On 04.12.2013 final breakthrough was achieved on the Pale tunnel (2,319 m - 2,045 m) in Scopoli, Foligno municipality on SS77 Val di Chienti in Italy.
More Information
General contractor Val di Chienti has reported new breakthroughs on SS77, Quadrilatero Marche Umbria project.
More Information
On 20.09.2012 breakthrough was achieved on the 2,182 m north tube of the SS77 Cupigliolo tunnel in Foligno municipality on Marche-Umbria quadrilateral in Italy.
More Information
On 03.04.2012, breakthrough was achieved on the 2,834 m south tube of the SS77
More Information
On 26.03.2012, breakthrough of the 3,472 m south tube was achieved on the SS77 Varano tunnel in Serravalle del Chienti municipality
More Information
On 28.02.2012, breakthrough of the 2,820 m north tube was achieved on the SS77 Sostino tunnel in Foligno municipality on Marche-Umbria quadrilateral in Italy
More Information
On 17.02.2012, breakthrough of the 980 m south tube was achieved on the SS77 La Rocchetta tunnel in Muccia municipality on Marche-Umbria quadrilateral in Italy. Excavation took one year. The 840 m ...
More Information
Italian breakthroughsOn 24.10.2011 breakthrough was achieved on the north tube of the Collemaggio tunnel, located between km9.244 and km10.036 on the SS318. Two days later, another tunnel holed out ...
More Information
Breakthrough in SS77 Belfiore tunnelOn 26.09.2011 breakthrough was achieved on the South carriageway of the 1,101 m-long Belfiore tunnel on the SS77 Val di Chienti. For more click here and it/116. ...
More Information
Breakthroughs at Marche-Umbria quadrilateralOn 20.07.2011 breakthrough was achieved in Genga municipality on the SS76 tunnels Valtreara (846 m with 388 m in cut/cover) and Gattuccio (294.50 m with ...
More Information