Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Innsbruck-Kufstein - at/47

High Speed Railway

Preinformation notice for engineering services of a total railroad section of 41 km, including tunnel plans. Tender value of €4.45 million. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 29, document 22164-2002 or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail bw@beg.co.at 08/02.Preinformation notice for the planning of water supply for fire-fighting in tunnel sections. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028647-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03.Negotiated procedure, deadline 5th April, 2007 for measurement of vibration propagation at the sites of the dual-track tunnels on the Lower Inn valley line. The total length of tunnels is 35 km. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=50576-2007, OJ S 41, or contact Brenner Eisenbahn, Innsbruck, tel. +43 51253090. E-mail bwd@beg.co.at 11/07.COWI landed a EUR550,000 contract for measurement of vibration propagation at the sites of the dual-track tunnels on the Lower Inn valley line. The total length of tunnels is 35 km. Visit www.cowi.dk 47/07.A consortium named AS194 Bahntechnik led by Bernard Ingenieure, with Elbas and Systra as partners, secured a EUR5.6 million contract covering the management of planning and coordination of the executive planning of the entire signalling, telecommunication systems and energy supply for the tunnel sections (approx. 32 km) on the Kundl/Radfeld-Baumkirchen section of the Lower Inn valley railway. Click at/44 & at/45. Visit www.bernard-ing.com, www.elbas.ch and www.systra.com 48/07.



Permalink

Negotiated invitation to tender, deadline 07.09.2015, for equipment maintenance in tunnels on the new railways Vienna-St. Polten, Innsbruck-Kufstein in Unterintal and Koralm. The contract is composed of six lots of duration 01.01.2016 to 31.12.2018, with a optional extension to 31.12.2020. Contact OEBB-Infrastruktur AG, represented by OEBB Business Competence Center GmbH, att.n Florian Fuehrer, Vienna, tel +43 19300032927, e-mailflorian.fuehrer@oebb.at. For electronic access www.oebb.at/m2c. Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291490-2015. Ref.n. 2015/M2C ID-N.3723. 34/15.




Permalink


Negotiated to tender, deadline 26/09/2022, for the preparation, implementation, evaluation and presentation of all geotechnical measurements (surface and underground) required for the construction of the rescue tunnel, parallel to the planned driving tunnel, In the Angerberg area on the approx. 20.5 km long Schächtenau - Radfeld node" section, part of the northern approach to the Brenner Base Tunnel (BBT). Click here for tender documents where tenders must be sent. Duration of the contract will be 35 months. Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=474935-2022. Ref.n. PROVIA ID86349. 35/22. 

 




Permalink

 

Negotiated to tender, deadline 21/03/2022, for the construction of the 2.6 km Angath tunnel (Lot T4.2) on the approx. 20.5 km long Schaftenau - Radfeld section, part of the northern access route to the Brenner Base Tunnel (BBT). Click here for tender documents where tenders must be sent. Duration of the contract will be 22 months. Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=064259-2022. Ref.n. PROVIA n. 76146. 05/22. 

 




Permalink


Negotiated to tender, deadline 05/09/2022, for all services required for the implementation / processing of the 2.6km Angath tunnel construction project, such as deadline and cost tracking, quality monitoring, measurement and billing, application of the BIM methodology. The tunnel on the 20.5km Schaftenau - Radfeld section is part of the expansion project to four tracks of the northern access route to the Brenner Base Tunnel (BBT). Click here for tender documents where tenders must be sent. Duration of the contract will be from 06/02/2023 to 06/04/2026. Contact OEBB -Infrastruktur AG, attn Markus Testorm, Vienna, tel +43 6648140077, email markus.testor@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=445939-2022. 35/22. 

 




Permalink


Negotiated to tender, deadline 05/09/2022, for the geological, hydrogeological and geotechnical measurement accompanying the construction of the 2.6km Angath tunnel on the 20.5km Schaftenau - Radfeld section, part of the expansion project to four tracks of the northern access route to the Brenner Base Tunnel (BBT). Click here for tender documents where tenders must be sent. Duration of the contract will be 36 months. Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=419249-2022. Ref. PROVIA n. 85082. 35/22. 

 




Permalink


Negotiated to tender, deadline 19/10/2022, for geological documentation and consultancy (Lot T4.2) for the construction of the 2.6 km Angath tunnel of OEBB Infrastructure AG in the municipality of Angath, on the approx. 20.5 km long Schaftenau - Radfeld section, part of the northern access route to the Brenner Base Tunnel (BBT). Click here for tender documents where tenders must be sent. Duration of the contract will be 12 months. Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=536429-2022. Ref.n. PROVIA n. 85865. 39/22. 

 




Permalink


The Joint Venture VSP Stolitzka & Partner Ziviltechniker GmbH (Vienna)/AVD Vermessung ZT GmbH (Dornbirn) secured the EUR1.32 million contract, excluding VAT, for the preparation, implementation, evaluation and presentation of all geotechnical measurements (surface and underground) required for the construction of the rescue tunnel, parallel to the planned driving tunnel, In the Angerberg area on the approx. 20.5 km long Schaftenau - Radfeld  section, part of the northern access route to the Brenner Base Tunnel (BBT). Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098758-2023. Ref.n. PROVIA n.86349. 10/23.  



Permalink


The Joint Venture Östu-Stettin Hoch- und Tiefbau GmbH (Leoben)/BeMo Tunneling GmbH (Innsbruck) secured the EUR47.56 million contract, excluding VAT, for the construction of the 2.6 km Angath tunnel (Lot T4.2)  on the approx. 20.5 km long Schaftenau - Radfeld section, part of the northern access route to the Brenner Base Tunnel (BBT).Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100128-2023. Ref.n. PROVIA n. 76146. 10/23. 



Permalink


The Joint Venture Geoconsult ZT GmbH (Puch bei Hallein)/3G Gruppe Geotechnik Graz ZT GmbH (Seiersberg-Prika)/Boley Geotechnik GmbH (Munich) have secured the EUR3.87 million contract, excluding VAT, for the geological, hydrogeological and geotechnical measurement accompanying the construction of the 2.6km Angath tunnel on the 20.5km Schaftenau - Radfeld section, part of the expansion project to four tracks of the northern access route to the Brenner Base Tunnel (BBT). Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105792-2023. Ref. PROVIA n. 85082. 10/33. 



Permalink


The Joint Venture Geoconsult ZT GmbH ( Puch bei Hallein)/3G Gruppe Geotechnik Graz ZT GmbH (Graz-Seiersberg)  secured the EUR711,400 contract, excluding VAT, for geological documentation and consultancy (Lot T4.2) for the construction of the 2.6 km Angath tunnel of OEBB Infrastructure AG in the municipality of Angath, on the approx. 20.5 km long Schaftenau - Radfeld section, part of the northern access route to the Brenner Base Tunnel (BBT). Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=128931-2023. Ref.n. PROVIA n. 85865. 10/23. 



Permalink


The Joint Venture ILF Consulting Engineers Austria GmbH (Rum)/3G Gruppe Geotechnik Graz ZT GmbH (Dornbirn) secured the EUR2.69 million contract, excluding VAT, for all services required for the implementation / processing of the 2.6km Angath tunnel construction project, such as deadline and cost tracking, quality monitoring, measurement and billing, application of the BIM methodology. Contact OEBB -Infrastruktur AG, attn Markus Testorm, Vienna, tel +43 6648140077, email markus.testor@oebb.at.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130027-2023. 10/23. 



Permalink


Negotiated invitation to tender, deadline 27/09/2023, for the planning of the OBW tunnel (Angerberg Tunnel East), part of the Schaftenau - Radfeld junction project. The service is divided into two phases: main contract and 1 option. Click here for tender/bid documents where tenders must be sent. Duration of the contract will be 34 months. Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at.  Visit https://ted.europa.eu/en/notice/-/detail/542506-2023.   Ref. PROVIA n.103760. 36/23.




Permalink


The Joint Venture Ingenieure Öhlinger + Partner ZT Ges.m.b.H. and ILF Consulting Engineers Austria GmbH secured the EUR3.17 million contract, excluding VAT, for the planning of the OBW tunnel (Angerberg tunnel East), part of the Schaftenau - Radfeld junction project. Contact OEBB -Infrastruktur AG, Vienna, tel +43 664 6175641email robert.schoepf@oebb.at.  Visit https://ted.europa.eu/en/notice/-/detail/75178-2024. Ref.n. Provia n.103760. 06/24. 



Permalink