The Joint Venture Östu-Stettin Hoch- und Tiefbau GmbH (Leoben)/BeMo Tunneling GmbH (Innsbruck) secured the EUR47.56 million contract, excluding VAT, for the construction of the 2.6 km Angath tunnel (Lot T4.2) on the approx. 20.5 km long Schaftenau - Radfeld section, part of the northern access route to the Brenner Base Tunnel (BBT).Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100128-2023. Ref.n. PROVIA n. 76146. 10/23.