Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Denmark

Denmark, Copenhagen - dk/12

Metro

COMET jv driving 3.5 km of tunnels using NFM TBMs; 1 km NATM; and 500 m cut-and-cover. March 1999.NFM reports its two 5.71 m-diameter EPBs have recorded best day of 53 m, best week of 154 m, and best month of 567 m on 5 day/week production. Visit www.framatome.fr October 2000.Negotiated procedure, deadline 4th December, 2006 for engineering related to multi-disciplinary civil works (MCW) and multi-disciplinary transportation systems (MTS) for the Copenhagen metro's Circle Line. These two notices to prequalify for the two main consultancy assignments mark the commencement of preparatory actions handled by Orestad Development. Six teams of consultants are expected to be prequalified for each assignment before Christmas. They will then be asked to submit tenders by February 2007 and consultancy contracts are expected to be completed by July for immediate commencement of the work. At the same time the legal acts behind the Circle Line project are being processed by the Danish Parliament. The present planning basis for the project is the preliminary studies completed and reported by May 2005, which are made public by the Ministry of Transport and Energy. The reports can be downloaded (in Danish) from www.m.dk under "Om metro", "Cityring", "Hent materiale".Both consultants will be the owner's consultant through the design and procurement phases including design follow-up during construction. The MCW consultant will act on civil works, building works and related road works, i.e. all tunnel and stations. The MTS consultant will act on all railway system facilities, the rolling stock and the control and maintenance centre (CMC).The Circle Line is 15.5 km long, all underground double tunnel plus 1 km connection tunnel to the CMC, also double tube. The diameter is expected to be 4.9 m identical to the present Copenhagen metro tunnel diameter. There will be 17 stations, all underground. Tunnelling will be, to the possible extent, within the Copenhagen limestone, but it will have to pass areas of different geology at some sections. TBMs are anticipated for tunnelling. Precast concrete segments were applied for the present metro tunnel within the same type of geology. Contractors are expected to be invited to prequalify in late 2008. The planned construction start is scheduled by 2010, for service by 2018. Approved budget is DKK15 billion with a 50% probability. For the MCW engineering contract, visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213057-2006, OJ S 200, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. For the MTS engineering contract, visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=213058-2006, OJ S 200, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. E-mail asj@orestad.dk or pba@orestad.dk. Read E-News Weekly 49/2004. 44/06.Negotiated procedure, deadline 24th November, 2006 for a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings. A further 50-100 borings down to 10 m will focus on sampling of environmental information. The programme shall be executed during 2007 and reported in two stages in geotechnical data reports which will be made available to the consultants for the Circle Line project. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=219804-2006, OJ S 206, or contact Orestadsselskabet, Copenhagen, fax +45 33112301 or 39661060. E-mail asj@orestad.dk or pba@hifab.dk. Read E-News Weekly 49/2004. 45/06.The five prequalified consortia for the civil works engineering for the City ring line, Copenhagen metro's Circle Line, are: City Ring Consultants including Carl Bro, FaberMaunsell, and Niras; Cowi, Arup, and Systra; LSI Metro Group including ISC, ILF, and Setec; Parsons Brinckerhoff, teaming with Sweco, DE-Conscult, Erik K. Jí¸rgensen, Al-Gruppen, and Skaarup & Jespersen; and Rambí¸ll allied with Atkins.The five prequalified consortia for the transportation systems engineering are City Ring Consultants including Carl Bro, FaberMaunsell, and Niras; Cowi, Arup, and Systra; MottMacDonald, ISC, Hansen & Hennberg, Setec, and Interfleet; Parsons Brinckerhoff, teaming with Sweco, DE-Consult, Erik K. Jí¸rgensen, Al-Gruppen, and Skaarup & Jespersen; and Rambí¸ll allied with Atkins.Bids will be submitted on 20th March, 2007. Contract awards are expected in June 2007. Click dk/12. Read E-News Weekly 49/2004. Visit www.m.dk/en/construction/future.htm 07/07.GEO and Per Aarsleff have been contracted to undertake a series of deep borings for sampling of geotechnical information along the alignment and at station and shaft locations of the planned Circle Line. The programme considers 150-200 borings down to 50 m. Pumping tests will be made from a number of these borings. A further 50-100 borings down to 10 m will focus on sampling of environmental information. The programme shall be executed during 2007 and reported in two stages in geotechnical data reports which will be made available to the consultants for the Circle Line project. Plans for the City Circle Line were approved by the Danish Parliament on 1st June, 2007. Then the project will move to the project basis and conceptual design stage with tenders planned in two years and construction with tenders scheduled in three years. Read E-News Weekly 50/2005 & 49/2004. Visit www.m.dk/om_metro/anlaeg/etape4/geoteknik.htm, www.geo.dk and www.aarsleff.com 35/07.A joint venture of COWI, Arup and Systra won the engineering contract for the multi-disciplinary civil works (MCW) for the circle line in Copenhagen. A joint venture of Ramboll, Atkins Denmark and Atkins UK pocketed the engineering contract for multi-disciplinary transportation systems (MTS) for the same line. The total amount of these two contracts over a 10-year period is in the DKK400-600 million range. Read E-News Weekly 49/2004. Visit www.cowi.dk, www.arup.com, www.systra.com, www.ramboll.dk, www.atkinsglobal.com and www.m.dk 43/07.Metroselskabet has signed a contract with LE34 for surveying for the circle line project in Copenhagen. Visit www.le34.dk 23/08.



Permalink

Contract award, value EUR1.7 billion, to Copenhagen Metro Team JV comprising Salini Costruttori SpA/Tecnimont/Seli for construction of Copenhagen Cityringen metro comprising twin 17.4 km tunnels and 17 stations at 30 m depth. More information from Salini, tel +39 0667762-78, fax -24. Works commence immediately for completion 2018 using four EPB TBMs. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=028236-2011. 04/11.



Permalink

Invitation to tender using negotiated procedure, deadline 26.03.2012, for design of Nordhavnen metro as a branch of Cityringen with first 1.9 km in twin bored tunnel followed by 350 m-long ramp in cut/cover. Includes one underground station and one surface station. Contract duration 84 months. Further information from www.hifab.dk/aktuelle_udbud. Specs and docs from Carsten Larsen in Soeborg, tel +45 39661014, e-mail hifab@hifab.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=063522-2012. 09/12.

 



Permalink

Award of contract value EUR2.47 million to Ramboll/Arup JV of Copenhagen for design of Nordhavnen metro as a branch of Cityringen with first 1.9 km in twin bored tunnel followed by 350 m-long ramp in cut/cover. Includes one underground station and one surface station. Further information from www.hifab.dk/aktuelle_udbud and aec@ramboll.dk, tel +45 51611000. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=271078-2012. NUTS code DK01. 35/12.



Permalink

Invitation to tender using negotiated procedure, deadline 15.02.2013, for supply of two TBMs and boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe. Contract duration 36 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information, specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=401851-2012. 51/12.



Permalink

Additional information on TBMs diameter, to be delivered after award of the negotiated procedure, deadline 15.02.2013. The two TBMs will bore 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe. Contact Mikkel Kjaer Jensen at Metroselskabet I/S, Copenhagen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=036012-2013. 06/13.



Permalink

The awarding procedure for supply of two TBMs and boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe has been discontinued. Contact Mikkel Kjær Jensen, Metroselskabet I/S, Metrovej 5, Copenaghen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=089589-2013. 12/13.



Permalink

Invitation to tender using negotiated procedure, deadline 13.05.2013, for contract CRNH1 & 2 tunnelling and underground civil works including boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe and associated works. Contract duration 60 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information from Mikkel Kjaer Larsen, e-mail mkj@m.dk. Specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092759-2013. NUTS code DK011. 12/13.



Permalink

Invitation to tender using negotiated procedure, deadline 22.04.2013, for architectural finishes at 17 underground stations on Cityringen. Contract value EUR70 million, duration 62 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information from Tom Kai Christensen, e-mail tkc@m.dk. Specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096253-2013. 13/13.



Permalink

Invitation to tender using negotiated procedure, deadline 15.05.2013, for contract CRNH4 concerning transportation systems works for Cityringen branch off to Nordhavnen. The design and built contract includes permanent way, traction power and power supply. Contract duration 60 months. Information about procurement process from http://www.bascon.dk/da/unbud. Further information from Mikkel Kjaer Jensen, e-mail mkj@m.dk. Specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=092627-2013. 13/13.



Permalink

Additional information about languages to be used for invitation to tender using negotiated procedure, deadline 15.05.2013, for contract CRNH4 concerning transportation systems works for Cityringen branch off to Nordhavnen. Contact Metroselskabet I/S, Metrovej 5, att.n Mikkel Kjaer Jensen in Copenhagen, tel +45 724245772, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135418-2013. 17/13.



Permalink

Additional information about languages to be used for invitation to tender using negotiated procedure, deadline 13.05.2013, for contract CRNH1 & 2 tunnelling and underground civil works including boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe and associated works. Contact Metroselskabet I/S, Metrovej 5, att.n Mikkel Kjaer Jensen in Copenhagen, tel +45 724245772, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=135441-2013. 17/13.



Permalink

Systemair has been selected by CMT Company (Copenhagen Metro Team) for the supply of the tunnel fans and allied equipment for the emergency ventilation system for the new metro line in Copenhagen, the Cityringen. Value of contract approximately EUR 4.5 million. The new line will consist of a twin tube tunnel 17.4 km in length, with 17 new stations located 30 m below ground level. The line will be fully automated and run 24 h/day. Read the press release. Visit http://www.systemair.com/it/Italia/Soluzioni/Tunnel-and-Metro/. 37/13.



Permalink

The Danish public transportation company Metroselskabet I/S awarded to JV Zublin A/S (60 percent)/Hochtief (40 percent) the EUR150 million contract for Copenhagen’s new metro line between Ostersogade and the new Nordhavn metro station, part of the City Circle Line in the Danish capital. The contract involves the design and construction of twin TBM tunnels, lengths 1,800 m and 1,600 m,  the 80 m Nordhavn subway station, a small tunnel, a ramp structure, a service shaft/emergency exit and a pedestrian transfer tunnel to the existing S-train urban rail station Nordhavn. The contract includes the installation works. The design of the project will start immediately; the first construction works will begin in late 2014. Final handover to Metroselskabet will be in 2019. Visit http://www.zueblin.de and http://www.hochtief.com. 24/14.



Permalink

Award of contract CRNH12 to MetNord (a JV of Zueblin A/S and Hochtief Solution AG) of Trige, Denmark for tunnelling and underground civil works including boring of 2 x 1.8 km-long tunnels of internal diameter 4.9 m between Nordhavnen and the bifurcation chamber at Cityringen located under Sortedams Soe and associated works. Contract duration 60 months. Further information from Mikkel Kjaer Larsen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=219864-2014. NUTS code DK011. 27/14.



Permalink

Invitation to tender using negotiated procedure, deadline 18.08.2014, for consultancy services in relation to Cityringen - branch off to Ny Ellebjerg via Sydhavnen. The new section will include a 3.5 km-long bored tunnel, a cut/cover tunnel and five stations, perhaps all underground. Contract duration 96 months from award. Time limit for receipt of requests for documents or for accessing documents: 17.08.2014. Further information, specs and docs from Carsten Larsen at Bascon A/S in Hellerup, tel +45 39661014, e-mail cla@bascon.dk, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223329-2014.Ref.n. 2014072111. 27/14.



Permalink

Award of contract CRNH4 to Ansaldo STS spA of Rome, Italy, for transport systems works from bifurcation chamber at Cityringen, located under Lake Sortedams Soe, to the Orient Kaj station. Further information from Mikkel Kjaer Larsen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279294-2014. NUTS code DK011. 33/14.



Permalink

JV Cowi/Systra of Kongens Lyngby secured the contract for consultancy services in relation to Cityringen - branch off to Ny Ellebjerg via Sydhavnen. The new section will include a 3.5 km-long bored tunnel, a cut/cover tunnel and five stations, perhaps all underground. Contact Metroselskabet I/S, attn Mikkel Kjaer Jensen, Copenhagen, tel +45 72424572, e-mail mkj@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008607-2015. Ref.n. 2014072111. 03/15.



Permalink


Zublin A/S from Trige secured contract T4 2which is for the transfer tunnel from the Osterport Station on the City Circle Line (Cityringen) to the existing Osterport Station at Copenhagen. For further information please contact Metroselskabet I/S at Copenhagen, email procurement@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056971-2017. 07/17.




Permalink

NCC Danmark A/S from Soborg secured contract T6 for the transfer tunnel from the Kongens Nytorv  Station on the City Circle Line (Cityringen) to the existing Kongens Nytorv Station at Copenhagen. For further information please contact Metroselskabet I/S, attn Johan Storgaard, Copenhagen, email procurement@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056971-2017. 07/17.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056342-2017. 22/17.



Permalink

Aarsleff Bane & Anlæg I/S from Viby J secured Contract T7 which is for the transfer tunnel from the upcoming Cityring metro station to Copenhagen Central Station, this includes the lift shaft from the tunnel to the luggage center. For further information please contact Metroselskabet I/S in Copenhagen, email procurement@m.dk.  Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=149634

-2018. Ref.n. OMS-T7. 15/18.



Permalink

Aarsleff RailA/S from Hvidovre secured Contract T5 which is for the transfer tunnel from the upcoming Cityring metro station to the existing  Norrebro railway station. For further information please contact Metroselskabet I/S from Copenhagen, email procurement@m.dk.  Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=149633 -2018. Ref.n. OMS-T5. 15/18.



Permalink


Competitive dialogue, deadline 08/11/2022, for the Osthavn Metro line, Consultancy Environmental Impact Assessment (EIA), Concept- and Reference Design and Utilities. Osthavn M5 will be a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholmen, Refshaleoen and Kloverparken with the existing city and transport network. Currently, there are 2 possible main scenarios for the alignment of M5.  

M5 Orange via Amagerbrogade– from København Hovedbanegard (Kh) to Lynetteholm via Amager, with possibilities to extend to Osterport (KK) or Nordhavn: Lot 1, value EUR 27.83 million (DKK207million), excluding VAT; duration of the contract will be 140 months. 

M5 Purple from Lynetteholm to Prags Boulevard Ost via Kk, Kh and following the same alignment than M5 Orange between Kh and Prags Boulevard OstAmager: Lot 2, value EUR 46.38 million (DKK345 million), excluding VAT; duration of the contract will be 140 months. 

For tender documents please click here, where tenders must be sent. 

Contact Metroselskabet I/S, attn Vibeke Jessen, Copenhagen , email vij@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=ent&docid=570370-2022, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=557691-2022, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=359947-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123215-2022. 42/22. 

 

Denmark-Copenhagen: Architectural, construction, engineering and inspection services


2022/S 196-557691

Contract notice – utilities

Services

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Metroselskabet I/S
Postal address: Metrovej 5
Town: København
NUTS code: DK01 Hovedstaden
Postal code: 2300
Country: Denmark
Contact person: Vibeke Jessen
E-mail: vij@m.dk
Internet address(es):
Main address: www.metroselskabet.dk
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://app.byggeprojekt.dk/public/1856-M5_Oesthavn_Consultancy_Contract,_EIA,_Civil_works_design_and_utilities
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://app.byggeprojekt.dk/public/1856-M5_Oesthavn_Consultancy_Contract,_EIA,_Civil_works_design_and_utilities
I.6)Main activity
Urban railway, tramway, trolleybus or bus services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Østhavn Metro line, Consultancy Environmental Impact Assessment (EIA), Concept- and Reference Design


II.1.2)Main CPV code
71000000 Architectural, construction, engineering and inspection services
II.1.3)Type of contract
Services
II.1.4)Short description:


Østhavn M5 is a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholmen, Refshaleøen and Kløverparken with the existing city and transport network. Currently, there are 2 possible main scenarios for the alignment of M5.


M5 Orange via Amagerbrogade– from København Hovedbanegård (Kh) to Lynetteholm via Amager, with possibilities to extend to Østerport (KK) or Nordhavn. M5 Purple from Lynetteholm to Prags Boulevard Øst via Kk, Kh and following the same alignment than M5 Orange between Kh and Prags Boulevard ØstAmager.


Currently, Metroselskabet is awaiting a decision in regards to which of the two possible lines will be preferred.Thus, the contract is procured in two (2) lots(Lot 1: M5 Orange, Lot 2: M5 Purple). Once the political decision on which line to move forward has been made, Metroselskabet will cancel the lot not chosen, please refer to section II.2.4) and section VI.3.6).


II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: yes
Tenders may be submitted for all lots
II.2)Description
II.2.1)Title:


M5 Orange (Østhavn Metro line, Consultancy Environmental Impact Assessment (EIA), Civil Works Concept and Reference Design_M5 Orange


Lot No: 1
II.2.2)Additional CPV code(s)
71000000 Architectural, construction, engineering and inspection services
71300000 Engineering services
71310000 Consultative engineering and construction services
71330000 Miscellaneous engineering services
71311000 Civil engineering consultancy services
71311200 Transport systems consultancy services
71311230 Railway engineering services
71313400 Environmental impact assessment for construction
71317200 Health and safety services
71313000 Environmental engineering consultancy services
II.2.3)Place of performance
NUTS code: DK01 Hovedstaden
Main site or place of performance:


Copenhagen


II.2.4)Description of the procurement:


The new metro line M5 Østhavn will connect the new city development areas to the east of Copenhagen including Lynetteholmen, Refshaleøen and Kløverparken wit the existing city and transport network.


The project is divided into five phases:


Phase 1: Programme study (already completed)


Phase 2.1: Conceptual design (civil works) and EIA (this contract notice)


Phase 2.2: Reference design and production of construction contract documents (this contract notice)


Phase 3: Procurement and contracting (this contract notice)


Phase 4: Follow-up during the construction phase (Option 1, please refer to section II.2.11)


The main construction contract will be procured as a 'Design and Build' contract based on the reference design made by the consultant. There may also be further smaller construction contracts that are procured as construct only based on the consultants detailed design, for example advanced works.


The consultancy services consist of (the list is not exhaustive):


-EIA


-Design Management


-ICT Management


-Conceptual Design,


-Reference Design


-Develop and prepare the requirements for the construction contractor


-Prepare procurement strategy for the construction contract


-Development of BIM- model for all infrastructure elements


-Develop and prepare requirements for the contractors use of the BIM model


-Be in charge of the innovation process, develop idea-catalogue, prepare basis for decisions, time schedule etc.


-Prepare basis for decisions in regards, to the technical aspects of the project, e.i in regards to the innovation process, technical solutions, sustainability etc.


-Assistance to Metroselskabet during construction (option, please refer to section II.2.11)


Furthermore, the contract includes services such as preparation of reports, cost calculations, scheduling, produce drawings, 3D model files etc.


The design must include development of BIM models for all infrastructure elements in accordance with the requirements defined in the tender material. Metroselskabet has high ambitions in regards to BIM, and the consultant is expected to have a high level of experience and knowledge regarding BIM. In addition, Metroselskabet intends to collaborate with the consultant by using BIM/GIS, which also requires experiences working with BIM/GIS. Metroselskabet encourages the applicants to consider the requirements for the BIM services very carefully and if needed teaming up with specialists in working with BIM as sub-consultants.


During the design process the consultant must have a high focus on safety and the possible implications of their design. In addition, Metroselskabet has a high focus on minimizing the CO2 footprint, and the consultant is expected to develop an idea-catalogue as well as considering the possibilities identified by Metroselskabet for the design.


Innovation must be an integrated part of the design process. The process shall not only consider ideas already identified but also generate new ideas. Metroselskabet encourages the applicants to consider the innovation process very carefully and if needed consider teaming up with specialists in innovation processes as sub-consultants.


Metroselskabet strongly expects a decision on which alignment to be taken forward will be made during Q1 2023. If the decision on which alignment to move forward has not yet made when the deadline for submission of final tender response expires, the contract will not be awarded until such a political decision has been made. Metroselskabet reserves the right to purchase EIA for the not chosen line from the winning tenderer. Payment for the additional EIA will be negotiated based on the hourly rates offered by the winning tenderer. After completion of the EIA for both M5 Orange and M5 Purple, (if relevant) Metroselskabet reserves the right to exchange the originally chosen Metro line for the new chosen Metro line (phase 2.2, 3 and 4 (option)). Please refer to the tender documentation for further details.


II.2.5)Award criteria
Criteria below
Quality criterion - Name: Process / Weighting: 30
Quality criterion - Name: Organisation and key personnel / Weighting: 40
Cost criterion - Name: Price / Weighting: 30
II.2.6)Estimated value
Value excluding VAT: 207 000 000.00 DKK
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 140
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
Envisaged number of candidates: 4
Objective criteria for choosing the limited number of candidates:


If more than 4 applicants fulfill the minimum requirements, see Section III.1.2), the selection of the applicants who will be invited to participate in the competitive dialogue will be based on an overall assessment of which applicants have documented the most relevant experience similar to the services covered by the procured contract, c.f. Section II.1.4), II.2.4) and II.2.6). With “similar” services Metroselskabet understands projects of similar economical size, complexity and nature of services. In addition Metroselskabet will place emphasis on the below mentioned criteria per reference category.


The reference categories:


Category 1: EIA


Category 2: Design


Category 3: Innovation and sustainability


Category 4: BIM


Metroselskabet will place emphasis on the following per reference category:


Category 1 (EIA):


Experiences with analyzing UNSGs in relation to EIA


Experiences with EIA in dense urban area


Experiences with local regulations and local practices for the preparing an EIA


Experiences with EIA for infrastructure projects


Category 2: (Design):


Experiences and competences in developing concept and reference design in similar projects


Experiences in developing contract requirements for construction contracts in similar projects,


Experiences with developing procurement strategy


Experiences as lead consultant for similar projects,


Experiences with project management for similar projects


Experiences with safe in design in concept- and reference design


Category 3:(Innovation and sustainability)


Experiences with specifying and implementing sustainable initiatives in similar projects,


Experiences with initiatives reducing carbon footprint, LCA and LCC calculations


Experiences with documenting sustainable initiatives such as reducing carbon footprint etc.


Experiences with planning and carrying out innovation processes,


Category 4: (BIM)


Experiences working with GIS and BIM/3D designing in projects of a similar scope and of similar services (infrastructure projects) and collaborating in the BIM model


Experiences with ICT management and project management as discipline lead


Experiences with ISO19650-1 and ISO19650-2 or similar.


II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: yes
Description of options:


Option 1: Consultancy to Metroselskabet during construction phase (phase 4). The option consists of consultancy services to Metroselskabet during the construction phase, such as review of design, assessment of design solutions suggested by the contractor etc., follow up on BIM requirements etc. Please refer to M5-MS-ØHA-CNS-CWEIA-TEN-DO-005 Project and Work Description.




Permalink


Postponed from 08/11/2022 to 15/11/2022 the deadline of the competitive dialogue for the Osthavn Metro line, Consultancy Environmental Impact Assessment (EIA), Concept- and Reference Design and Utilities. Osthavn M5 will be a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholmen, Refshaleoen and Kloverparken with the existing city and transport network. Currently, there are 2 possible main scenarios for the alignment of M5.    

M5 Orange via Amagerbrogade– from København Hovedbanegard (Kh) to Lynetteholm via Amager, with possibilities to extend to Osterport (KK) or Nordhavn: Lot 1, value EUR 27.83 million (DKK207million), excluding VAT; duration of the contract will be 140 months.   

M5 Purple from Lynetteholm to Prags Boulevard Ost via Kk, Kh and following the same alignment than M5 Orange between Kh and Prags Boulevard OstAmager: Lot 2, value EUR 46.38 million (DKK345 million), excluding VAT; duration of the contract will be 140 months.   

For tender documents please click here, where tenders must be sent.   

Contact Metroselskabet I/S, attn Vibeke Jessen, Copenhagen , email vij@m.dk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=ent&docid=599405-2022. 45/22. 

 




Permalink