The new metro line M5 Østhavn will connect the new city development areas to the east of Copenhagen including Lynetteholmen, Refshaleøen and Kløverparken wit the existing city and transport network.
The project is divided into five phases:
Phase 1: Programme study (already completed)
Phase 2.1: Conceptual design (civil works) and EIA (this contract notice)
Phase 2.2: Reference design and production of construction contract documents (this contract notice)
Phase 3: Procurement and contracting (this contract notice)
Phase 4: Follow-up during the construction phase (Option 1, please refer to section II.2.11)
The main construction contract will be procured as a 'Design and Build' contract based on the reference design made by the consultant. There may also be further smaller construction contracts that are procured as construct only based on the consultants detailed design, for example advanced works.
The consultancy services consist of (the list is not exhaustive):
-EIA
-Design Management
-ICT Management
-Conceptual Design,
-Reference Design
-Develop and prepare the requirements for the construction contractor
-Prepare procurement strategy for the construction contract
-Development of BIM- model for all infrastructure elements
-Develop and prepare requirements for the contractors use of the BIM model
-Be in charge of the innovation process, develop idea-catalogue, prepare basis for decisions, time schedule etc.
-Prepare basis for decisions in regards, to the technical aspects of the project, e.i in regards to the innovation process, technical solutions, sustainability etc.
-Assistance to Metroselskabet during construction (option, please refer to section II.2.11)
Furthermore, the contract includes services such as preparation of reports, cost calculations, scheduling, produce drawings, 3D model files etc.
The design must include development of BIM models for all infrastructure elements in accordance with the requirements defined in the tender material. Metroselskabet has high ambitions in regards to BIM, and the consultant is expected to have a high level of experience and knowledge regarding BIM. In addition, Metroselskabet intends to collaborate with the consultant by using BIM/GIS, which also requires experiences working with BIM/GIS. Metroselskabet encourages the applicants to consider the requirements for the BIM services very carefully and if needed teaming up with specialists in working with BIM as sub-consultants.
During the design process the consultant must have a high focus on safety and the possible implications of their design. In addition, Metroselskabet has a high focus on minimizing the CO2 footprint, and the consultant is expected to develop an idea-catalogue as well as considering the possibilities identified by Metroselskabet for the design.
Innovation must be an integrated part of the design process. The process shall not only consider ideas already identified but also generate new ideas. Metroselskabet encourages the applicants to consider the innovation process very carefully and if needed consider teaming up with specialists in innovation processes as sub-consultants.
Metroselskabet strongly expects a decision on which alignment to be taken forward will be made during Q1 2023. If the decision on which alignment to move forward has not yet made when the deadline for submission of final tender response expires, the contract will not be awarded until such a political decision has been made. Metroselskabet reserves the right to purchase EIA for the not chosen line from the winning tenderer. Payment for the additional EIA will be negotiated based on the hourly rates offered by the winning tenderer. After completion of the EIA for both M5 Orange and M5 Purple, (if relevant) Metroselskabet reserves the right to exchange the originally chosen Metro line for the new chosen Metro line (phase 2.2, 3 and 4 (option)). Please refer to the tender documentation for further details.