Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Morazzone breakthrough

08/12/2013
Breakthrough of the east tube of the 2,167m Morazzone tunnel Pedemontana Lombarda was achieved on 04.12.2013 to complete the tunneling works. Underground ventilation was provided by Systemair, and two CIFA formworks are being used in each tube to install the final lining. Handover is expected in summer, 2014. Click here for some site photos, here and it/128 for tunnelbuilder archive. Visit www.pedemontana.com, www.systemair.com and  www.cifa.com. 49/13.



NEED QUALIFIED PERSONNEL?