Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Saudi Arabia

Saudi Arabia, Mecca - sa/12

Motorway

Seven drill rigs supplied by Atlas Copco for the construction of four motorway tunnels to ease the movement of the millions of pilgrims who visit Mecca every year. The four tunnels, which total 2,930 m in length, pass beneath Mecca. As part of this project, RIO Trading & Contracting Co. has landed a USD42.1 million contract for the King Khalid bridge/El-Muayssem road expansion, including the extension of the El-Muayssem Road by 400 m and the construction of two 830 m-long horseshoe-shaped vehicular tunnels, the two largest tunnels. RIO has subcontracted the tunnel works to Turkey's STFA for USD26 milllion. Subscribe to E-News Weekly 40/2004. The other two tunnels have been built by Sargin Ekol Asdem, also of Turkey, with its local Arabic partner Alawi Tunsi Establishment. Visit www.atlascopco.com, www.boomer-rig.com and www.stfa.com 05/05.



Permalink

Saudi Arabia, Riyadh - sa/11

Pipelines

  Herrenknecht announced that it has delivered a total of six complete microtunnelling systems for constructing oil and gas pipelines in Riyadh, Damman and East Saudian. Contact through www.herrenknecht.com April 2000.



Permalink

Serbia

Serbia, Belgrade - rs/17

Metro

Closing Date: 18.01.2022 (Tender Closed)


Restricted invitation to tender, deadline 18/01/2022, for the Project Management and Site Supervision of the Belgrade Metro Project - Makis Depot and Line 1. For tender documents click here, where tenders must be sent. Duration of the contract is 108 months. Contact PUC Belgrade Metro and Train, attn Slavko Kozomara, Belgrade, tel +381 4250-553, fax  +381 63 317 699, email nabavke@bgmetro.rs. Visit  

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=672757-2021. Rif.n. PMC 01/21. 01/22

 

Serbia-Belgrade: Construction project management services


2021/S 254-672757

Contract notice

Services

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Project Management and Site Supervision of the Belgrade Metro Project – Makiš Depot and Line 1
Postal address: SVETOZARA MARKOVIĆA, 38-40
Town: Belgrade
NUTS code: RS Srbija/Сpбија / Serbia
Postal code: 11000
Country: Serbia
Contact person: Slavko Kozomara
E-mail: nabavke@bgmetro.rs
Internet address(es):
Main address: https://jnportal.ujn.gov.rs/tender-eo/61581
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://jnportal.ujn.gov.rs/tender-eo/61581
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://jnportal.ujn.gov.rs/tender-eo/61581
Tenders or requests to participate must be submitted to the abovementioned address
Electronic communication requires the use of tools and devices that are not generally available. Unrestricted and full direct access to these tools and devices is possible, free of charge, at: https://jnportal.ujn.gov.rs/tender-eo/61581
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
Other activity: PUC for construction and operation passenger transport by metro and urban railway development in Belgrade „Belgrade Metro and Train“

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Project Management and Site Supervision of the Belgrade Metro Project – Makiš Depot and Line 1


Reference number: PMC 01/21
II.1.2)Main CPV code
71541000 Construction project management services
II.1.3)Type of contract
Services
II.1.4)Short description:


The purpose of the publ. procurement procedure is to provide the professional resources necessary for the fulfillment of the duties and obligations of the Project Manager under the terms of the Civil Works Contracts and Systems Contracts


to provide the necessary support to the Client during the negotiation process with Contractors


to fulfill obligations and duties related to Construction Permits Designs Detailed design control and Construction Supervision according to the terms of the Civil Works Contracts and Systems Contracts and in accordance with the legislation in Serbia


to provide the Client with the necessary support for the fulfillment of its duties and obligations under the terms of the Civil Works Contracts and Systems Contracts


to support the Client with professional and efficient management of testing commissioning and implementation programme with due care and attention, taking care that all activities are completed on time in order to fulfill the obligations of the Client


II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: RS Srbija/Сpбија / Serbia
Main site or place of performance:


Territory of the City of Belgrade on the entire route of Belgrade Metro Line 1 and Makiš Depot


II.2.4)Description of the procurement:


Procurement description: (nature and scope of works, goods, or services or indication of needs and requirements; only for goods – indicate whether offers are required for the purpose of purchasing, leasing, leasing of goods or installment purchases or any combination thereof)


The Consultant will be responsible for the performance of all duties and responsibilities of the Engineer defined in the relevant Conditions of Contract and in Scope of Services. The expected results include, but are not necessarily limited to the following:


• monitoring of all aspects of the Contracts in force between the Client and the Contractors;


• review and approval of the designs for any component of the works for which the Contractors have been assigned responsibility, and all Contractors Documents;


• coordination of time programmes for Works execution between Contractors;


• achievement of full implementation of the Contracts within time, cost and quality in full compliance with the Technical Specifications and standards, approved design, Тerms and Deadlines of the relevant Civil Works Contract and Systems Contracts;


• timely identification and risk analysis of and proposed mitigation measures to save time and money;


• completion of the construction by safeguarding the quality of construction and overseeing the safety of the works.


II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents



Permalink

Serbia, Central Serbia - rs/16

Railway


Prior information notice for reconstruction and modernization of an Existing Railway Line and for construction of the Second Track for Railway Belgrade - Nis, Section Stalac - Dunis. This contract is divided in 2 lots: Tunnelling and civil works for Tunnel n. 4 on Stalac-Dunis section (lot 1); Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade - Nis, Stalac -Dunis section (lot 2). Estimated date of publication of contract notice 05/07/2021. Contact Serbian Railways Infrastructure JSC, attn Mr. Sasa Zlatkovic, Belgrade, tel +381 113621192, email sasa.zlatkovic@srbrail.rs. For further on TED tender, please click here.  Ref.n. EIB-GtP/1/2021/3.4. 22/21. 

 




Permalink


Open invitation to tender, deadline 28/09/2021, for tunnelling and civil works for single bored double-track tunnel n. 4 (tunnel tube length L= 3275 m), evacuation tunnels (length L=310 m + 255 m + 815 m) and access roads P3 (length L=286 m) and P4 (length L=1445 m) on Stalac-Djunis Railway Section. Value of the contract is EUR40 million, excluding VAT. Duration of the contract is 54 months. Contact Serbian Railways Infrastructure JSC, attn Mr. Sasa Zlatkovic, Belgrade, tel +381 113621192, email sasa.zlatkovic@srbrail.rs. For further on tender, please click here and here.  Ref.n. EIB-GtP/1/2021/3.4-1. 30/21. 

 




Permalink

The contract for the design and construction of tunnelling works for single bored double-track Tunnel n. 4 (3275 m), evacuation tunnels (length 310 m+255 m+815 m) and access roads P3 (286 m) and P4 (1445 m) was not awarded  for discontinuation of procedure. Contact Serbian Railways Infrastructure JSC, attn Mr. Sasa Zlatkovic, Belgrade, tel +381 113621192, email sasa.zlatkovic@srbrail.rs.  Ref.n. EIB-GtP/1/2021/3.4. 32/21.  

Serbia-Belgrade: Railway construction works

2021/S 107-278185

Prior information notice

This notice is for prior information only

Works

Legal Basis:

The Ministry of Finance of the Republic of Serbia has requested the European Investment Bank (EIB) to provide financing for the Belgrade – Nis Railway Project. Serbian Railways Infrastructure JSC expects this contract to be financed by the EIB and be subject to the EIB's Guide to Procurement

Section I: Contracting authority

I.1)

Name and addresses

Official name: Joint stock company for public railway infrastructure management: “Serbian Railways Infrastructure” JSC

Town: Belgrade

NUTS code: RS Srbija/Сpбија / Serbia

Postal code: 11000

Country: Serbia

Contact person: Sasa Zlatkovic

E-mail: sasa.zlatkovic@srbrail.rs

Telephone: +381 113621192

Internet address(es):

Main address: https://infrazs.rs/

I.3)

Communication

Access to the procurement documents is restricted. Further information can be obtained at: https://infrazs.rs/

Additional information can be obtained from the abovementioned address

I.4)

Type of the contracting authority

Body governed by public law

I.5)

Main activity

Other activity: Railway services

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title:

Reconstruction and Modernization of Existing Railway Line and Construction of the Second Track Railway Belgrade — Nis, Section Stalac — Dunis

Reference number: EIB-GtP/1/2021/3.4

II.1.2)

Main CPV code

45234100 Railway construction works

II.1.3)

Type of contract

Works

II.1.4)

Short description:

Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade — Nis, section Stalac — Dunis implemented in accordance with FIDIC Contract Conditions for ‘Plant and Design-Build’ (‘Yellow Book’).

II.1.5)

Estimated total value

II.1.6)

Information about lots

This contract is divided into lots: yes

The contracting authority reserves the right to award contracts combining the following lots or groups of lots:

Lot 1 — Tunnelling and civil works for Tunnel no 4 on Stalac-Dunis section;

Lot 2 — Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade — Nis, section Stalac — Dunis.

II.2)

Description

II.2.1)

Title:

Tunnelling and Civil Works for Tunnel Number 4 on Stalac-Dunis Section

Lot No: 1

II.2.2)

Additional CPV code(s)

45234100 Railway construction works

II.2.3)

Place of performance

NUTS code: RS Srbija/Сpбија / Serbia

Main site or place of performance:

The contract will be performed in the Republic of Serbia, in the Resina District of central Serbia in the municipality of the city Cicevac.

II.2.4)

Description of the procurement:

Scope of the procurement includes design-build activities for tunnelling and civil works for Tunnel number 4 on Stalac-Dunis section. The total length of the tunnel no 4 is 3275 m and will be consisted (but not limited to) of the following main activities:

— preparation of design documentation in accordance with the Serbian regulations,

— tunnelling and construction of the new single tube, double-track rail tunnel located on the 182+325.00 km of the Belgrade-Nis railway line,

— construction of the tunnel using the NATM design and construction method,

— construction of the three Emergency Exit shafts with two exist points on each side of the railway,

— the scope of works includes all the necessary tunnelling and civil works, but not electrification, signalling and telecommunication which are part of Lot 2.

II.2.14)

Additional information

II.2)

Description

II.2.1)

Title:

Reconstruction and Modernization of Existing Railway Line and Construction of the second Track Railway Belgrade — Nis, Section Stalac — Dunis

Lot No: 2

II.2.2)

Additional CPV code(s)

45234100 Railway construction works

II.2.3)

Place of performance

NUTS code: RS Srbija/Сpбија / Serbia

Main site or place of performance:

The contract will be performed in the Republic of Serbia, in the Resina District of central Serbia in the municipality of the city Cicevac and Krusevac.

II.2.4)

Description of the procurement:

Scope of the procurement includes design-build activities for reconstruction and modernization of existing railway line and construction of the second track railway Belgrade — Nis, section Stalac — Dunis. The total length of the of the line is 17.77 km of a double-track railway and will be consisted (but not limited to) of the following main activities:

— preparation of design documentation in accordance with the Serbian regulations,

— reconstruction of the exiting railway track and construction of the second railway track for a maximum designed speed of 160 km/h,

— construction of the tunnels 1, 2, 3 and 5 using the NATM design and construction method,

— construction of the emergency exit shafts for tunnel number 1 with two exist points on each side of the railway,

— the scope of works includes all the necessary tunnelling and civil works, electrification, signalling and telecommunication.

II.2.14)

Additional information

II.3)

Estimated date of publication of contract notice:

05/07/2021

Section IV: Procedure

IV.1)

Description

IV.1.8)

Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: no

Section VI: Complementary information

VI.3)

Additional information:

National authorisation (licencing) for construction works and designing is a legal requirement in Serbia, and has to be complied with at the time of the contract signature (it is not a condition for participating in tender and getting the contract awarded).

Legal basis:

• Regulation (EU) No 236/2014 of the European Parliament and of the Council of 11 March 2014 laying down common rules and procedures for the implementation of the Union's instruments for financing external action.

• Decision No 466 / 2014 / EU, published in the Official Journal of the EU, No L 135 of 8 May 2014.

• Works will be implemented in accordance with FIDIC Contract Conditions for ‘Plant and Design-Build’ (‘Yellow Book’).

VI.5)

Date of dispatch of this notice:

01/06/2021



Permalink


The consortium China Railway 21st Bureau Group Ltd from Belgrade (Leader),  N-Ing LLC from Belgrade, Extra-Auto Transport LLC from Vrbas, Faculty of Technical Sciences from Novi Sad, MC Transport Design and Simulation from Belgrade, China Railway Design Corporation Serbia Belgrade branch-Savski Venac from Belgrade and Makspro LLC from Belgrade secured the EUR 40.76 million (RSD4.80 bn) contract, excluding VAT, for the design and construction of tunnelling works for single bored double-track tunnel n. 4 (3275 m), evacuation tunnels (length 310 m+255 m+815 m) and access roads P3 (286 m) and P4 (1445 m) on the railway Belgrade - Nis, section Stalac - Dunis. The construction will begin in the middle of 2022. Contact Serbian Railways Infrastructure JSC, Belgrade. Visit https://jnportal.ujn.gov.rs/. 11/22. 

 




Permalink

Serbia, Vojvodina - rs/15

Motorway

Minister of Regional Development and Local Self-Government has signed a pre-contract with CRBS (China Road and Bridge Corporation) for construction of two motorways in Serbia: the first from Pojate to Preljina (Morava corridor), six lanes, 109.6 km-long; the second from Novi Sad to Ruma, four lanes, 27 km-long, with a tunnel through Fruska Gora mountain. The deadline for the construction of Morava corridor is 4 years and for Novi Sad-Ruma motorway 30 months. CRBS is part of CCCC International, a Chinese company for telecommunications and infrastructure. Visit http://www.koridor10.rs/index.php?mod=static&id=1108. 03/13.



Permalink

Serbia, Srbija - rs/14

Highway

Closing Date: 15.12.2011 (Tender Closed)

Open invitation to tender, deadline 15.12.2011, for construction of tunnels on Grdelica (Gornje Polje)-Caricina Dolina and Caricina Dolina-Vladicin Han sections of highway E-75 in two lots, of which Lot 3 comprises 1,100 m-long, twin-tube, two-lane Predejane tunnel and Lot 4 1,800 m-long, twin-tube, two-lane Manajle tunnel. Both contracts are 900 days long. Funded by EIB under international competitive bidding rules. For further information, inspection of documents, and acquisition of bidding documents, contact Mihajlo Misic at Koridori Srbije in Belgrade, tel +381 11-3344174, fax -3248682, e-mail procurement@koridorsrbije.rs or visit www.koridor10.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313470-2011. Construction of 10.57 km of open-air highway is bidding separately, see http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313471-2011. 41/11.



Permalink

Invitation to tender using restricted procedure, deadline 25.11.2011, for supervision of tunnel construction work on Grdelica-Vladicin Han sections of highway E-75 in two lots, of which Lot 3 comprises 1,112 m-long, twin-tube, two-lane Predejane tunnel and Lot 4 1,804 m-long, twin-tube, two-lane Manajle tunnel. Contract duration 42 months, budget EUR3.1 million. Applications to Fabrizio Spada-Santoni at EU Delegation in 1070 Belgrade. Download application forms at http://ec.europa.eu/europeaid/work/procedures/implementation/services/index_en.htm. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=329202-2011. 43/11.



Permalink

JV Eptisa/Geoconsult secured the EUR2.44 million contract for supervision of tunnel construction work on Grdelica-Vladicin Han sections of highway E-75 in two lots, of which Lot 3 comprises 1,112 m-long, twin-tube, two-lane Predejane tunnel and Lot 4 comprises 1,804 m-long, twin-tube, two-lane Manajle tunnel. Contract duration 42 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=334567-2012. 44/12.



Permalink

Expressions of interest, deadline 21.02.2014, for consulting services for preparation of studies on risk assessment and route determination in the dangerous goods transport on highways E75 and E80, with the specific focus on tunnels. Duration contract 5 months. Contact Koridori Srbije d.o.o., Procurement Department, Belgrade, Serbia, tel +381 11 33 44 174, fax +381 11 32 48 682, e-mail procurement@koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012262-2014. 03/14.



Permalink

Contract, value EUR169,000 excluding VAT, awarded to JV Safege/Spie/Aiscat Servizi of Nanterre, France for consulting services for preparation of studies on risk assessment and route determination in the dangerous goods transport on highways E75 and E80, with the specific focus on tunnels. Duration of contract five months. More from Koridori Srbije d.o.o., Procurement Department, Belgrade, Serbia, tel +381 11 33 44 174, fax +381 11 32 48 682, e-mail procurement@koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=010361-2015. 03/15.

 



Permalink

Invitation to tender, deadline 24.08.2017, for the procurement of plant design, supply, and installation of E&M, Power and IT Equipment for the Predejane Tunnel (1,112 m) and Manajle Tunnel (1,804 m) on the E75 Highway, Corridor X. Contact Koridori Srbije, Belgrade, Serbia, tel +381 11 33 44 174, fax +381 11 32 48 682, email procurement@koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=220672-2017. Ref.n. CORRX.E75.EIB-EQ.ICB. 24/17.



Permalink

Serbia, Belgrade - rs/13

Light Rail

Restricted call for tenders, deadline 29th May, 2006 for participation of interested tenderers in the eligibility phase for consulting services involving specification and preparation of base documents (preparation of tender documentation, constitution of Terms of Reference, etc.) for the preparation of studies, analyses, expertise, design documentation and general coordination of the preparatory activities required for the construction of the first LRT line in Belgrade. The foreseen duration of the consulting services is 36 months from the signature of the contract with the successful bidder. More details here. A first call for bids has been declared void.  The new LRT route length would be about 25 km. The first line has a length of 13 km, about 23% of which in tunnel, about 8% on bridge and about 69% at grade. The total tunnel section length is around 3.5 km, with six or seven underground stations. The first line has an estimated cost of EUR387 million. Contact Vladimir Depolo, Belgrade Land Development Agency, Unit for Projects Implementation, Njegoseva 84, 11000 Belgrade. Tel. + 381 113443020, fax +381 113440596, e-mail vladimir.depolo@beoland.com or lrt@beoland.com 17/06.



Permalink

Serbia, Sozina - rs/12

Highway

Details of the bidding process for this scheme can be obtained from the Directorate for Motorway Construction 17, Marka Miljanova Street, 81000 Podgorica Republic of Montenegro, fax +381-81-624-353. April 2000.



Permalink

Serbia, Nis - rs/11

Highway

International tender for the construction of the section of E-75 motorway from Nis in Serbia to the border with the Former Yugoslav Republic of Macedonia with several tunnels to be built under a concession arrangement has produced a short list of three bidders and final selection is imminent. However, design documentation is still at the preliminary stage. More information from www.corridor10.org.rs April 2000.



Permalink

Prior information notice for wide-ranging technical consultancy services financed by EIB for construction of sections on 86 km of highway E-80 between Nis and Dimitrovgrad on Bulgarian border, 74 km on highway E-75 between Leskovac and the border with Republic of Macedonia, and completion of sections A and B of Belgrade bypass. More information from Dr Nenad Ivanisevic at Koridor 10 in Belgrade, tel +381 11-3344174, fax -3248682, e-mail n.ivanisevic@koridor10.rs or visit www.koridor10.rs where procurement notices will be announced. Document reference number 5835-2011. 02/11.



Permalink

Open invitation to tender, deadline 14.06.2011, for construction of 22.5 km-long section of highway E-80 in three lots, of which Lot 3 comprises 750 m-long, twin-tube, two-lane Bancarevo tunnel. Funded by EIB under international competitive bidding rules. Further information from Dr Nenad Ivanisevic at Koridori Srbije in Belgrade, tel +381 11-3344174, fax -3248682, e-mail n.ivanisevic@koridor10.rs or visit www.koridor10.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120299-2011. 16/11.



Permalink

Greek company Terna SA secured the EUR38.68 million contract for construction of Przojna Padina and Progon tunnels, total length 1.7 km, on the Dimitrovgrad bypass on the eastern section of Corridor 10. Start of work on July, 2011. Contract duration 24 months. Visit www.koridor10.rs and www.terna.gr. 19/11.



Permalink

Invitation to tender subject to post qualification, deadline 16.02.2012, for construction of 28.72 km-long section of highway E-80 Ciflik-Pirot in two lots, of which Lot 2 is 16.65 km-long and includes twin-tube, two-lane tunnels Sopot (185 m-long) and Sarlah (477 m-long). Construction period 730 days. Funded by EIB under international competitive bidding rules. For further information and inspection of bidding documents contact Mihajlo Misic at Koridori Srbije in Belgrade, tel +381 11-3344174, fax –3248682, e-mail procurement@koridorisrbije.rs or visit www.koridor10.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=392959-2011. 51/11.



Permalink

Invitation to tender subject to post qualification, revised deadline 15.03.2012, for construction of 28.72 km-long section of highway E-80 Ciflik-Pirot in two lots, of which Lot 2 is 16.65 km-long and includes twin-tube, two-lane tunnels Sopot (185 m-long) and Sarlah (477 m-long). Construction period 730 days. Funded by EIB under international competitive bidding rules. For further information and inspection of bidding documents contact Mihajlo Misic at Koridori Srbije in Belgrade, tel +381 11-3344174, fax –3248682, e-mail procurement@koridorisrbije.rs or visit www.koridor10.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=050606-2012. 07/12.



Permalink

Prior information of intended invitation to tender in fourth quarter 2012, deadline 02.04.2013, for construction of highway E80 from Nis (Prosek) to Dimitrovgrad Lot 3, Progon and Przojna Padina tunnels. Funded by EIB under international competitive bidding rules. For further information, inspection of documents, and acquisition of bidding documents, contact Mihajlo Misic at Koridori Srbije in Belgrade, tel +381 11-3344174, fax –3248682, e-mail procurement@koridorsrbije.rs or visit www.koridor10.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=112591-2012. 15/12.



Permalink

Invitation to tender subject to post qualification, deadline revised to 24.05.2012, for construction of 28.72 km-long section of highway E-80 Ciflik-Pirot in two lots, of which Lot 2 is 16.65 km-long and includes twin-tube, two-lane tunnels Sopot (185 m-long) and Sarlah (477 m-long). Construction period 730 days. Funded by EIB under international competitive bidding rules. For further information and inspection of bidding documents contact Mihajlo Misic at Koridori Srbije in Belgrade, tel +381 11-3344174, fax –3248682, e-mail procurement@koridorisrbije.rs or visit www.koridor10.rs. Technical bids to be delivered before 12.00 h on 24.05.2012 to 21 Kralja Petra Street, Floor 2, Room 228, Belgrade, Serbia. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=143406-2012. 19/12.



Permalink

Updating for the Corridor X Highway Project, estimated value EUR1.3 billion. Prior information of intended invitation to tender in third quarter of 2013 for construction of Corridor X, highway E80 from Nis (Prosek) to Dimitrovgrad, section Prosek–Crvena Reka, procurement of tunnel equipment for LOT 3: Tunnel Bancarevo and section Ciflik–Pirot (East), procurement of tunnel equipment for LOT 2: Tunnel Sarlah.

Prior information of intended invitation to tender in mid 2013 for construction of Corridor X, highway E80 from Nis (Prosek) to Dimitrovgrad, section Dimitrovgrad Bypass, procurement of tunnel equipment for LOT 3: Tunnels Progon and Przojna Padina.

Prior information of intended invitation to tender in last quarter of 2014 for construction of Corridor X, highway E75 from Grabovnica to Levosoje, section Grdelica–Caricina Dolina, procurement of tunnel equipment for LOT 3: Tunnel Predejane and section Caricina Dolina–Vladicin Han, procurement of tunnel equipment for LOT 4: Tunnel Manajle. Contact Koridori Srbije, att.n Mihajlo Misic, Belgrade, tel +381 11 3344174, fax +381 11 3248682, e-mail procurement@koridorsrbije.rs or visit www.koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=155462-2013. 20/13.



Permalink

The consortium Alliance X (ADVAL JSC and Road & Bridges Ltd) of Sofia, Bulgaria secured Lot 3 and Lot 4 construction of Highway E 75, sections Grdelica-Caricina Dolina and Caricina Dolina-Vladicin Han. Lot 3, value EUR14.97 million, includes the 1,100 m Predejane tunnel. Lot 4, value EUR33.39 million, includes the 1,800 m Manajle tunnel. Duration of contract 900 days for each lot. Contact Koridori Srbije, att.n Mihajlo Misic, Belgrade, tel +381 11 3344174, fax +381 11 3248682, e-mail procurement@koridorsrbije.rs or visit www.koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=155460-2013. 20/13.



Permalink

Aktor SA of Athens secured the EUR73.28 million contract for the 16.65km Stanicenje -Pirot (East) section (Lot 2) of the highway E-80 Ciflik-Pirot, including twin-tube, two-lane tunnels Sopot (185 m-long) and Sarlah (477 m-long). Construction period 730 days. Contact Koridori Srbije in Belgrade, tel +381 11-3344174, fax –3248682, e-mail procurement@koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187251 -2013. 24/13.



Permalink

Expressions of interest, deadline 21.02.2014, for consulting services for preparation of studies on risk assessment and route determination in the dangerous goods transport on highways E75 and E80, with the specific focus on tunnels. Duration contract 5 months. Contact Koridori Srbije d.o.o., Procurement Department, Belgrade, Serbia, tel +381 11 33 44 174, fax +381 11 32 48 682, e-mail procurement@koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=012262-2014. 03/14.



Permalink

Contract, value EUR169,000 excluding VAT, awarded to JV Safege/Spie/Aiscat Servizi of Nanterre, France for consulting services for preparation of studies on risk assessment and route determination in the dangerous goods transport on highways E75 and E80, with the specific focus on tunnels. Duration of contract five months. More from Koridori Srbije d.o.o., Procurement Department, Belgrade, Serbia, tel +381 11 33 44 174, fax +381 11 32 48 682, e-mail procurement@koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=010361-2015. 03/15.

 



Permalink

Open invitation to tender, deadline 22.08.2017, for procurement, supply, and installation of mechanical, electrical, power and IT Equipment for the Sarlah (477 m), Sopot (185 m) and Bancarevo (750 m) twin tube tunnels, on the E80 Highway, Corridor X. Time for completion – For the Sarlah and Sopot tunnels all works must be completed within 180 days and for the Bancarevo tunnel it must be completed within 280 days.

For further information contact Koridori Srbije, Belgrade, Serbia, tel +381 11 33 44 174, fax +381 11 32 48 682, email procurement@koridorisrbije.rs, web site www.koridorisrbije.rs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200029-2017. Ref.n. CORRX.E80.EIB-EQ.ICB. 22/17




Permalink

Prior information notice without call for competition for the construction of the 32km Nis (Merosina)- Plocnik (Beloljin) section of Highway E-80.

The EUR255 million project is expected to require 3-5 works contracts for the construction of the semi-motorway;  2-3 services contracts for construction supervision, project management and environmental and social monitoring and evaluation services;  1-2 goods contracts for ITS and tunnel equipment.  Tendering for the above contracts is expected to begin in Q3 of 2020. Contact Koridori Srbije, attn Mrs Bojana Stojadinovic, Belgrade, fax +381 113344174, email procurement@koridorisrbije.rs.  .For tender information please click here. 08/20.



Permalink

Open invitation to tender, deadline 17/08/20 , for supervision Services for the construction of the 32km Nis (Merosina)- Plocnik (Beloljin) section of Highway E-80, including 16 bridges, 8 overpasses/underpasses, 6 tunnels (total length approximately 2 670 m), ancillary E&M equipment and infrastructure, drainage systems and horizontal and vertical signalisation. Consultants can download the template for Expression of Interest (EOI) from here. Contact Koridori Srbije, Belgrade, fax +381 113344174, email procurement@koridorisrbije.rs. For tender information please click here. 27/20.




Permalink


Koridori Srbije from Belgrade is inviting expressions of interest (EOI), with a deadline of the 07/09/2020, for a consultant to be selected for implementation support and environmental and social Impact monitoring services for the construction of a 32.7km semi-motorway from Nis (Merosina) to Plocnik (Beloljin), Serbia. The new motorway will include approximately 5 grade-separated interchanges, 16 bridges, 8 overpasses/underpasses, 6 tunnels (total length approximately 2 670 m) and ancillary E&M equipment and infrastructure. Drainage systems and horizontal and vertical signalisation will also be provided. The works will be implemented through several contracts to be procured and built in a phased fashion over the period 2021 to 2025, with a single company or JV acting as the Engineer for all the works. The estimated project investment cost, including land expropriation and contingencies but excluding VAT, is EUR 255 million. The services are expected to start in Q2 2021 with an implementation period of 84 months. The estimated cost for the services is EUR3 million, excluding VAT. Contact Koridori Srbije, Belgrade, Serbia, tel + 381 113344174, email procurement@koridorisrbije.rs. For tender information please click here. 31/20.






Permalink

Singapore

Singapore, Singapore - sg/30

Cross Island Line


The Land Transport Authority (LTA) has awarded the civil contract to design and construct the bored tunnel between Aviation Park and Loyang stations (working names)  for the Cross Island Line Phase 1 (CRL1) to Taisei Corporation - China State Construction Engineering Corporation Limited Singapore Branch Joint Venture, at a total contract value of EUR222.44 million (SGD356 million).  

Construction works for the 3.2-km tunnel between Aviation Park Station and Loyang Station is expected to start in the second quarter of 2021. For the first time, LTA will use a large-diameter TBM to construct a single tunnel with two tracks in it.  CRL1 is slated to commence passenger service in 2030. Visit https://www.lta.gov.sg. 10/21. 



Permalink


The Land Transport Authority (LTA) has awarded to Samsung C&T Corporation from Seoul, Korea, the EUR 380.69 million (SGD604 million) civil contract for the design and construction of Hougang interchange station and tunnels for the Cross Island Line (CRL), Phase 1. This contract covers the design and construction of Hougang interchange station and tunnels, as well as addition and alteration works to the existing Hougang station along the North East Line (NEL). 

Construction works for the CRL Hougang station are expected to start in the fourth quarter of 2021, with passenger service planned to commence in 2030. Click here and sg/30 for the tunnelbuilder archive. Visit https://www.lta.gov.sg/. 13/21. 

 




Permalink

 

The Land Transport Authority (LTA) has awarded the civil contract for the design and construction of Pasir Ris interchange station and tunnels for the Cross Island Line Phase 1 (CRL1) to Daewoo Engineering & Construction Co Ltd,  Dongah Geological Engineering Co Ltd, Singapore Branch Joint Venture, at a total contract value of EUR 603,02 million (SGD980 million). This contract covers the design and construction of Pasir Ris interchange station and tunnels, as well as addition and alteration works to the existing Pasir Ris station along the East-West Line (EWL). 

Construction works for the CRL Pasir Ris station are expected to start in the fourth quarter of 2021, with passenger service planned to commence in 2030.  Visit https://www.lta.gov.sg. 20/21. 

 




Permalink


The Land Transport Authority (LTA) has awarded the civil contract CR 116 for the design and construction of Ang Mo Kio station and tunnels under the first phase of the Cross Island Line (CRL1) to Gammon Construction and Engineering Pte. Ltd - Bachy Soletanche Singapore Pte. Ltd. Joint Venture. Valued at (EUR 403.36 million) SGD $644 million, the contract will also cover addition and alteration (A&A) works to the existing Ang Mo Kio station along the North-South Line (NSL). When completed, Ang Mo Kio station will be an interchange between CRL and NSL. Construction works for the CRL1 Ang Mo Kio station are expected to start in the fourth quarter of this year, with passenger service slated for 2030. Visit https://www.lta.gov.sg and www.vinci.com 29/21. 

 




Permalink


The Land Transport Authority (LTA) has awarded to Hock Lian Seng Infrastructure Pte Ltd  the EUR 208.04 million (SGD320 million) contract to design and construction of Aviation Park station and tunnels of the Cross Island Line Phase 1 (CRL1). Construction works for the Aviation Park station are expected to start in the first quarter of 2022, with passenger service slated to commence in 2030. Aviation Park station is an underground station located next to Changi Coast Road and Aviation Park Road. The ground conditions in this area are expected to be challenging as they are made up of thick layers of underlying marine clay. Safety measures will be taken when carrying out the Earth Retaining and Stabilising Structure and deep excavation works to ensure stability of the ground and surrounding structures. The works will be carried out under strict compliance to regulations including aviation height restrictions given its proximity to the Changi Airport compound. LTA and the contractor will monitor the works closely to ensure that they are carried out safely. Visit https://www.lta.gov.sg .46/21. 

 




Permalink


The Land Transport Authority (LTA) has awarded to Nishimatsu Construction Co Ltd the EUR 289.96 million (SDG446 million) contract for the design and construction of the bored tunnel between Tampines North and Defu stations, Cross Island Line Phase 1 (CRL1). The contract includes the construction of a facility building with underground basements to cater to the electrical and mechanical requirements of CRL1. A 12.6m m diameter TBM will be used to construct a single 2.9-km long tunnel with two tracks in it. This will be the largest TBM ever to be deployed in Singapore and it is expected to increase work productivity and reduce manpower requirements. The tunnel will be constructed at an approximate depth of 35 m below ground level, and is almost 50 m underground at its deepest. Tunnelling will be carried out mostly in Old Alluvium, which is a predominantly soil-like material comprising sandy and silty clay. This abrasive ground condition is expected to cause some wear to the TBM’s cutting equipment. Construction works for the bored tunnel between Tampines North station and Defu station are expected to start in December 2021.Visit https://www.lta.gov.sg and https://www.nishimatsu.co.jp/.  46/21. 

 




Permalink


The Land Transport Authority (LTA) has awarded the EUR 506.50 million (SGD780 million) civil contract for the design and construction of the 6 km tunnels at a 20 m-40 m depth below ground level between Aviation Park station and Changi East Depot under the Cross Island Line Phase 1 (CRL1) to Shanghai Tunnel Engineering Co (Singapore) Pte Ltd - LT Sambo Co Ltd (Singapore Branch) Joint Venture.  The ground conditions in this area comprise thick layers of underlying soft marine clay and extensive works will have to be carried out to strengthen the soil condition to ensure that construction works proceed safely. Passenger service for the line is expected to start in 2030. Visit https://www.lta.gov.sg . 01/22.  

 




Permalink


The Land Transport Authority (LTA) has awarded 2 civil contracts for the design and construction works for two stations and associated tunnels under the Cross Island Line Phase 1 (CRL1). 

The first contract, valued at EUR 308.55 million (SDG467 million) and covering the design and construction of Defu station and tunnels, was awarded to Gamuda Berhad Singapore Branch - Wai Fong Construction Pte Ltd Joint Venture.   

The second contract, valued at around EUR262.30 million (SDG397 million), covers the design and construction of Tampines North station and tunnels. It has been awarded to China Communications Construction Company Limited (Singapore Branch).  

Construction works for Defu and Tampines North stations are expected to start in the second quarter of this year, with passenger service for CRL1 slated to commence in 2030. Visit https://www.lta.gov.sg. 08/22.  



Permalink


The Land Transport Authority (LTA) has awarded to Penta Ocean Construction Co Ltd the EUR 353,35 million (SGD526 million) civil contract for the design and construction of Bright Hill interchange station and tunnels under Cross Island Line Phase 1 (CRL1). Construction works for CRL1 Bright Hill station are expected to start in the second quarter of 2022, with passenger service expected to commence in 2030. Visit https://www.lta.gov.sg. 14/22.   

 




Permalink

Jacobs has been appointed as the design consultant for the design and construction of the Tavistock Station and Tunnels, as part of the Cross Island Line Phase 1 project in Singapore. The EUR276.70 million (SGD407 million) contract comprises of the design and construction of the underground station, bored tunnels, launching shaft for TBMs and associated building services.Visit https://invest.jacobs.com/ and https://www.lta.gov.sg/. 23/22.  



Permalink

 

The Land Transport Authority (LTA) has awarded the civil contract for the design and construction of Riviera station under the Cross Island Line-Punggol Extension (CPe) to Taisei Corporation – China State Construction Engineering Corporation Ltd Singapore Branch Joint Venture. The contract is valued at around EUR 780.89  (SGD1.1 bn). Construction works for the CPe Riviera station are expected to start in the first quarter of 2023, with passenger service targeted to commence in 2032.  

A EPB TBM, diameter 12 m, will be used to construct a single 4.3-km-long tunnel with two tracks in it. The tunnel will be constructed at an approximate depth of 25 m below ground.  Visit https://www.lta.gov.sg/. 39/22. 

 




Permalink


The Land Transport Authority (LTA) has awarded two civil contracts: 

  • Woh Hup Pte Ltd from Singapore secured the EUR347.48 million (SGD496 million) contract for the design and construction of Punggol interchange station under the Cross Island Line - Punggol Extension (CPe). The new Punggol interchange station is located along Punggol Central.  
  • Obayashi Corporation & Shanghai Tunnel Engineering Co (Singapore) Pte Ltd Joint Venture secured the EUR531.14 million (SGD758 million) contract for the design and construction of the bored tunnel between Fairways Drive and Sin Ming Walk under Cross Island Line Phase 2 (CRL2).  A 12 m-diameter slurry TBM will be used to construct the single 5-km-long tunnel with two tracks in it. A 2-km stretch of the bored tunnel alignment will cross under the Central Catchment Nature Reserve.  Here, the tunnel will be constructed up to an approximate depth of 70 m below ground level, deeper than the usual 20-30 m.   

Construction works for the CPe Punggol interchange station as well as the bored tunnel between Fairways Drive and Sin Ming Walk for CRL2 are expected to start in the first half of 2023, with passenger service targeted to commence in 2032. Visit https://www.lta.gov.sg/. 08/23. 

 




Permalink


The Land Transport Authority (LTA) has awarded to: 

  • China Communications Construction Company Limited (Singapore Branch) the SGD447 million contract  (CR205) for the design and construction of the King Albert Park interchange station,  located along Blackmore Drive off Bukit Timah Road,  under the Cross Island Line (CRL) Phase 2 project in Singapore.  
  •  China Communications Construction Company Limited (Singapore Branch) - Sinohydro Corporation Limited (Singapore Branch) Joint Venture the SGD514 million contract (CR208) for the design and construction of Clementi station - adjacent to the junction of Commonwealth Avenue West and Clementi Avenue 4 -  under the Cross Island Line (CRL) Phase 2 project in Singapore.   

 Construction works for the CRL King Albert Park and Clementi stations are expected to start in the first quarter of 2024 and passenger service for CRL Phase 2 is targeted to commence in 2032. Visit https://www.gebiz.gov.sg/ and https://www.lta.gov.sg/.  49/23. 

 




Permalink


Land Transport Authority (LTA) has awarded the Singapore branch of Gamuda Berhad the EUR 352.81 million (S$509.57 million) contract for the design and construction of the West Coast underground station and associated tunnels for the Cross Island Line (CRL2) phase 2 project in Singapore. The station, whose name is not final, will be along West Coast Road. 

The CRL - completely underground - is Singapore's eighth MRT line. Its construction has been divided into three phases. The awarding of all contracts for the construction of Phase 1, announced in 2019, 29km long with 12 stations from Aviation Park to Bright Hill, was completed in March 2022. Construction work has started and will be completed by 2030. 

Phase 2 of the LRC, announced in September 2022, is about 15 km long with 6 underground stations: Turf City, King Albert Park, Maju, Clementi, West Coast and Jurong Lake District.

Engineering studies for Phase 3 of the CRL are currently underway and, once completed, will allow the publication of further details Contact Land Transport Authority, Singapore,


email lta_contracts_1ctciv@lta.gov.sg. please visit https://www.gebiz.gov.sg/, and https://gamuda.com.my/ and  https://www.ltae si concluderanno .gov.sg/.  Rif. n. CR209. 40/23. 



Permalink


Land Transport Authority (LTA) has awarded to KTC Civil Engineering & Construction Pte Ltd the EUR331.08 million (SGD480 million) civil contract for the design and construction of Maju station (working name) and tunnels under the Cross Island Line Phase 2 (CRL2).

Construction works for the CRL Maju underground station, located along Clementi Road, are expected to start in the second quarter of 2024 and passenger service for CRL Phase 2 is targeted to commence in 2032. Visit https://www.lta.gov.sg/.  06/24.



Permalink


The Land Transport Authority (LTA) has awarded to Shanghai Tunnel Engineering Co (Singapore) - Obayashi Corporation Joint Venture the EUR 365.52 million (SGD530 million) civil contract for the design and construction of CR14 Turf City station (working name) and tunnels under the Cross Island Line Phase 2 (CRL2). 

CR14 station is an underground station located along Turf Club Road, near the former Grandstand. The construction works are expected to be challenging due to the varying soil conditions in the area, in particular the harder ground conditions of the Bukit Timah granite formation which requires the use of specialised techniques to carry out excavation works safely. Before commencing excavation and construction works for the station structure, earth retaining and stabilising structures will be installed to ensure safety and ground stability.  LTA and the contractors will monitor works closely and implement necessary mitigation measures to ensure safe construction with minimal impact to nearby stakeholders and infrastructure. 

Construction works for the CR14 station are expected to start in the third quarter of 2024, and passenger service for CRL Phase 2 is targeted to commence in 2032.

Visit https://www.gebiz.gov.sg/ and https://www.lta.gov.sg/.  Bid n. LTA000ETT23000076, Ref.n.CR203. 25/24.



Permalink


The Land Transport Authority (LTA) has awarded to Nishimatsu Construction Co Ltd - Okumura Corporation Singapore Branch Joint Venture the EUR166.93 million (SGD242 million) civil contract for the design and construction of tunnels between the West Coast station (CR18) and Jurong Lake District station (CR19) (working names) for Cross Island Line (CRL) Phase 2

This contract encompasses the construction of twin bored tunnels, each extending 2.4 km beneath the Sungei Pandan canal and key infrastructure such as the West Coast Highway and Ayer Rajah Expressway. These tunnels are projected to reach depths of up to 40 m, surpassing the typical 30-m depth for other stations. The ground conditions in this area predominantly consist of weathered soil and hard sedimentary rock.   Real-time monitoring and safety measures will be implemented during the tunnelling works.  LTA and the contractors  will implement necessary mitigation measures to ensure ground stability and safe construction and minimise impact on nearby stakeholders and infrastructure.

Construction works are expected to start in the fourth quarter of 2024 and passenger service for CRL Phase 2 is targeted to commence in 2032. Visit https://www.gebiz.gov.sg/ and https://www.lta.gov.sg/.  Bid n. LTA000ETT23000080, Ref.n.CR210. 25/24.



Permalink