Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Andalusia - es/132

High Speed Railway

Open call for tenders, deadline 5th September, 2006 for health and safety coordination during construction of the Bobadilla-Granada high speed line, which includes tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=147437-2006, OJ S 137, or contact ADIF, Madrid, fax +34 917005751. 31-32/06.Open call for tenders, deadline 5th September, 2006 for auditing, quality control and advising during construction of the Bobadilla-Granada high speed line, which includes tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=147438-2006, OJ S 137, or contact ADIF, Madrid, fax +34 917005751. 31-32/06.Open call for tenders, deadline 19th February, 2007 for construction of the 3,260 m-long Archidona-Arroyo de la Negra section on the Bobadilla-Granada high speed link. This section includes the 2,170 m-long Archidona tunnel, with a cross section of 85 sq m. From Bobadilla on the Cordoba-Malaga high speed link, the new line will head east to Granada and provide a west-to-east transversal link. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=5109-2007, OJ S 5, or contact ADIF, Madrid, fax +34 917005751. 04/07.Gemosa pocketed a EUR2.2 million contract for auditing, quality control and advising during construction of the Bobadilla-Granada high speed line. The 3,260 m-long Archidona-Arroyo de la Negra section includes the 2,170 m-long Archidona tunnel, whereof 1,880 metres will be bored and the remainder will be built in cut-and-cover at the portals. 06/07.Open call for tenders, deadline 27th March, 2007 for design of the Sorbas-Lucaneina de Torres section (12.6 km) on the Mediterranean coast high speed line in Almeria province. Noticeable engineering structures include two tunnels, respectively of 7.5 km and 750 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=34173-2007, OJ S 36, or contact ADIF, Madrid, fax +34 917005751. 10/07.ACS' affiliates Tecsa and Dragados received a EUR41.7 million contract to build the 3.26 km Archidona-Arroyo de la Negra section to Granada in Malaga province. This section includes the 1.88 km Archidona tunnel. Visit www.tecsa.es and www.dragados.com 18/07.Open call for tenders, deadline 6th August, 2007 for site supervision during construction of the 3,260 m-long Archidona-Arroyo de la Negra section on the Bobadilla-Granada high speed line, including the 2,170 m-long 85 sq m Archidona tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140749-2007, OJ S 114, or contact ADIF, Madrid, fax +34 917005751. 29/07.Iberinsa (60%) and Geoconsult (40%) bagged a EUR2.1 million design contract for the 12.6 km Sorbas-Lucaneina de Torres section on the Mediterranean coast high speed line in Almeria province. This section includes two tunnels, 7.5 km and 750 m in length respectively. Visit www.iberinsa.es and www.geoconsult.es 32/07.Open call for tenders, deadline 20th December, 2007 for detailed design of the high speed rail section between Seville's Santa Justa railway station and San Pablo airport. The project includes a 10 km tunnel and forms part of the Seville-Malaga high speed line. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258048-2007, OJ S 212, or contact Ferrocarriles de la Junta de Andalucí­a, Seville, fax +34 955007573. E-mail maryam.ferreras@ferrocarrilesdeandalucia.es 46/07.Geocontrol and VS Ingenierí­a y Urbanismo pocketed a EUR3.7 million contract for site supervision during construction of the 3,260 m-long Archidona-Arroyo de la Negra section on the Bobadilla-Granada high speed line, including the 2,170 m-long 85 sq m Archidona tunnel. Visit www.geocontrol.es and www.vsingenieria.com 46/07.Open call for tenders, deadline 21st January, 2008 for construction of the Arroyo de la Vií±uela-Quejigares section on the Bobadilla-Granada high speed link. This 4.9 km section includes the 3,343 m-long Quejigares tunnel, whereof 3,267 metres will be mined. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=290899-2007, OJ S 239, or contact ADIF, Madrid, fax +34 917005751. 52/07-01/08.Open call for tenders, deadline 1st April, 2008 for design of the 7 km Alcores tunnel section on the west-east high speed line that will link Seville, Malaga, Granada and Almeria. This section includes a 3 km twin-tube tunnel in Seville province. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=38792-2008, OJ S 29, or contact Ferrocarriles de la Junta de Andalucí­a, Seville, fax +34 955007573. E-mail carmen.camacho@ferrocarilesdeandalucia.es 08/08.Open invitation to tender, deadline 7th April, 2008 for construction supervision for the 4.9 km Arroyo de la Vií±uela-Quejigares section, which includes the 3,343 m Quejigares tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=58711-2008, OJ S 42, or contact ADIF, Madrid, fax +34 917005751. 10/08.A joint venture formed by Dragados and Tecsa, both owned by ACS, bagged a EUR105.5 million contract to build the 4.9 km Arroyo de la Vií±uela-Quejigares section on the Antequera (Malaga)-Granada high speed link. The contract includes the construction of the 3,343 m Quejigares tunnel, which represents 68% of the total length of the section. Visit www.dragados.com and www.tecsa.es 10/08.Prointec will manage and supervise the construction of the 4.9 km Arroyo de la Vií±uela-Quejigares section of the east-west high speed line across Andalusia. This section includes the 3,343 m Quejigares tunnel. The contract is worth EUR3.3 million. Visit www.prointec.es 27/08.A joint venture of Domtra 57 and Intecsa-Inarsa has been entrusted with the detailed design of the high speed rail section between Seville's Santa Justa railway station and San Pablo airport. The project includes a 10 km tunnel and forms part of the Seville-Malaga high speed line. Their contract is worth EUR3.5 million. Visit www.intecsa-inarsa.es 32-33/08.Invitation to tender for technical assistance and works supervision on 7.63 km-long Sorbas-Barranco de Gafarillos section of Mediterranean corridor high speed railway including 7.5 km-long Sorbas tunnel beneath the Sierra de la Cabrera. Contract value EUR5 million, duration 50 months. Contact ADIF, Madrid, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=002536-2009. 02/09.Invitation to tender, deadline 23.02.2009, for technical assistance and works supervision on 1.67 km-long Barranco de Gafarillos-Areos section of Mediterranean corridor high speed railway including 1.1 km-long, Almendral tunnel. Contract value EUR2.7 million, duration 36 months. Contact ADIF, Madrid, fax +34 917745814. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=003639-2009. 04/09.



Permalink