The Joint Venture VSP Stolitzka & Partner Ziviltechniker GmbH (Vienna)/AVD Vermessung ZT GmbH (Dornbirn) secured the EUR1.32 million contract, excluding VAT, for the preparation, implementation, evaluation and presentation of all geotechnical measurements (surface and underground) required for the construction of the rescue tunnel, parallel to the planned driving tunnel, In the Angerberg area on the approx. 20.5 km long Schaftenau - Radfeld section, part of the northern access route to the Brenner Base Tunnel (BBT). Contact OEBB -Infrastruktur AG, Vienna, email robert.schoepf@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098758-2023. Ref.n. PROVIA n.86349. 10/23.