Greece

Greece, Macedonia - gr/31

Railway

Poyry has been awarded a contract for reviewing and updating the existing feasibility study of the Hellenic Railways for the Siatista-Kozani railway segment. The contract includes the designs of all the necessary civil works and the rehabilitation of the road network. The main structures are two tunnels of 1,300 m and 650 m. This project will be executed in cooperation with two Greek consultants, Salfo & Associates and S. Liaros-Helida Engineering Consultants. Poyry's share of the contract is approximately EUR1 million. The project will be completed in 12 months. Visit www.poyry.com and www.salfo.gr 25/06.



Permalink

Greece, West Greece - gr/30

High Speed Railway

ERGOSE, a subsidiary of the Hellenic Railways, on 13th September announced that a joint venture between Aktor and Pantechniki was selected as provisional winner of a tender to build a bridge and two railway tunnels, on the Athens-Patra high speed line, worth EUR100.5 million. The two tunnels will be built in Platanos (2,293 m in length) and Trapeza (2,748 m) on the Kiato-Aegio section in west Peloponnese. The tunnels have been designed to accommodate a double-track standard gauge railway line, with a cross section of approximately 100 sq m. Each tunnel will have two escape tunnels, whose overall length will be approximately 1,000 m. The project will be financed by the EU's second Cohesion Fund (50%) and on the national budget (50%). The project is expected to be delivered in 36 months after signing of the contract. Visit www.ergose.gr, www.aktor.gr and www.pantechniki.gr 39/05.Open call for tenders, deadline 9th February, 2006 for construction of the Platanos and Trapeza single bored tunnels (2,259 m and 2,713 m) on the Kiato-Aegio section on the Athens-Patra high speed line in west Peloponnese. This is a re-bid, further to the cancellation of the contract awarded in September 2005. Click gr/30. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=241770-2005, OJ S 245, or contact Erga Ose, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 04/06.Open call for tenders, deadline 16th February, 2006 for construction of the Aegio single bored tunnel (3,252 m) on the Athens-Patra high speed line in west Peloponnese. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=01886-2006, OJ S 1, or contact Erga Ose, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 04/06.Open call for tenders, deadline 30th March, 2006 for construction of a 6.8 km section near Patras on the Athens-Patras high speed link, including the 1,815 m-long Melissiou tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030139-2006, OJ S 27, or contact Erga OSE, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 08/06.A JV of Terna, Mochlos and Aktor has secured a EUR53.6 million contract to construct the Aegio single bored tunnel (3,252 m) on the Athens-Patra high speed line in west Peloponnese. Visit www.terna.gr, www.mochlos.gr and www.aktor.gr 35/06.Michaniki signed a EUR37.7 million contract to build section Kiato-Rododafni (6.8 km) on a new double railway line, including the Melissiou tunnel (1,815.6 m) in northern Peloponnese. The project also includes the construction of an escape tunnel extending for around 298 metres. The time schedule for the completion of the project is 30 months from the signing of the contract in June. Visit www.michaniki.gr 36/06.A JV of J&P-Avax, Terna and Aktor won a EUR71.8 million contract to build the Platanos and Trapeza single bored tunnels, respectively 2,259 m and 2,713 m long, on the Kiato-Aegio section on the Athens-Patra high speed line in west Peloponnese. Visit www.jp-avax.gr, www.terna.gr and www.aktor.gr 03/07.Open call for tenders, deadline 13th March 2007 for construction of a 12.5 km-long railway section including two twin bored tunnels of 592 m and 464 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=12773-2007, OJ S 11, or contact Erga OSE, Athens, fax +30 2105283392 or 2105283149. E-mail pakoukou@ergose.gr 05/07.Michaniki is the preferred bidder for construction of the new Kiato-Rododafni double-track line, including the Derverni tunnels in Northern Peloponnese, budgeted at EUR211 million. The project includes the construction of the infrastructure of a modern double railway line which spans approximately 40 km, two railway tunnels in Derveni region of total length of 1,056.6 metres and railway bridges. The project also includes road works and relevant to the line hydraulic works. The time schedule for the completion of the project is 30 months after the official signing of the contract. Visit www.michaniki.gr 13/07.



Permalink

Periodic notice for construction of the section Aegio (Rododafni)-Psathopyrgos on a new double railway line, including the 4.8 km-long Panagopoula tunnel. Contract value EUR305 million, duration 30 months. Contact Erga OSE, Athina, tel +30 21052833-90, fax -92, e-mail pakoukou@ergose.gr. Visit www.ergose.gr. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=115665-2009. 19/09.



Permalink

Prior information notice for start of award procedure for construction of the section Aegio (Rododafni)-Psathopyrgos of a new twin-track railway line, including the 4.8 km-long Panagopoula tunnel. Contract value EUR315 million, duration 36 months. Contact Erga OSE, Athina, tel +30 21052833-90, fax -92, e-mail nintasios@ergose.gr. Specs and docs from evkanellop@ergose.gr. Visit www.ergose.gr and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=058557-2012. 08/12.



Permalink

Open invitation to tender, deadline 08.05.2012, for construction of the section Aegio (Rododafni)-Psathopyrgos of a new twin-track railway line, including the 4.8 km-long Panagopoula tunnel. Contract value EUR315 million, duration 36 months. Time limit for receipt of requests for documents or for accessing documents: 02.05.2012. Further information from Erga OSE, Athens, tel +30 2105283249, fax -392, e-mail nintasios@ergose.gr. Specs and docs from evkanellop@ergose.gr. Visit www.ergose.gr and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=077702-2012. 11/12.



Permalink

Open invitation to tender, deadline 31.12.2013, for the construction of remaining infrastructure, superstructure, signalling, telecommanding, telecommunications and electrical installations in tunnels for the new railway line Kiato to Rododafni, approximately 71 km-long. The project is part of the wider construction project of the new double-track railway line Athens (SKA)-Patras. Time limit for receipt of requests for documents or for accessing documents: 24.12.2013. Contact Erga OSE SA, att.n Nikolaos Ntasiou, Athens, tel +30 2105283249, fax +30 2105283392, e-mail nintasios@ergose.gr. For further information contact Erga OSE SA, att.n President Bids Office, Tender n. AD 715, Athens, tel+30 2105283152, fax +30 2105283149, e-mail pakoukou@ergose.gr for sending the offers. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=376592-2013. 46/13.



Permalink

Award of contract number 715, value EUR227,043,595 excluding VAT, for the construction of remaining infrastructure, superstructure, signalling, telecommanding, telecommunications and electrical installations in tunnels for the new railway line Kiato to Rododafni, approximately 71 km-long. The project is part of the wider construction project of the new double-track railway line Athens (SKA)-Patras. For further information contact Erga OSE SA, att.n President Bids Office, Tender n. AD 715, Athens, tel+30 2105283152, fax +30 2105283149, e-mail pakoukou@ergose.gr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=358070-2014. 43/14.



Permalink

Greece, Central Greece - gr/29

High Speed Railway

Periodic notice for construction of a 9 km section, including the 6.5 km Orthris tunnel near Domokos some 200 km north of Athens. It will be a single or double tube, to be built with an excavator in accordance with NATM or with a TBM. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=099059-2005, OJ S 99, or contact Erga OSE, Athens, fax +30 5283392. E-mail pakoukou@ergose.gr 22/05.Restricted procedure, deadline 12th December, 2005 for construction of the 11 km Lianokladi-Domokos railway section on the Patras-Athens-Thessaloniki line, including the 2 x 6.5 km Othrios twin-tube tunnel, a 400 m twin-track tunnel and a cut-and-cover tunnel (2 x 630 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=206216-2005, OJ S 209, or contact Erga OSE, Athens, fax +30 5283392. E-mail pakoukou@ergose.gr 47/05.Open call for tenders, deadline 2nd October, 2006 for construction of the 2 x 6.5 km Orthris tunnel, including cut-and-cover extremities at each tube. The contract also includes two access adits of 900 m each and a smaller double-track single-tube tunnel of 400 m. The Orthris tunnel will be built using conventional excavators. This is a re-bid. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=164604-2006, OJ S 152, or contact Erga OSE, Athens, fax +30 2105283392 or 2105283149. E-mail pakoukou@ergose.gr 37/06.Contract 431 awarded to Malios Associates and Intecsa-Inarsa for EUR2.4 million involves the final design of tunnels SS6 (Orthris tunnel) and SS5 of the new double-track high speed railway Lianokladi-Domokos (section from Ch. 13+500 to Ch. 25+000). The project area is located in central Greece, to the west end of Orthris mountain, south of Xiniada basin and NW of Sperhios basin. The tunnels, having general direction SE-NW, are part of the new double-track railway line connecting Athens to Thessaloniki. Visit www.malios.gr and www.intecsa-inarsa.esThe geological formations of the area are distinguished in five main units depending on their lithology and engineering geological characteristics. These units, from the poorest - in terms of geomechanical behaviour - to the more optimum are alluvial deposits, schist-chert formations and flysch (semi-rock formations), breccia-conglomerate deposits, peridotites and dolerites of the ophiolite complex and limestones.Tunnel SS5 has a total length of 432.5 m, with underground excavation 370 m in length and a cut-and-cover entrance of 35.5 m long and a cut-and-cover exit of 27 m long. The excavation cross section area ranges from 116.35 sq m to 120.03 sq m when horse-shoe shaped and from 138.16 sq m to 149.44 sq m when approximately circular. The effective cross section is 78.95 sq m. NATM will be applied for the construction of SS5 and, depending on the rockmass conditions, either full face or sectional excavation will take place. The support elements are rockbolts, steel arches, shotcrete with or without fibres, fiberglass anchors for support of the tunnel face, as well as bolts and fore poling. Tunnel SS6 is a twin tunnel with total length of underground excavation of 12,780 m. Regarding the entrance area, the right branch consists of a cut-and-cover of 17.2 m long and a cut-and-cover of 14.5 m long before the underground excavation whereas the left branch consists of a cut-and-cover of 18.5 long. Regarding the exit area, there will be a cut-and-cover of 107.5 m long for each branch as well as a cut-and-cover of length 522.35 m on the right branch and 521.35 m on the left branch. The distance between the two axes of the tunnels ranges from 25 m up to 110 m.Between the two branches, there will be connecting tunnels at 500 m intervals. The excavation cross section area ranges from 36.84 sq m to 37.34 sq m when horse-shoe shaped and from 42.66 sq m to 51.37 sq m when approximately circular. The effective cross section is 20.81 sq m. NATM method will be applied for them either with full face excavation or sectional excavation. The excavation cross section area ranges from 80.5 sq to 86.7 sq m when horse-shoe shaped and from 94.84 sq m to 111.16 sq m when approximately circular. The effective cross section is 53.02 sq m. NATM will be applied for the construction of SS6. Depending on the rock mass conditions, the excavation will be either full face or sectional. The excavation will be carried out by mechanical means or drill and blast. The support categories of the tunnel are distinguished between stiff and yielding support. The former, sectionally excavated, are either approximately circular or horse-shoe shaped, with or without forepoling, whereas the approximately circular profile can be with temporary invert or not. The yielding support categories will be constructed either with full face or sectional excavation, with or without forepoling. The support for both categories (stiff and yielding) include anchors, steel arches, shotcrete with or without fibres, bolts and forepoling for the stability of the tunnel face. The project also includes the construction of two side access adits (Moschokarya tunnel and Agios Stefanos tunnel), 970 m and 750 m long respectively. The excavation cross section area ranges from 48.21 sq m to 49.79 sq m when horse-shoe shaped and from 53.4 sq m to 67.9 sq m when approximately circular. The effective cross section is 22.7 sq m. NATM method will be applied and the excavation will be either full face or sectional. The tunnel will have either horse-shoe shaped or approximately circular cross sections whereas at places yielding support will be applied. Mechanical excavation or drill and blast will be required for excavation. The support includes anchors, steel arches and shotcrete. At places, the tunnel face will also be temporarily supported and additional support may be required by means of bolts and forepoling. A prequalification tender has already started. The project is expected to start within the year 2007 and it will take four years for its completion. The estimated cost amounts to EUR324 million, including the construction of five bridges of total deck area of 24,908 sq m in addition to the afore-mentioned tunnels. Visit www.ergose.gr 39/06.Michaniki signed a EUR63.1 million contract for the construction of the Lianokladi-Domokos high speed rail line section. The project includes the construction of railway tunnels of a total length of 1,623 metres, the relevant works at the entrance and exit of the tunnels, railway bridges of a total length of 1,447 metres, road bridges of 277 metres and the relevant hydraulic works. The time schedule for completion of the project is 32 months from the signing of the contract. Visit www.michaniki.gr 06/07.Open call for tenders, deadline 26th June, 2007 for construction of a 27 km railway section, including eight single bored twin-track tunnels in Domokos, for a total length of 2.6 kilometres (137.5 m, 250 m, 537.5 m, 512.5 m, 250 m, 289 m, 342.5 m, and 312.5 m) and two cut-and-cover tunnels of 179 m and 129 m. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=103559-2007, OJ S 84, or contact Erga OSE, Athens, fax +30 2105283392. E-mail pakoukou@ergose.gr 19/07.Erga OSE signed on 23rd April, 2007 its largest contract to date for construction from Ch. 14+000 to Ch. 25+000 on the new Lianokladi-Domokos double-track high speed line. The EUR210.7 million contract has been awarded to Aktor and includes one of the most important tunnels to be constructed under the national railway network modernization programme, namely a twin-tube single-track tunnel, each tube 6.4 km long, under Orthris Mountain. The project will be completed in four years. Visit www.ergose.gr and www.aktor.gr 19/07.



Permalink

Greece, Thessaly - gr/28

Road

Open call for tenders, deadline 17th March, 2004 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=011505-2004, OJ S 14, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 05/04.Open call for tenders, deadline 31st March, 2004 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. This tender cancels and replaces the one published in January. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=022663-2004, OJ S 26, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 08/04.Open call for tenders, deadline 10th March, 2005 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. This is a rebid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=012973-2005, OJ S 14, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 04/05.J&P Avax's subsidiary Eteth was awarded a EUR14 million contract for the construction of the Gropa road tunnel on the Pyli-Stournareika-Mesohora secondary national road in Trikala prefecture, central Greece. The project includes a 1,470 m tunnel. The new route will divert traffic away from the Gropa mountain pass which produces several landslides and frequent traffic halts due to snowfall during the winter. The contract includes also the E&M equipment. The project is due for completion in 42 months. Visit www.jp-avax.gr 40/05.



Permalink

Greece, Sykia - gr/27

Hydro

Open call for bids, deadline 5th November, 2003 for completion of the Sykia dam. There are six grouting and drainage tunnels at three different levels totalling 2,961 m. The remaining length to build is 1,034 m, cross section 10.42 sq m. Also to build is an additional diversion tunnel, length 1,409 m, cross section 13.80 m. Mainly Cretaceous and Jurassic limestone plus flysch. Drill/blast method. Rockbolts and shotcrete as support with HEB steel supports if needed. Mucking-out with wheel loaders and dumper trucks. Design and technical consultancy by PPC / DAYE. Work supervision by EYDE and OSYE. Financing by the Greek government. Construction of the additional diversion tunnel will commence in June 2004 for completion in December 2005. The whole project will be commissioned in November 2009. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=154242-2003, OJ S 169, or contact Ypechode, fax +30 6450782. E-mail ggdeosye@otenet.gr 40/03.



Permalink

Greece, Crete - gr/26

Water

Open call for bids, deadline 24th September, 2003 for construction in the area of Prasson, western Crete of a 3,320 m-long 13 sq m tunnel for the passage of a pipeline that will transport water from the Amari dam to the plain of Rethimno for irrigation and drinking water. Also construction of a drainage tunnel, length 140 m and inner cross section 6.5 sq m, and an obstruction tunnel in the area of the Amari dam. The site of the project is 10 km south of the city of Rethimno on the northern side of Crete. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=134527-2003, OJ S 148, and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=135335-2003, OJ S 149, or contact Organization for the Development of Western Crete (Oadyk), Chania, fax +30 2821093350. E-mail oadyk@oadyk.gr 37/03.



Permalink

Greece, Mesochora - gr/25

Highway

Contractor Michaniki has been awarded a €32.6 million contract from DEH, the public power corporation, to build the 1,050 m-long 68 sq m Mesochora Dam tunnel, the 470 m-long 78 sq m Pachtouriou tunnel and the 1,100 m-long 10 sq m Mesochora drainage tunnel. The Mesochora Dam and the Pachtouriou tunnels are road tunnels to improve the Arta-Trikala highway. The Mesochora Dam tunnel will cut through Cretaceous limestone and Tertiary flysch, which in the area consists mainly of clay, siltstone and sandstone. Two Atlas Copco jumbo drill rigs will be used simultaneously from two drives. Support with rockbolts, steel fibre-reinforced shotcrete, lattice girders, forepoles and grouted fiberglass dowels.The Pachtouriou tunnel, which already exists, will be widened within Cretaceous limestone using the drill/blast method. The Mesochora drainage tunnel will be constructed to solve slope stability problems. It will cut through flysch. A roadheader boom excavator will be used. Support mainly with rockbolts and steel fibre-reinforced shotcrete. Construction commenced as of 15th May, 2003 and will take two years to complete. Visit www.michaniki.gr 25/03.



Permalink

Greece, PATHE - gr/24

Highway

Eyde PATHE has awarded to Aktor and Impregilo a €125 million contract for an 11 km stretch in Kamena Vourla, 130 km northwest of Athens, including two tunnels, 1.4 km and 5 km in length, on the Patra-Athens-Thessaloniki-Evzoni (PATHE) highway. Visit www.aktor.gr and www.impregilo.it 19/03.



Permalink

Greece, Thessaloniki - gr/23

Road

Preinformation notice for a subsea tunnel in the Thessaloniki harbour. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 62, document 48220-2002 or contact the ministry of public works, fax +30 10 6426787. 14/02. Notice for public works concession, deadline 4th September, 2002 for a submerged tunnel in the Port of Thessaloniki from the west entrance to Alexandrou Avenue. The tunnel itself consist of a 2 x 1,086 m land tunnel from the west entrance up to the first wharf. Then, the tunnel enters the immersed section (2 x 1,240 m) running until the vicinity of the White Tower where it connects to another land tunnel (594 m + 1,072 m) until Alexandrou Avenue. The scheme also requires open sections and entrance and exit links. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=99146-2002, OJ S 127, or contact Ministry of the environment, physical planning and public works, Athens, fax +30 106426787. 31/02. Seven consortia have expressed interest for a road scheme, a part of which requires an undersea tunnel in the harbour. They are: Siragga Thermaikou (Vinci, JNP, Avax, and Etaria Teknikon Thessaloniki); Transport Thessaloniki (Strabag, Bilfinger Berger and Aegek); Thermaiki Odos (Helliniki Teknodomiki, Aktor, Boskalis International, Archirodon, and Themeliodomi); an unnamed consortium (Bouygues, Autoroutes du Sud de la France, Alte, and Volker Stevin); Possidon (Hochtief, Dragados, Ballast Nedam, and Athena); Philippos (Impregilo, GEK, Terna, Avete, Ampedos, and NCC); and finally Thescros (FCC, E. Pihl & Sí¸n, Cl Sarantopoulos, Pantexniki, Attikat, Macquarie International, Peiraios Bank, and Cowi). The winning bidder will design, build, finance, maintain and operate the road under concession. The project is budgeted at €320 million. The Greek government is to contribute up to €60 million. 41/02.Six out of seven candidates have been prequalified for the harbour tunnel. Consortium Philippos led by Impregilo is the only eliminated. The remaining candidates will be invited to collect the design plans this week and the invitation to tender, technical documents and draft concession agreement will be sent in August. A three-month period will then open for the candidates to submit their offer, which is planned in November 2003. A committee will assess the bids and recommend a preferred bidder, which is planned by year-end or in early 2004. Then, the client should close a financial deal and assign the contract, which is estimated to take another four months. Finally, the project will be submitted to Parliament approval. The tunnel will comprise an immersed section (2 x 1,240 m) with two connecting land tunnels at each side (2 x 1,086 m and 594 m + 1,072 m). 29/03.Five consortia have submitted technical and economical offers for the concession contract for the harbour tunnel which includes an immersed section (2 x 1,240 m) and two connecting tunnels at each end (2 x 1,086 m and 594 m + 1,072 m). They are Tunnel Thermaikou (Vinci SA / Vinci Construction Grands Projets / J&P-Avax / Etheth / Cofiroute); Poseidon (Hochtief Projektentwicklung GmbH / Hochtief Construction / Dragados Concesiones de Infraestructuras / Dragados Obras y Proyectos / Ballast Nedam / Athena); Trans Port Thessaloniki (Strabag / Bilfinger Berger / Aegek); Thermaiki Odos (Elliniki Technodomiki / Aktor / Boskalis International / Archirodon Group / Themeliodomi); and Bouygues TP / ASF / Alte / Volker Stevin. The preferred bidder is expected to be announced in March 2005. Estimated cost is EUR322.8 million. 49/04.Thermaiki Odos, a Greek-Dutch consortium including Elliniki Technodomiki, Aktor, Archirodon Group, Themeliodomi and Boskalis International, won the tender for a 30-year concession contract for the Thessaloniki harbour tunnel including an immersed section (2 x 1,240 m) and two connecting tunnels at each end (2 x 1,086 m and 594 m + 1,072 m). The offer submitted by the consortium puts the contribution of the Greek government to construction and operation at EUR66.5 million. Construction will take four years once the contract is signed. The estimated cost of the tunnel is EUR322.8 million. 20/05.Following unprecedented delays, the concession agreement for the Thessaloinki submerged tunnel was signed on 31st October, 2006. The agreement ties in the Greek Ministry of Public Works, the concession company Thermaiki Odos, and the initial shareholders to the completion of the deal. The project cost is EUR472 million, of which about EUR100 million will be funded by the Greek State, EUR60 million from the sponsors, whilst the remainder is put up by the commercial bank and EIB loans. Hellenic Technodomiki has a 50% stake in the venture while Archirodon and Boskalis control 32.5% and 17.5% respectively. The consortium will build a 6.5 km underwater tunnel and operate the concession for 30 years. The project must still be ratified by parliament and construction is expected to begin by March 2007 and complete in four years. Click gr/23. 45/06.



Permalink

Greece, Central Macedonia - gr/22

Highway

Connection from Egnatia highway to Thessaloniki airport under geological investigation, including 1 km-long x 11 m-diameter tunnel. Tenders for design expected 2002, with construction expected to start a year later. Visit www.egnatia.gr 42/01.On behalf of Egnatia Odos, WBI will design a section of the Thessaloniki ring road jointly with Greek companies DOMI O.E. (S. Stathopoulos - K. Pharros Consulting Engineers), Makarounis Constantin and Emmanouilides George, and German partner IHS (Ingenieurbüro Heitfeld-Schetelig). The contract comprises the design of three two-lane single tube mined tunnels (tunnel S1: 350 m, tunnel S2: 360 m, tunnel S3: 410 m), each 10.5 m wide plus walkways, and 70 m-long two-lane and 500 m-long four-lane cut-and-cover tunnels. WBI is in charge of the design of the mined tunnels. DOMI is in charge of the design of the cut-and-cover tunnels. The tunnels are located in silty clays with embedded horizons of breccia and conglomerates. The contract is worth EUR690,000. Visit www.wbionline.de and www.egnatia.gr 29/08.



Permalink

Open invitation to tender, deadline 06.04.2009, for geological, geophysical and other scientific prospecting services on rock and cut/cover tunnels to connect Egnatia highway to Thessaloniki ring road and airport. Deadline for receipt of requests for documents or for accessing documents 30.03.2009. Contract value EUR900,000, duration 6 months. Contact Dieythynsi Symbaseon or Kentriko Protokollo at Egnatia Odos, Thessaloniki, tel +30 2310470-200393, fax +30 2310470-2975936, email eoae@egnatia.gr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=054284-2009, OJ S 37. 12/09.



Permalink

Open invitation to tender, deadline 11.08.2009, for tunnel construction and preliminary studies for 59.3.1, 59.3.2 and 59.3.3 sections of the Thessaloniki external ring road link with Egnatia highway and Macedonia Airport. Time limit for receipt of requests for documents or for accessing documents: 03.08.2009. Contact Dieythynsi Symbaseon or Kentriko Protokollo at Thessaloniki Egnatia Odos A.E, tel +30 2310470200-393, fax +30 2310470297-5936, e-mail eoae@egnatia.gr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=179695-2009. 28/09.



Permalink