Norway

Norway, Hordaland - no/250

Strade

Closing Date: 01.03.2018 (Tender Closed)

Open invitation to tender, deadline 01.03.2018, for the construction of the two high voltage cable tunnels Breivik — Drotningsvik (1.5 km) and Knarrevik-Litlesotra (1.9 km) with shafts on the stretch Breivik — Litlesotra of the Rv 555 Sotrasambandet (the Sotra connection) in Hordaland County. A tender conference and site inspection will be held on 8.2.2018, 10:00. Meet at: Marineveien 2, 5141 Fyllingsdalen.Norvegia. For further information http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=203067&B=VEGVESEN. Visit

http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=036137-2018.

Ref.n. 17/215336. 06/18.



Permalink

Postponed from 01.03.2018 to 14.03.2018 the deadline of the open invitation to tender for the construction of the two high voltage cable tunnels from Breivik — Drotningsvik (1.5 km) and from Knarrevik-Litlesotra (1.9 km) with shafts on the stretch Breivik - Litlesotra of the Rv 555 Sotrasambandet (the Sotra connection) in Hordaland County. For further information http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=203067&B=VEGVESEN. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=036137-2018. Ref.n. 17/215336. 08/18.



Permalink

Multiconsult Norge AS from Oslo secured the EUR54,843 contract, excluding VAT, for inspections of properties for the construction of cable tunnels Breivik — Litlesotra  in Hordaland County. Contact   http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=196592-2018  Ref.n. 17/65485. 18/18



Permalink

The JV Bertelsen and Garpestad AS from Egersund (NO)/Metrostav AS from Kozeluzska  (CZ) secured the EUR29.55 million contract, excluding VAT, for the construction of the two high voltage cable tunnels Breivik — Drotningsvik (1.5 km) and Knarrevik-Litlesotra (1.9 km) with shafts on the stretch from Breivik — Litlesotra part of the Rv 555 Sotrasambandet (the Sotra connection) in Hordaland County. Contact the Norwegian Public Roads Administration, attn Gunnar Gjaeringen, Oslo, tel +47 95088783, email gunnar.gjaeringen@vegvesen.no.Visit

http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=391599-2018.

Ref.n. 17/215336. 37/18.



Permalink


The Sotra Link consortium – composed of the Australian investment bank Macquarie Group Ltd from Sydney (70%), the south Korean SK Ecoplant Co. Ltd  from Seoul (20%) and the Italian  Webuild SpA (10%) – have won a EUR1.96 billion (NOK 19.8 billion) contract to build and manage the RV.555 Sotra Connection PPP Project.  

Sotra Link has associated within consulting and engineering are the Norwegian offices of Norconsult and Multiconsult. In addition, the companies PINI from Switzerland, FCC from Spain and Intertoll from Hungary are involved in implementing the project.  

New Sotra connection includes the construction of 9.4 km four-lane road from the intersection with Fv 562 at Storavatnet in Bergen to the junction with Fv 561 at Kolltveit in Oygarden municipality. About 4.6 km will be in a tunnel. The project includes a new four-lane bridge of about 900 m, with a separate pedestrian and bicycle path. The new road system will have lanes and ramps for public transport and pedestrian and bicycle paths. New parking and public transport terminals will be built on Straume and at Storavatnet. Three smaller bridges are also included in the project Contact the Norwegian Public Roads Administration, attn Lene Saelen Rivenes, Oslo, email lene.saelen.rivenes@vegvesen.no.  Visit https://www.vegvesen.no and    
 http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=231424-2022 . Ref.n. 19/352033. 37/21. 


Visit https://www.vegvesen.no. 37/21.  



Permalink

Norway, Sogn & Fjordane County - no/248

Road

Closing Date: 02.10.2017 (Tender Closed)

Open invitation to tender, deadline 02.10.2017, for a turnkey contract on landslide protection of the national road Rv 13 between Vik and Gotevik. The assignment comprises engineering design, construction, control and documentation of 850 m of road and 2 880 m of tunnel including installations on the  Rv 13 between Vik and Gotevik in the Vik kommune. The project also comprises engineering design, construction, control and documentation of disposal sites for excavated masses including access the road at Hesjaslettet, disposal site for tunnel masses in Boadalen and approximately 2 350 m of upgrading of the Kalsetvegen and parking spaces at Vik Ski Centre. For free of charge procurement documents go to nhttps://kgv.doffin.no/ctm/Supplier/Documents/Folder/155444. The duration of the contract is 41 months. Contact Norwegian Public Roads Administration West Region, attn Arne Strand, Leikanger, tel +47 95191798, email arne_strand@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=241795-2017. Project Rv 13 Vik - Vangsne, n. 17/61451. 26/17.



Permalink

Norway, Telemark County - no/247

Motorway

Closing Date: 23.05.2017 (Tender Closed)

Open invitation to tender, deadline 23.05.2017, for the upgrade of existing Kjørholt (2.2 km) and Bamble (0,8 km) tunnels on the E18 motorway and construction of new E18 parallel two-lane tunnels. The value of the contract is EUR74,18 million, excluding VAT. The duration of the contract is from 19/06/2017 to 31/10/2018. Further information from http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=181878&B=NYEVEIER. Contact Nye Veier, attn Camilla Holm Nilsen, Kristiansand, tel +47 99249465, email camilla.holm.nilsen@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=125401-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=173603-2017. Ref.n. E18 KBT. 19/17.



Permalink

Hæhre Entreprenør AS from Vikersund secured the EUR65.29 million, excluding VAT, for the upgrade of existing Kjorholt (2.2 km) and Bamble (0,8 km) tunnels on the E18 motorway and construction of new E18 parallel two-lane tunnels. Contact Nye Veier, attn Bjorn Borseth, Kristians and, tel +47 97501310, email bjorn.borseth@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=353545-2017. Ref.n. E18 KBT. 38/17.



Permalink

Competitive procedure with negotiation, deadline 15.02.2019, for engineering design services and construction of a new Grenland bridge (600 m) over Frierfjorden in Porsgrunn and Bamble Municipalities on the E18 Kjorholt - Rugtvedt motorway. The contract also includes open air road (150 m) and completion of Kjorholt (2.2 km) and Bamble (760 m) tunnels.

Newly blasted tunnels must be completed and existing tunnels with traffic must be prepared for one-way traffic. The value of the contract is EUR87.43 million, excluding VAT. Further information from http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=225554&B=NYEVEIER. Contact Nye Veier, attn Cathrine Murstad, Kristiansand, tel +47 41411120, email anskaffelser@nyeveier.no. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=547165-2018.

50/18.



Permalink

Competitive procedure with negotiation, deadline 15.02.2019, for engineering design services and construction of a new Grenland bridge (600 m) over Frierfjorden in Porsgrunn and Bamble Municipalities on the E18 Kjorholt - Rugtvedt motorway. This tender includes the end of construction of Kjorholt (2.2 km) and Bamble (760 m) tunnels. Contact Nye Veier, attn Cathrine Murstad, Kristiansand, tel +47 41411120, email anskaffelser@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315056-2019.

28/19.



Permalink

Competitive procedure with negotiation, deadline 16/01/2020, for optimisation and development project for a 4 lane motorway with a 110 km/h speed limit on the stretch Langangen - Rugtvedt, with guarantee responsibility.  At the northern end it will join an existing 4 lane motorway ended by the Norwegian Public Roads Administration at Langangen in 2012. At the southern end it will join Nye Veier's ongoing project E18 Rugtvedt-Dordal, which is under construction and is expected to be completed in December 2019. The contract work will be carried out as a turnkey contract split into 3 parts: Lot 1: Langangen-Lanner; Lot 2: Lanner-Kjørholt; Lot 3: Kjørholt-Rugtvedt.

For tender documents please click here where tenders must be sent. Value of the contract EUR516,47 million (NOK 5.2 billion), excluding VAT.  Duration of the contract from 17/12/2020 to 01/07/2025.

Contact Nye Veier, attn Ruben Ramsland, Kristiansand, email anskaffelser@nyeveier.no. For further tender information please  click here 49/19.



Permalink


Competitive procedure with negotiation, deadline 16/01/2020, for optimisation and development project for a 4 lane motorway with a 110 km/h speed limit on the stretch Langangen - Rugtvedt.  At the northern end it will join an existing 4 lane motorway which ends at the Norwegian Public Roads Administration in Langangen built in 2012. At the southern end it will join Nye Veier's ongoing project E18 Rugtvedt-Dordal, which is under construction and is expected to be completed in December 2019. The contract work will be carried out as a turnkey contract split into 3 parts: Lot 1: Langangen-Lanner; Lot 2: Lanner-Kjørholt; Lot 3: Kjørholt-Rugtvedt.  

For tender documents please click here where tenders must be sent. Value of the contract EUR516,47 million (NOK 5.2 billion), excluding VAT.  Duration of the contract from 17/12/2020 to 01/07/2025.  

Contact Nye Veier, attn Ruben Ramsland, Kristiansand, email anskaffelser@nyeveier.no. For further tender information please click here 49/19. 

 




Permalink



EIFFAGE Genie Civil from Velizy-Villacoublay secured the EUR213.22 million (NOK2.1 bn) EUR497.12 million (NOK5 bn) contract, excluding VAT,  for Lot 1 and Lot 3 optimisation and development project for a 4 lane motorway with a 110 km/h speed limit on the streach Langangen -Rugtvedt, with guarantee responsibility.  The project is split into Lot 1: Langangen-Lanner,  Lot 2: Lanner-Kjørhol,  Lot 3: Kjørholt-Rugtved and includes in total 6.6km tunnel and a 1.6 km bridge. The contract for Lot2 will be awarded after a further project optimisation phase.  Contact Nye Veier, attn Ruben Ramsland, Kristiansand, email anskaffelser@nyeveier.no. For further tender information please  click here and here. 53/20.  

 



 




Permalink

 

EIFFAGE Genie Civil from Velizy-Villacoublay secured the EUR458.74 million (NOK4.52 bn) contract, excluding VAT, for optimisation and development of Lot 2 (Lanner-Kjorholt). The stretch between Langangen - Rugtvedt for the new E18 motorway. Contact Nye Veier, attn Ruben Ramsland, Kristiansand, email ruben.ramsland@nyeveier.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=455279-2022. Ref.n. 224528. 33/22.  



Permalink

Norway, Troms County - no/246

Road




JIPv AS from Tomasjord secured the EUR88,455.00 contract, excluding VAT, for submarine tunnels consultant to be engaged in the Project Øyfast.  Contact the Norwegian Public Roads Administration, Region North, Bodo, Project Oyfast, tel +47 90768737, email kaisim@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=014473-2017. Ref.n. 16/125272. 03/17.




Permalink

Norway, Ostfold county - no/245

Road

Closing Date: 30.01.2017 (Tender Closed)


Open invitation to tender, deadline 30.01.2017, for operation and maintenance assignments related to electrical installations on National and County roads includes the Ostfold tunnel.

Contract duration from 1.9.2017 to 31.8.2022. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/149954. Contact  the Norwegian Public Roads Administration, Eastern Region, attn Petter Ostli Skorem, Lillehammer, tel +47 92651803, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=429387-2016. Ref.n. 16/80154. 49/16.




Permalink

Traftec AS from Grimstad secured the contract for operation and maintenance assignments related to electrical installations on National and County roads which include the Ostfold tunnel.

Contact the Norwegian Public Roads Administration, Eastern Region, attn Petter Ostli Skorem, Lillehammer, tel +47 92651803, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=129634-2017. Ref.n. 16/80154. 14/17.



Permalink

Norway, Finnmark - no/244

E69 Motorway

Closing Date: 29.04.2016 (Tender Closed)


Open invitation to tender, deadline 29.04.2016, for the purchase of broadcasting systems for DAB and FM in the North Cape (Nordkapp) tunnel which is 6870 meters in length  on the E69. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/142134. Contact the Norwegian Public Roads Administration, Northern Region, att.n Sten-Arne Johnsen, Alta, tel +47 41221191, e-mail sten-arne.johnsen@vegvesen.no. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106158-2016. Ref.n. 16/40453. 13/16.




Permalink


Restricted invitation to tender, deadline 23.05.2018, for the new Skarvberg tunnel (3470 m) with 2 traffic lanes and a foot and cycle path on the E69. Approx. 500 m of new road shall be built on the south side of the tunnel, and 2 820 m of road on the north side. For electronic access to information http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=210004&B=VEGVESEN where offers must be sent. Contact the Norwegian Public Roads Administration, attn. Hanne Seljesæter, Oslo, email hanne.seljesaeter@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=178016-2018. Ref. n. 8/85089. 17/18.




Permalink


Skanska Norge AS from Oslo secured the EUR63.38 million contract for the new Skarvberg tunnel (3470 m) with 2 traffic lanes and a foot and cycle path on the E69. Approx. 500 m of new road shall be built on the south side of the tunnel, and 2820 m of road on the north side. Contact the Norwegian Public Roads Administration, attn. Hanne Seljesæter, Oslo, email hanne.seljesaeter@vegvesen.no. Visit https://www.vegvesen.no/Europaveg/e69skarvbergtunnel/nyhetsarkiv/signerte-for-viktig-vegtunnel-i-nord

and

https://www.skanska.no/hvem-vi-er/media/pressemeldinger/228819/Skanska-bygger-E69-Skarvbegtunnelen.

Ref. n. 8/85089. 03/19.




Permalink

Norway, Vestfold - no/243

Road

Closing Date: 08.11.2016 (Tender Closed)

Open procedure, deadline 08.11.2016, for  the delivery of a draft project for an underwater tunnel that connects the mainland from Notteroy and Tjome. The estimated value of the procurement is EUR222,859. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/148083.

Contact the Norwegian Public Roads Administration Southern, attn Steinar Aspen, Arendal, tel +47 02030, e-mail steinar.aspen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339926-2016. Ref. 16/75149. 40/16.



Permalink

Norway, Nordland - no/242

Railway

Closing Date: 09.10.2016 (Tender Closed)

Negotiated invitation to tender, deadline 9.10.2016, for railway engineering for the new Djupvik passing loop which will be built on the Ofoten Line, east of central Narvik. The Djupvik passing loop, will be on a stretch of rail from the 7.8km to the 9.3km marker. This is where the main track will go through a single track tunnel. The contract includes the following: construction of turnouts, construction of new track in tunnels, construction of new overhead lines and construction of exterior signaling. Part of the work will have to take place close to the existing train tracks. The duration of the contract is from the 08.05.2017 to 18.12.2017. The value of the contract ranges from EUR 4.38 to 6.57 million, excluding VAT.  For electronic access to information and electronic submission of tenders and requests to participate click here http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=171626&B=JERNBANEVERKET. Also contact the Norwegian National Rail Administration, att.n Kristin Simonsen, Oslo, tel +47 91616110, e-mail kristin.dahlin.simonsen@jbv.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=329261-2016. Ref.n. 201608671. 39/16.



Permalink

Norway, More & Romsdal - no/241

Road

Closing Date: 30.08.2016 (Tender Closed)


Open invitation to tender, deadline 30.08.2016, for the procurement of seismic tomography and seismic refraction in the sea, on the county Fv 659 Nordoy road. The Nordoy road will provide the islands Haroya/Finnoya, Fjortofta, Flemsoya/Haramsoya and Lovsoya a mainland connection with one long bridge and three submarine tunnels: Hestoya–Austnes (Haramsoya), length  3.5 km; Longva (Skuloya/Flemsoya)–Stongnes (Fjortofta), length 5.6 km and Kongsnes (Fjortofta)–Myklebust (Haroya), length 3.4 km.

This is to supplement surveys in order to reduce the uncertainty within the project. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/145855.  For futher information contact the Norwegian Public Roads Administration, Region Mid-Norway, attn Marianne Naro, Alesund, e-mail marianne.naro@vegvesen.no. Tenders to be sent to the Norwegian Public Roads Administration, Region Mid-Norway, attn Agnethe Helen Gronvik, Alesund, e-mail agnethe.gronvik@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231112-2016. Ref. 16/95318. 28/16.




Permalink


Geomap Norge AS from Frogner secured the EUR303,534 contract, excluding VAT,  for the procurement of seismic tomography and seismic refraction in the sea, on the county Fv 659 Nordoy road. The Nordoy road will provide the islands Haroya/Finnoya, Fjortofta, Flemsoya/Haramsoya and Lovsoya a mainland connection with one long bridge and three submarine tunnels: Hestoya–Austnes (Haramsoya), length  3.5 km; Longva (Skuloya/Flemsoya)–Stongnes (Fjortofta), length 5.6 km and Kongsnes (Fjortofta)–Myklebust (Haroya), length 3.4 km. This is to supplement surveys in order to reduce the uncertainty within the project. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/145855.  Contact the Norwegian Public Roads Administration, Region Mid-Norway, attn Marianne Naro, Molde, +47 02030, e-mail firmapost-midt@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=353036-2016. Ref. 16/95318. 41/16.




Permalink


Prior information notice without call for competition for an information meeting for the contractors for the procurement of county road 659 Nordoyvegen. The assignment will be divided into several contracts. The plan is to announce the preparatory contracts in June 2017. The main contracts are planned to be announced in January/February 2018. In addition, there will be a turnkey contract for electrical work in 2019.


Lot 5, Skjeltene-Fjørtofta, includes  Haramsfjord tunnel, from Hestøya-Austnes length 3 500  and Nogvafjord tunnel, from Longva at Flemsøya-Fjørtofta, length 5 730 m.


Lot 6, Fjørtofta-Harøya includes Fjørtoftfjord tunnel, from Fjørtofta-Myklebust at Harøya, length 3 680 and environment tunnel at Fjørtofta, length 170 m.


The meeting will be held o 04.04.2017, 12:00 -14:00, at Sandøyhagen, Skulevegen 28, 6487 Harøya. Registration for the meeting is to be sent by 28.3.2017 by email to kathrine.beite@vegvesen.no.


Contact the Norwegian Public Roads Administration, Region Mid-Norway, attn Kathrine Beite, Molde, tel +47 95944815, email kathrine.beite@vegvesen.no. Visit http://ted.publications.eu.int/udl?request=Seek-deliver&language=en&docid=072201-2017. Ref.n. 15/204310. 09/17.




Permalink

Open invitation to tender, deadline 31.08.2017, for the cuttings at Austnes and Longva to be established with a portaling area for tunnel work for the Haramsfjord (3500 m) and Nogvafjord (5730 m) tunnels in  Haramsoya and Skuloya/Flemsoy which are in the Haram municipality (Contract 2). The site is a part of the county road Fv 659 Nordoyvegen which will provide a mainland connection to Lepsoya, Haramsoya, Skuloya/Flemsoya, Fjortofta Haroya and Finnoya with a bridge and three undersea tunnels. Duration of the contract is until 08/03/2018. For procurement documents go to http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=188983&B=VEGVESEN  where tenders or requests to participate must be submitted electronically.  For further information contact the Norwegian Public Roads Administration, Region Mid-Norway, Molde, email firmapost-midt@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238610-2017. Ref. 17/20345. 26/17.



Permalink

Open invitation to tender, deadline 04.09.2017, for the cutting to be established with a portaling area for the tunnel work for the Nogvafjord (5730 m) and Fjortoftfjord (3680 m) tunnels at Fjortofta in Haram municipality (Contract 3). The site is a part of county road Fv 659 Nordoyvegen. Duration contract until 01/03/2018. For procurement documents http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=188902&B=VEGVESEN  where tenders or requests to participate must be submitted electronically.  For further information contact the Norwegian Public Roads Administration, Region Mid-Norway, Molde, email firmapost-midt@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238614-2017. Ref. 17/20347. 26/17.



Permalink

Open invitation to tender, deadline 07.09.2017, for the cuttings to be established with a portaling area for tunnel work for the Fjortoft tunnel (3680 m ) at Myklebus (Haroya) in Sandoy municipality. The site is a part of county road Fv 659 Nordoyvegen, which will provide a mainland connection to Lepsoya, Haramsoya, Skuloya/Flemsoya, Fjortofta Haroya and Finnoya. The duration of the contract is until 20/02/2018. For procurement documents visit  http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=188883&B=VEGVESEN  where tenders or requests to participate must be submitted electronically.  For further information contact the Norwegian Public Roads Administration, Region Mid-Norway, Molde, email firmapost-midt@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=238615-2017. Ref. 17/20354. 26/17.



Permalink

Prior information notice for works directive  2014/24/EU  - 2017/S 212-441608. The county road 659 Nordøyvegen, is a mainland connection that will connect the Nordøy islands in Sunnmøre to the mainland, via undersea tunnels and bridges. Nordøyvegen will give a ferry free road connection to Lepsøya, Haramsøya, Skuløya/Flemsøya and Fjørtofta in Haram municipality and Harøya in Sandøy municipality in Møre og Romsdal. The contracting authority is Statens vegvesen for further information call  Torbjørn Vatnehol on  +47 97714119 or e-mail: torbjorn.vatnehol@vegvesen.no  or Arild Fuglseth at  Møre og Romsdal Fylkeskommune  email post@mrfylke.no

https://www.vegvesen.no/Fylkesveg/fv659nordoyvegen

Address of the buyer profile: https://kgv.doffin.no/ctm/Company/CompanyInformation/Index/1111

The Skjeltene — Harøya contract consists of the following main elements;

— Lepsøy bridge, 800 m long high bridge from Skjeltene on the mainland over the shipping lane to the sea filling by Lauka and Hestøya.

 The bridge is being announced with two main alternatives; concrete cantilevered bridge and a concrete bridge with a steel box in the superstructure.

— Lauke bridge, 109 m long concrete slab bridge with 3 spans.

— Hamnaskjersund bridge, 200 m long concrete slab bridge with 7 spans.

— Haramsfjordt tunnel, from Hestøya to Austnes. Length 3 500 m, bottom point contour line -112

— Dam and temporary cofferdam at the tunnel entrance at Hestøya

— Nogvafjord tunnel, from Longva on Flemsøya to Fjørtofta. Length 5 730 m, bottom point contour line — 135

— Fjørtoftfjord tunnel, from Fjørtoft to Harøya. Length 3 680 m, bottom point contour line -118

— Burberg tunnel, environment tunnel at Fjørtofta. Length 170 m, of which approx. 60 m is rock and approx. 90 m is concrete

— Road on a sea filling over Lepsøyrevet, total length 2 735 m.

— Open air road not on the sea filling, total length 10 000 m

— Conduits and preparatory electro work along the entire stretch.

For further information click here http://ted.europa.eu/udl?uri=TED:NOTICE:441608-2017:TEXT:EN:HTML&src=0&tabId=1b .45/17.



Permalink

Open invitation to tender, deadline 07.05.2018, for the construction of the Skjeltene - Haroya section of the county road 659 Nordoy, including the tunnels .

Haramsfjordt (3500 m), Nogvafjord (5730 m), Fjortoftfjord (3680 m) and Burberg (170 m), Lot 5. For further information http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=201860&B=VEGVESEN.

A tender conference will be held on 27.2.2018 and 28.2.2018 at 10:15.

Contact the Norwegian Public Roads Administration, Region Mid-Norway, attn Ronnaug Bersas, Oslo, tel +47 02030, email  ronnaug.bersaas@vegvesen.no.Visit

http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=036138-2018.

Ref.n.17/210289. 06/18.



Permalink

Skanska Norge AS from Oslo secured the K5 Skjeltene-Haroya contract for the county Fv 659 Nordoy road. The EUR304,02 million contract includes the construction of the Haramsfjordt tunnel (3500 m) from Hestoya to Austnes, the Nogvafjord tunnel (5730 m) from Longva on Flemsoya to Fjortofta, and the Fjortoftfjord tunnel (3680 m) from Fjortoft to Haroya, Burberg tunnel (170 m). Contact the Norwegian Public Roads Administration, attn Ronnaug Bersaas, Oslo, +47 02030, email ronnaug.bersaas@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=013223-2019.

Ref. 17/210289. 03/19.



Permalink

The Norwegian Public Roads Administration invites suppliers, interested in K6 Electro Contract for all electro installations for county road 659 Nordoyvegen project, to participate in an information meeting to be held on the 25.4.2019 at 10:00 in the Skjeltene office. The contest will be announced on 27.05.2019. Registration for the meeting is to be sent before 04.04.2019, 15h00, to  elisabeth.bryne@vegvesen.no.  Please state the names of all participants, business name and email address. Contact the Norwegian Public Roads Administration, attn Ronnaug Bersaas, Oslo, tel +47 02030, email ronnaug.bersaas@vegvesen.no. Visit http://ted.publications.eu.int/udl?request=Seek-deliver&language=en&docid=

094147-2019. Ref.n. 19/36322. 10/19.



Permalink

Open invitation to tender, deadline 10.09.2019, for the turnkey contract K6 for electrical installations and automation installations in the Fv 659 Nordoyvegen project, a mainland road that will connect the Nordoyane at Sunnmore to the mainland, via submarine tunnels and bridges. Further information from http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=241726&B=VEGVESEN where tenders have to be sent. Contact the Norwegian Public Roads Administration, attn Ronnaug Bersaas, Oslo, tel +47 02030, email ronnaug.bersaas@vegvesen.no. Visit

http://ted.publications.eu.int/udl?request=Seek-deliver&language=en&docid=254281-2019.

Ref.n. 19/36322. 32/19.



Permalink

Norway, Nordland - no/240

Road

Closing Date: 11.07.2016 (Tender Closed)


Open invitation to tender, deadline 11.07.2015, for the construction, of the 3,230 m Tjernefjell tunnel including tunnel works and portals, as well as some roadworks on both side of the tunnel on the rv 77. The tunnel will be constructed with a cross section of T9,5. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/144388. A tender conference will be held 16.6.2016 (10:00). Meet at Saltdal Turistsenter. For registration to go to the tender conference should be sent by e-mail to grete.livik@vegvesen.no by 13.6.2016. Contact the Norwegian Public Roads Administration, Region North, attn Grete Livik, Bodo, tel +47 41422644, e-mail grete.livik@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188134-2016. Ref. 16/71675. 23/16.




Permalink