koenig@bve.be.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161610-2010. 23/10.Open invitation to tender, deadline 02.07.2010, for SOS doors in the tunnels of Moutier (1,191 m/1,172 m) on A16 between Roches and Court. Time limit for receipt of requests for documents or for accessing documents: 16.06.2010. Contact M. Alain Koenig, Bridge and roads office, national roads section, Bern, tel +41 3163335-11, fax -80, e-mail alain.koenig@bve.be.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161611-2010. 23/10.



Permalink

Switzerland, Tscharner - ch/33

Material Transport

Herrenknecht 9.53 m-diameter TBM equipped with two rockbolting drills ordered by Marti AG for 2.5 km drive at Vigier cement plant commencing in Spring, 2000. Details from www.herrenknecht.com April 2000.



Permalink

Switzerland, Zurich - ch/32

Airport Service

  Wayss and Freytag reports on projects at Kloten airport using its 6.2 m-diameter Herrenknecht EPB in sand, silt, moraine and coarse gravel to install 6 m o.d. x 5.4 m i.d. segmental lining in 490 m-long baggage service tunnel and 1.784 km pedestrian passenger tunnel. Visit www.wayss-freytag.de April 2000. Award of two tunnels to link proposed midfield dock to main terminal: rail passenger transport tunnel 970 m x internal diameter 5.4 m is being constructed by consortium of Zschokke, Locher, Prader, Wayss u Freytag, and Walo Bertschinger using Herrenknecht Mixshield. Visit www.amberg.ch; and three compartment road tunnel, 2 x 667 m x 54 sq m for traffic plus 1 x 38 sq m for baggage, to be built by cut-and-cover beneath airport runway. Completion November, 2002 at total cost of $120 million. December 2000.



Permalink

Switzerland, Oenzberg - ch/31

Railway

Award of 3 km-long tunnel to be constructed by TBM by consortium of Zschokke-Locher/Prader/Murer/CSC/Wayss & Freytag. Visit www.wayss-freytag.de March 2000.   Preconstruction work underway of $60 million, 3.161 km-long x 10.85 m-diameter single tube in molasse and moraine while awaiting delivery of Herrenknecht TBM ex-Thalwil scheduled March, 2001. Completion 2002 for opening of 45 km-long Mattstetten-Rotthrist section end-2004. Visit www.wayssfreytag.de and www.herrenknecht.de December 2000.  The 3,160 m-long Oenzberg tunnel has been holed through on 14th February, 2003 on the Mattstetten-Rothrist section of the Bern-Olten high speed railway in Switzerland. The contracting JV formed by Zschokke-Locher, Prader, Murer, CSC and Wayss & Freytag used a Herrenknecht mixshield TBM equipped with a 12.36 m-diameter cutting head. Tunnelling lasted 17 months. Visit www.herrenknecht.com. Read E-News Weekly # 52. 09/03.



Permalink

Switzerland, Jura - ch/30

Highway

Theiler & Kalbermatten boring 3.5 km pilot using refurbished Robbins TBM. May 1998.3.1 km x 3.5 m-diameter pilot bore due to get underway early-2000 using hardrock TBM in limestone and marls. Contracting jv comprising Batigroup, Frutiger and Infra 2000, value $9 million. Sept 1999. 4 km of single 75 sq m tubes commencing February, 2000 for tunnels de la Perche and du Banne using Tamrock Titan 3-boom Superdrilling jumbo by jv of Rothpletz & Lienhard, Walo Bertschinger, Courbat and Doyon. Second Tamrock machine employed on rockbolting. More from www.ulrich-ammann.ch November 1999.Open call for tenders, deadline 30th September, 2005 for construction of the 2 x 750 m-long 3.6 m-diameter pilot tunnel of the Neu-Bois tunnel on the A16. A TBM will be used to excavate through limestone. Support with welded wire fabric, anchors, steel arches and plates. This ground investigation bore will then be enlarged by a roadheader machine to build the future tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=111507-2005, OJ S 112, or contact Republique et Canton du Jura, Delemont, fax +41 324207301. Visit www.a16.ch. Subscribe to E-News Weekly 16/2005, 13/2004 & 35/2002. 25/05.Open call for tenders, deadline 28th October, 2005 for ground exploration gallery for the Choindez tunnel on section 8 of the trans-Jura motorway A16. Length to be built with traditional method is 605 m, section 15.4 sq m. Length to be driven by a TBM is 2,395 m, excavated diameter 3.6 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=132118-2005, OJ S 133, or contact Republique et Canton du Jura, Delemont, fax +41 324207301. 29/05.Open call for bids, deadline 27th June, 2006 for construction of the 2,901 m-long Bure tunnel (contract 2.602) on section 2 Boncourt-Porrentruy west of the A16 highway, cut-and-cover portals (94 m), 10 cross passages, niches, three vertical shafts, a ventilation station, etc. A pilot tunnel has already been bored. Read E-News Weekly 41/2005, 16/2005, 34/2004, 13/2004, 32/2006 & 35/2002. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=051678-2006, OJ S 49, or contact Republique et Canton du Jura, Delemont. 12/06.PraderLosinger has launched tunnelling of the Choindez ground exploratory tunnel on section 8 of motorway A16. The first 625 metres will be built using a roadheader, cross section of 15.4 sq m, while the remaining 2,400 metres will be dug by means of a TBM, outer diameter of 3.6 m.The works freshly commenced will allow to know more precisely the geological, hydrological and geotechnical nature of the bedrock through which the main tunnel will run in a few years. The exploratory tunnel has a total length of 3,024 metres for a 3.6 m diameter and will be excavated from its north portal towards Vicques until its south portal. This work phase will end in June 2008. The contract amounts to CHF16.5 million. Then, this pilot bore will be used in particular for ventilation and water drainage during construction of the main tunnel. In the end, it will be used as a safety tunnel. The final design of the Choindez main tunnel, to be driven at about 40 metres east and parallel to the exploratory bore, will be finalised by end 2007. The engineering contract has yet to be awarded.The ground investigation tunnel will be bored using traditional means, i.e. a roadheader on the first 625 metres and a 3.6 m-diameter TBM on the remaining 2,400 metres. A separate bidding process to build the main tunnel will be launched in 2008 or early 2009. The tunnel will be a single bored two-way tunnel. The diameter and exact cross section will be defined later. From north to south, the geology will be Alsacian molasse (625 metres) and Jurassic limestone (2,400 metres). Visit www.praderlosinger.ch 44/06.Construction of the 2 x 750 m Neu-Bois exploratory tunnel has been awarded to a JV of Infra Tunnel (leader), Implenia, LGV Impresa Construzioni, G. Comte, Les Fils de Marc Joliat, R. Seuret, S. Facchinetti and G. Chetelat. The contract amounts to CHF56.9 million. Tunnelling will proceed as follows: construction of a pilot bore by means of a 3.6 m-diameter TBM designed to allow for probe drilling during tunnelling; enlargement of each pilot bore to the final cross section using a roadheader; and building of cross passages by drilling and blasting. Visit www.infratunnel.ch, www.implenia.com and www.a16.ch 44/06.PraderLosinger will use a Voest Alpine ATM 50 roadheader for the first 625 metres of the 3.6 m-diameter Choindez ground exploratory tunnel on section 8 of motorway A16 and a Herrenknecht TBM (machine S-96), belonging to the company, for the remaining 2.4 km. For both methods, Belloli anchors and Bruno Fratelli steel arches. Concrete to be supplied by Sabag. Mucking-out by two 7.5 cu m GHH MK-A15 dump trucks at the roadheader section. Mucking-out for the TBM section will be undertaken by a muck train. The process is still under study. Construction of the roadheader section commenced on 1st September, 2006 and will end on 30th June, 2007. The TBM section will start afterwards from 1st July, 2007 to 30th June, 2008. Click ch/30. Visit www.miningandconstruction.sandvik.com, www.herrenknecht.com, www.belloli.ch, www.belloli-italia.com, www.brunofratelli.com, www.matsabag.ch and www.ghh-fahrzeuge.de 46/06.Work at the Graitery tunnel on the N16, between Roches and Court, began on 6th November. The construction contract of the Graitery tunnel has recently been awarded to GTG (Groupement du Tunnel de Graitery), a consortium led by Marti Tunnelbau and including Parietti et Gindrat, Marti Travaux Spéciaux and Pro Routes. This is a 2,462 m-long two-way tunnel. The alignment runs along the pilot tunnel already built, which will serve as escape tunnel when the main tunnel is in service. The 7.5 m-wide roadway is bordered by two pavements. A ventilation duct in the tunnel crown will extract contaminated air, or smokes in case of fire, from a ventilation plant built at the north portal. The tunnel crosses several calcareous and marly layers. The limestone, about 48% of the volume, will be excavated using drilling and blasting, then crushed. It will be reused at different worksites of the N16. The marls will be excavated using a roadheader. They will not be recycled but trucked to the final disposal site in Chaluet. Preliminary works, awarded to local companies, have already been performed at the two portals since fall 2005. Tunnelling itself will commence with the construction of the access trench to the north portal in Moutier. This access trench will be finished in spring 2007. Excavation of the tunnel from Moutier to Court will then commence. Another attack from Court will be started between 2007 and 2008. The tunnel will break through in 2009 and all excavations will be completed in 2010. Concreting inside the tunnel will begin in 2010, then E&M equipment will be installed until end 2012, the expected date for opening of the tunnel. Visit www.a16.ch and www.martiag.ch 50/06.A JV of Marti Tunnelbau, Parietti et Gindrat, and MTS (Marti Travaux Spéciaux) signed a CHF131.2 million contract to build the 3,059 m Bure tunnel (lot 2.602) on the A16, whereof 2,901 metres will be bored and 158 metres will be built in cut-and-cover at the portals. A TBM will be used. From north to south, the geology consists of 15% of limestone (mid Oxfordian) containing astartes and natices, 40% of marls (mid to upper Oxfordian) containing astartes and 45% limestone (upper Oxfordian and Kimmerridgian) containing lower pterocere, cardium and terebratule. Visit www.martiag.ch, www.parietti-gindrat.ch and www.a16.ch 06/07.Open call for tenders, deadline 23rd July, 2007 for geological, geotechnical, hydrogeological and civil engineering consultancy for the Choindez tunnel. Click ch/30. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105868-2007, OJ S 86, or contact République et Canton du Jura, Delémont. 21/07.



Permalink

Open call for tenders, deadline 10.09.2010, for A16 - Section 8 - Lot 8.500: north cut/cover section, north and south portals, north and south access for the Choindez tunnel east tube, length 2,786 m. Contract duration 01.03.2011 to 30.04.2015. Time limit for receipt of requests or for accessing documents, 10.06.2010. Contact bridge and roads office, national roads section, Delemont, tel +41 324207-300, fax -301. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=154028-2010. 23/10.



Permalink

JV of Marti Tunnelbau, Parietti et Gindrat, and MTS (Marti Travaux Spéciaux) signed the contract for the 3,287 m-long Choindez tunnel on the A16 highway in the canton of Jura. The tunnel will be open to traffic in the year 2016. The project includes seven crosscuts for persons, three parking bays with crosscuts for vehicles, and two ventilation control centres. Expected rock quality is a sequence of Jurassic and Tertiary sediments, which require different excavation methods. Drill/blast will be used for 1,700 m, road headers for 680 m, and excavation under the protection of pipe umbrellas for 400 m. A Marti Technik AG conveyor will be used in the existing pilot tunnels. Visit www.martiag.ch, www.parietti-gindrat.ch and www.a16.ch. 09/11.



Permalink

The JV Tunnel de Choindez (Schoenbuehl) secured the EUR147.9 million contract for A16 - Section 8 - Lot 8.500: north cut/cover section, north and south portals, north and south access for the Choindez tunnel east tube, length 2,786 m. Contact bridge and roads office, national roads section, Thierry BeuchatDelemont, tel +41 324207-362, fax -301. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=078579-2011. 11/11.



Permalink

Open call for bids, deadline 20.06.2012, for remote video equipment installation in the tunnels Bure (3,059 m) and Bois de Montaigre (907 m, 820 m) on the A16 highway. Duration contract 1.10.2012-31.12.2013. Time limit for requests for documents is 16.04.2012. Contact Mr Morisoli Matteo, Service des ponts et chaussees, section route nationale, Delemont, e-mail matteo.morisoli@jura.ch. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=087117-2012. 12/12.



Permalink

Open invitation to tender, deadline13.11.2013, for ventilation equipment for 3,287 m-long Choindez tunnel on the A16 highway in the Canton of Jura. Time limit for receipt of requests for documents or for accessing documents 14.08.2013. Duration of contract 01.06.2015 to 31.08.2016. Contact Service des ponts et chaussees, section route nationale, attn Mr Morisoli Matteo, Delemont, e-mail matteo.morisoli@jura.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=225505-2013.

28/13.



Permalink

Open invitation to tender, deadline 12.06.2014, for delivery, installation and commission of lighting equipment for 3,287 m-long Choindez tunnel, connection tunnels and safety tunnel on the A16 highway in the Canton of Jura. Time limit for receipt of requests for documents or for accessing documents 11.03.2014. Duration of contract 01.09.2015 to 31.08.2016. Contact Service des ponts et chaussees, section route nationale, attn Mr Morisoli Matteo, Delemont, e-mail matteo.morisoli@jura.ch. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061881-2014. Ref. Lot 10.5. 09/14.



Permalink

Switzerland, Graubunden - ch/28

Highway

Construction of the 1.3 km Muttnertobel tunnel on the road between Solis and Mutten commencing. Contractor Murer will excavate by drill/blast with support by rockbolts and fibre-reinforced sprayed concrete. Sept 1999.



Permalink

Switzerland, Hergiswil - ch/27

Highway

  Invitation to tender closing 11th February, 2000 for construction of Kirchenwald tunnel, lot 321, 300,000 cu m excavated volume. Contact Tiefbauamt Nidwalden, fax +41 917 439737. Sept 1999.   Joint venture of Murer/Zchokke/Locher/Gasser awarded 2.5 km x 80 sq m single tube from north portal using Atlas Copco 135H to drill 9 m-long umbrella holes in blocky blue limestone and fines to establish drive. Face split into five separate compartments to counter weak conditions. It is expected that the 400 m advance will take up to two years. Drive from south portal has been awarded for a start end-2000, but contract not yet signed. Visit www.murer.ch for details of earlier contracts. April 2000.Construction of 1.5 km-long Kirchenwald twin-tube tunnel underway in two lots: 150 m by Murer/Gasser/Prader/Riva/Zschokke/Locher using steel arches and rockbolts with shotcrete, contract value $20 million for completion 2003; and 1.4 km by Batigroup/Bilfinger & Berger/Frutiger/Garovi-Odermatt using drill/blast in sections ranging from 72 sq m to 116 sq m, contract value $70 million for completion 2007. Engineering consultants are Lombardi SA. Visit www.lombardi.ch October 2000.



Permalink

Switzerland, Flulen - ch/26

Highway

  Open tender, deadline 12th November, 1999 for construction of 2.5 km tunnel on N4 highway. Fax +41 418752610. Sept 1999.  Contract awarded to joint venture of Zschokke/Locher/Murer/CSC/Rothpletz & Reinhard who will utilise Robbins Herrenknecht TBM ex Bozberg and Murgenthal. Segmentally lined, single tube for bi-directional traffic will commence boring Summer, 2000. TBM has been cleaned and overhauled and is stored near Murgenthal ready for reassembly at site. Visit www.murer.ch April 2000.



Permalink