Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Andalusia - es/132

High Speed Railway

Open call for tenders, deadline 5th September, 2006 for health and safety coordination during construction of the Bobadilla-Granada high speed line, which includes tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=147437-2006, OJ S 137, or contact ADIF, Madrid, fax +34 917005751. 31-32/06.Open call for tenders, deadline 5th September, 2006 for auditing, quality control and advising during construction of the Bobadilla-Granada high speed line, which includes tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=147438-2006, OJ S 137, or contact ADIF, Madrid, fax +34 917005751. 31-32/06.Open call for tenders, deadline 19th February, 2007 for construction of the 3,260 m-long Archidona-Arroyo de la Negra section on the Bobadilla-Granada high speed link. This section includes the 2,170 m-long Archidona tunnel, with a cross section of 85 sq m. From Bobadilla on the Cordoba-Malaga high speed link, the new line will head east to Granada and provide a west-to-east transversal link. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=5109-2007, OJ S 5, or contact ADIF, Madrid, fax +34 917005751. 04/07.Gemosa pocketed a EUR2.2 million contract for auditing, quality control and advising during construction of the Bobadilla-Granada high speed line. The 3,260 m-long Archidona-Arroyo de la Negra section includes the 2,170 m-long Archidona tunnel, whereof 1,880 metres will be bored and the remainder will be built in cut-and-cover at the portals. 06/07.Open call for tenders, deadline 27th March, 2007 for design of the Sorbas-Lucaneina de Torres section (12.6 km) on the Mediterranean coast high speed line in Almeria province. Noticeable engineering structures include two tunnels, respectively of 7.5 km and 750 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=34173-2007, OJ S 36, or contact ADIF, Madrid, fax +34 917005751. 10/07.ACS' affiliates Tecsa and Dragados received a EUR41.7 million contract to build the 3.26 km Archidona-Arroyo de la Negra section to Granada in Malaga province. This section includes the 1.88 km Archidona tunnel. Visit www.tecsa.es and www.dragados.com 18/07.Open call for tenders, deadline 6th August, 2007 for site supervision during construction of the 3,260 m-long Archidona-Arroyo de la Negra section on the Bobadilla-Granada high speed line, including the 2,170 m-long 85 sq m Archidona tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140749-2007, OJ S 114, or contact ADIF, Madrid, fax +34 917005751. 29/07.Iberinsa (60%) and Geoconsult (40%) bagged a EUR2.1 million design contract for the 12.6 km Sorbas-Lucaneina de Torres section on the Mediterranean coast high speed line in Almeria province. This section includes two tunnels, 7.5 km and 750 m in length respectively. Visit www.iberinsa.es and www.geoconsult.es 32/07.Open call for tenders, deadline 20th December, 2007 for detailed design of the high speed rail section between Seville's Santa Justa railway station and San Pablo airport. The project includes a 10 km tunnel and forms part of the Seville-Malaga high speed line. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258048-2007, OJ S 212, or contact Ferrocarriles de la Junta de Andalucí­a, Seville, fax +34 955007573. E-mail maryam.ferreras@ferrocarrilesdeandalucia.es 46/07.Geocontrol and VS Ingenierí­a y Urbanismo pocketed a EUR3.7 million contract for site supervision during construction of the 3,260 m-long Archidona-Arroyo de la Negra section on the Bobadilla-Granada high speed line, including the 2,170 m-long 85 sq m Archidona tunnel. Visit www.geocontrol.es and www.vsingenieria.com 46/07.Open call for tenders, deadline 21st January, 2008 for construction of the Arroyo de la Vií±uela-Quejigares section on the Bobadilla-Granada high speed link. This 4.9 km section includes the 3,343 m-long Quejigares tunnel, whereof 3,267 metres will be mined. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290899-2007, OJ S 239, or contact ADIF, Madrid, fax +34 917005751. 52/07-01/08.Open call for tenders, deadline 1st April, 2008 for design of the 7 km Alcores tunnel section on the west-east high speed line that will link Seville, Malaga, Granada and Almeria. This section includes a 3 km twin-tube tunnel in Seville province. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=38792-2008, OJ S 29, or contact Ferrocarriles de la Junta de Andalucí­a, Seville, fax +34 955007573. E-mail carmen.camacho@ferrocarilesdeandalucia.es 08/08.Open invitation to tender, deadline 7th April, 2008 for construction supervision for the 4.9 km Arroyo de la Vií±uela-Quejigares section, which includes the 3,343 m Quejigares tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=58711-2008, OJ S 42, or contact ADIF, Madrid, fax +34 917005751. 10/08.A joint venture formed by Dragados and Tecsa, both owned by ACS, bagged a EUR105.5 million contract to build the 4.9 km Arroyo de la Vií±uela-Quejigares section on the Antequera (Malaga)-Granada high speed link. The contract includes the construction of the 3,343 m Quejigares tunnel, which represents 68% of the total length of the section. Visit www.dragados.com and www.tecsa.es 10/08.Prointec will manage and supervise the construction of the 4.9 km Arroyo de la Vií±uela-Quejigares section of the east-west high speed line across Andalusia. This section includes the 3,343 m Quejigares tunnel. The contract is worth EUR3.3 million. Visit www.prointec.es 27/08.A joint venture of Domtra 57 and Intecsa-Inarsa has been entrusted with the detailed design of the high speed rail section between Seville's Santa Justa railway station and San Pablo airport. The project includes a 10 km tunnel and forms part of the Seville-Malaga high speed line. Their contract is worth EUR3.5 million. Visit www.intecsa-inarsa.es 32-33/08.Invitation to tender for technical assistance and works supervision on 7.63 km-long Sorbas-Barranco de Gafarillos section of Mediterranean corridor high speed railway including 7.5 km-long Sorbas tunnel beneath the Sierra de la Cabrera. Contract value EUR5 million, duration 50 months. Contact ADIF, Madrid, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=002536-2009. 02/09.Invitation to tender, deadline 23.02.2009, for technical assistance and works supervision on 1.67 km-long Barranco de Gafarillos-Areos section of Mediterranean corridor high speed railway including 1.1 km-long, Almendral tunnel. Contract value EUR2.7 million, duration 36 months. Contact ADIF, Madrid, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=003639-2009. 04/09.



Permalink

Open invitation to tender for construction of 3 km-long twin tube Tunel de los Alcores in Sevilla province, estimated value EUR109,655,061 excluding VAT, contract duration 36 months. Further information, specs and docs from Charles Darwin at Ferrocarriles de la Junta de Andalucia in Sevilla, tel +34 9550075-50, fax -73, e-mail inmaculada.vergara@ferrocarrilesandalucia.es to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=215062-2009. 37/09.



Permalink

Open call for tenders, deadline 06.04.2010, for quality control during the construction of the Alcores tunnel on the west-east high-speed line that will link Seville, Malaga, Granada and Almeria. Contact Inmaculada Vergara at Ferrocarriles de la Junta de Andalucí­a in Siviglia, fax +34 955007573, e-mail inmaculada.vergara@ferrocarrilesdeandalucia.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=042993-2010. 11/10.



Permalink

The JV Easa/Euroconsa/Inocsa of Avenida Cesar Augusto, 3, Saragozza secured the estimated EUR2.9 million contract for works management during the construction of the 3 km-long twin tube Tunel de los Alcores in Sevilla province. Visit www.ferrocarrilesandaluces.com. 12/10.



Permalink

OHL-Comsa-Detea-Noriega JV awarded construction contract for Ferroviario Transversal de Andalucia, Seville-Malaga high-speed line between Santa Justa and Club de Campo, value EUR241,632,222, including 16% VAT. More from inmaculada.vergara@ferrocarrilesdeandalucia.es, tel +34 9550075-50, fax -73 and visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104349-2010. 15/10.



Permalink

Ferrovial-AZVI JV awarded construction contract for 3 km-long, twin tube Alcores tunnel in Seville province on Ferroviario Transversal de Andalucia, Seville-Malaga high-speed line, value EUR111,757,806 including 16% VAT. More from inmaculada.vergara@ferrocarrilesdeandalucia.es, tel +34 9550075-50, fax -73. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=104348-2010. 15/10.



Permalink

Saitec SA secured the EUR118,330 contract, excluding VAT, for design related to civil protection systems and plans for self-protection in tunnels on the Antequera (Malaga)-Granada high speed line. Contact Adif – High Speed, Madrid, tel +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179646-2014. 22/14.



Permalink


The JV Alstom Transporte, S.A.U. (50 %) Indra Sistemas, S.A. (33,66 %) and Indra Sistemas de Seguridad, S.A. (16,34%) secured the EUR4.35 million contract, excluding VAT, for the construction and maintenance of civil protection and safety installations in tunnels on the Antequera–Granada high speed line. Contact Contact Adif, Madrid, tel  +34 917744804, fax +34 917745814, e-mail pmardaiz@adif.es. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=324190-2015. Ref. n. 4.14/20830.0085 – OM 006/14. 39/15.




Permalink


Prior information to tender for the comprehensive management service of the protection and security equipment in the 1.8 km ad 1.9.km urban tunnels in Cordoba and Malaga and in the 15 tunnels for 33 km in total of the Cordoba-Malaga and Antequera-Granada high-speed lines. Value of the contract is EUR7.13 million, excluding VAT. Duration of the contract is 48 months. Estimated date of publication of the contract notice: 30/06/2021. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 917744804, fax +34 917674490, e-contrataciondcc@adif.es. For further on TED tender, please click here. 19/21.

 




Permalink


Open invitation to tender, deadline 31/05/2021, for the comprehensive management service of the protection and security equipment in the 1.8 km ad 1.9.km urban tunnels in Cordoba and Malaga and in the 14 tunnels for 33 km in total of the Cordoba-Malaga and Antequera-Granada high-speed lines. Value of the contract is EUR8.94 million, excluding VAT. Duration of the contract is 48 months. Click here for tender documents and here where tenders must be sent. Contact Adif, Madrid, tel +34 913007567,  email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=222897-2021. 18/21. 

 




Permalink


The Joint Venture Mantenimiento tuneles LAV Sur - composed of Cobra Instalaciones y Servicios SA, Cobra Sistemas de Seguridad SA and Moncobra SA - from Madrid secured the EUR 6.24 million contract, excluding VAT, for the comprehensive management service of the protection and security equipment in the 1.8 km ad 1.9.km urban tunnels in Cordoba and Malaga and in the 14 tunnels for 33 km in total of the Cordoba-Malaga and Antequera-Granada high-speed lines. Contact Adif, Madrid, tel +34 913007567,  email david.fdez@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=647063-2021. 50/21.



Permalink


Adif Alta Velocita (Adif AV) has awarded the company Eptisa the EUR 99,979.27 contract, including VAT, for the hydrogeological monitoring of the Archidona tunnel (1,125 m) on the AV Antequera-Granada line. The tunnel is located in the Archidona municipality, crosses the northern edge of the Sierra de Archidona and also passes under the A-92 motorway. The objective of the contract is to verify that the solutions adopted during its construction continue to be effective in avoiding damage to the hydrogeological environment. Visit www.adifaltavelocidad.es. 51/21. 

 




Permalink


Asociacion de Accion Ferroviaria (Cetren) from Madrid have secured the contracts for 9 lots for CE validation  of interoperability of the infrastructure and/or energy subsystems on the new high speed railway sections: 

  • Lot1: Olmedo-Zamora-Pedralba, value of the contract EUR355,000, excluding VAT; 
  • Lot 2: Valladolid-Leon/Venta de Banos-Burgos, value of the contract EUR495,000, excluding VAT; 
  • Lot 3: Antequera-Granada, value of the contract EUR188,000, excluding VAT; 
  • Lot 4: La Robla-Pola de Lena, value of the contract EUR249,000, excluding VAT;
  • Lot 5: Castellbisbal-Tarragona (Vilaseca)-Vandellos-Castellon-Valencia, value of the contract EUR664,000, excluding VAT;
  • Lot 6: Monforte del Cid-Murcia-Alicante (Cambiador Encina)-Jativa-Valencia, value of the contract EUR305,000, excluding VAT;
  • Lot 7: Plasencia-Badajoz, , value of the contract EUR170,000, excluding VAT; 
  • Lot 8: Vigo-Santiago-la Coruna-Orense-Santiago, value of the contract EUR567, 000, excluding VAT; 
  • Lot 9: Tunnel AV Atocha-Chamartin, , value of the contract EUR43,459, excluding VAT. 

Contact  Adif Alta Velocidad, attn Francisco Macias Bonilla, Madrid, tel +34 661347788,  email fmacias@adif.es. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=120827-2022. Ref.n. 3600000039. 11/22.



Permalink

Prior information notice for civil protection and safety installations in the tunnels on the Lorca  Almeria section of the Murcia - Almeria high speed line. Contact Adif-Alta Velocidad, Madrid, tel +34917744804, email comprasycontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/101208-2024. 16/24. 



Permalink


Open invitation to tender, deadline 26/07/2024, for consulting and technical assistance for the control of the works of the project "Civil protection and security facilities in the tunnels of the Murcia-Almería High Speed ​​Line. Section: Murcia-Nonduermas. Click here for bid documents and where tenders must be sent. Value of contract EUR572.058,07, excluding VAT. Duration of contract 9 months. Contact ADIF-AltaVelocidad, Madrid, tel +34 917744804, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/377005-2024.  Ref.n. 3.24/20830.0072. 26/24.



Permalink


Open invitation to tender, deadline 14/10/2024, for consulting and technical assistance services for the project of civil protection and safety installations in the tunnels on the following section of the Murcia - Almeria high speed line:

  • Lorca-Almeria, including 9 tunnels with 13.75km total lenght. The main tunnels are Lorca Station 1.230 m and 1242 m, Rincon ( 928,28 m),  Sorbas (7536,00 m) and Almendral (1.112,75 m)
  • Pulpi-Aguilas, including 4 tunnes shorter than 75 m.

Click here for bid/tender documents and where tenders must be sent. Value of contract EUR737,816.56, excluding VAT. Duration of contract 24 months. Contact ADIF-AltaVelocidad, Madrid, tel +34 917744804, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/543024-2024.  Ref.n. 3.24/30830.0163. 36/24.



Permalink