Morocco

Morocco, Gibraltar Strait - ma/13

Railway

Qualification system, deadline 19th January, 2006 for preliminary design and environment impact study for the Gibraltar fixed link between Spain and Morocco. Click here and read E-News Weekly 30/2005 & 5/2005. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=232324-2005, OJ S 235, or contact SECEG, Madrid, fax +34 915796086. E-mail froca@secegsa.com 02/06.A JV of Typsa, Lombardi, Ingema and Geodata has won the contract for the preliminary design and environment impact study for the 40 km railway tunnel between Europe and Africa running under the Strait of Gibraltar. Typsa leads and manages the JV and is responsible for the EIS while Lombardi is the leader for the technical project. The JV has one year to draw up the plans for one of the most complex projects of its kind ever. Preliminary studies should be finished by 2008. If the project goes ahead, it will be a close cousin of the Eurotunnel that runs under the Channel between France and Britain. Running at depths of 300 to 600 metres, it will connect Tarifa in Spain to Tangiers in Morocco. A 4.8 m-wide service tunnel will be built first. This tube should help the engineers figure how much water might leak into the tunnel. The pressure on the tunnel will be huge, approximately 500 tonnes per square metre, so powerful pumps will be needed to avoid it filling up with water. Another problem is the risk of earthquakes in an active seismological zone. Read E-News Weekly 30/2005 & 5/2005. Click here. Visit www.typsa.es, www.lombardi.ch, www.ingema.co.ma and www.geodata.it 41/06.



Permalink

Morocco, Abda Doukkala - ma/12

Water Diversion

  12.4 km second aqueduct being driven by 7.2 m Robbins variable frequency drive, single shield TBM in deformed Palaeozoic rocks including abrasive quartzite and compact green schist with UCS of 33 to 120 Mpa with fractures and faults. TBM equipped with back-loading 17 in wedge-block cutters; rotary segment erector for six-piece precast concrete lining; ZED guidance system and automatic thrust control and steering. April 1995.



Permalink

Morocco, Casablanca - ma/11

Relief Sewer

4.2 km horseshoe-shaped tunnel 3.6 m x 3.9 m to be excavated by roadheader and supported by lattice girders and shotcrete. Contractors are GICO of Italy. April 1999.



Permalink

Nepal

Nepal, Bagmati Pradesh Province - np/29

Road

Closing Date: 14.01.2022 (Tender Closed)


Request for expression of interest, deadline 14/01/2022, for a consultancy service to perform a feasibility study of the Tathali-Rabiopi Road Tunnel, Bhaktapur district.

 

Will the construction of the tunnel effect a positive influence on the Bhaktapur, Nuwakot, Sindhupalchowk and Kathmandu districts?

 

The approximate entry point and exit coordinate of the proposed tunnel are 27°39'52" N, 85°29'26" E and 27°38'39" N, 85°33'54" E. The construction of road tunnel reduces the tentative length of the road up to 17 Km and hence reduces the travel time making the travel safe in geographically steep terrain. The tunnel will be constructed under DB or EPC Contract Model. The assignment has been scheduled for a period of 6 months. Expected date of commencement of the assignment is 02-03-2022. Contact DOR-Quality Research and Development Centre, Chakupat,  Lalitpur, email dgdor@dor.gov.np. Visit  www.bolpatra.gov.np/egp or www.dor.gov.np. Ref.n. QRDC/78/79/EOI-18. 01/22.   

 




Permalink

Nepal, Gandaki Pradesh Province - np/28

Highway

Closing Date: 14.01.2022 (Tender Closed)


Request for expression of interest, deadline 14/01/2022, for a consultancy service to perform a feasibility study of the Fusrekhola Chorepatan (Pokhara) - Syangja -Gudikhola - Road Tunnel, Kaski, Syangja on the Siddhartha Highway (H10). The H10 connects the Terai region in southern Nepal with the mountain region in northern Nepal, starting at the Nepal - India border near Siddharthanagar and terminating at Pokhara. This highway intersects with the east - west Mahendra Highway at Butwal. It is an important Highway connecting Rupandehi, Palpa, Syangja and Kaski districts.

 

-  Will the construction of the road tunnel effect a positive influence on the Syangja,Palpa, Gulmi, Kaski, Parbat districts.

 

The approximate entry point and exit coordinate of the proposed tunnel are 28°11'28.33" N, 83°57'15.89"° E and 28°6'42.53" N, 83°52'32.43" E.

 

The construction of a road tunnel reduces the tentative length of the road by up to 15 Km and hence reduces the travel time making the travel safe in geographically steep terrain. The tunnel will be constructed under the DB or EPC Contract Model. The assignment has been scheduled for a period of 6 months. Expected date of commencement of the assignment is 02-03-2022. Contact DOR-Quality Research and Development Centre, Chakupat,  Lalitpur, email dgdor@dor.gov.np. Visit  www.bolpatra.gov.np/egp or www.dor.gov.np. Ref.n. QRDC/78/79/EOI-15. 01/22.   

 




Permalink

Nepal, Western Region - np/27

Road

Closing Date: 14.01.2022 (Tender Closed)


Request for expression of interest, deadline 14/01/2022, for consultancy services to perform a feasibility study of the Baglung-Beu-Narethathi Road Tunnel, in Mid-hill in western Nepal in the Baglung District. Will the construction of the road tunnel have a positive influence on the Baglung, Pyuthan, Dolpa, Myadi ,Gulmi districts. The road through Baglung, Beu continuously rises to hill ridge and continuously falls towards Hatiya and has numerous turnings. The approximate entry point and exit coordinate of the proposed tunnel are 28°13'32.05"N, 83°28'6.10"E and 28°16'6.27"N, 83°31'25.22"E. The construction of a road tunnel reduces the tentative length of the road up to 18 Km and hence reduces the travel time making the travel safe in geographically steep terrain. The tunnel will be constructed under the DB or EPC Contract Model. The assignment has been scheduled for a period of 6 months. Expected date of commencement of the assignment is 02-03-2022. Contact DOR-Quality Research and Development Centre, Chakupat,  Lalitpur, email dgdor@dor.gov.np. Visit  www.bolpatra.gov.np/egp or www.dor.gov.np. Ref.n. QRDC/78/79/EOI-14. 01/22.   

 




Permalink

Nepal, Mid-Western Region - np/26

Highway

Closing Date: 14.01.2022 (Tender Closed)


Request for expression of interest, deadline 14/01/2022, for a consultancy service to perform a feasibility study of the Prawash - Jorte Road Tunnel in Bartung -Tansen - Ridi - Wamitaksar - Kharwang NH49, in mid-western Nepal. How will the construction of the Prawash - Jorte Road Tunnel, directly and indirectly effect and positively influence the districts of Palpa, Gulmi, Syangja, Baglung, districts. Will it also help in enhancing the tourism sector in these areas?   

The approximate entry point and exit coordinate of the proposed tunnel are 27°50'31" N, 83°32'24" E and 27°53'60" N, 83°28'36" E. The construction of road tunnel reduces the tentative length of the road by up to 15 Km and hence  reduces the travel time making travel safe in a geographically steep terrain. The tunnel will be constructed under the DB or EPC Contract Model. The assignment has been scheduled for a period of 6 months. Expected date of commencement of the assignment is 02-03-2022. Contact DOR-Quality Research and Development Centre, Chakupat,  Lalitpur, email dgdor@dor.gov.np. Visit  www.bolpatra.gov.np/egp or www.dor.gov.np. Ref.n. QRDC/78/79/EOI-17. 01/22.   

 




Permalink

Nepal, Mid-Western Region - np/25

Highway

Closing Date: 14.01.2022 (Tender Closed)


Request for Expression of interest, deadline 14/01/2022, for Consultancy service to perform Feasibility Study of Jajarkot (Byaulidhunga) - Jumla (Imlicha khola) road tunnel on the Highway Rara - Rajmarga NH56,  connecting the Jajarkot and Jumla districts. The tunnel will be constructed under DB or EPC Contract Model. The distance from Sangta of Jajarkot to Imilchaghari of Jumla is around 10 km. Contact DOR-Quality Research and Development Centre, Chakupat,  Lalitpur, email dgdor@dor.gov.np. Visit  www.bolpatra.gov.np/egp or www.dor.gov.np. Ref.n. QRDC/78/79/EOI-16. 01/22.   

 




Permalink

Nepal, Bagmati Pradesh Province - np/24

Highway


Request for Expression of Interest, deadline 17/09/2020, for Consulting Service for the Construction Supervision of the 3.2km bitube Posta Bahadur Bogati Tunnel Project (Bhimphedi Kulekhani).  The assignment has been scheduled for a period of 42 Months for the Construction Period and 12 Months for Defect Liability Period. Contact Ministry of Physical Infrastructure Development Province No-3 Rural Road Division Makawanpur,Hetauda,  Makwanpur, email s3mopid@gmail.com. Visit https://www.bolpatra.gov.np/egp. Ref.n. MoPID/BAG/ICB/CS/01/2077/78. 35/20. 



Permalink


The following shortlisted consulting firms are requested to collect Request for proposal, deadline 16/05/2021,  for Consulting Service for the Construction Supervision of the 3.2km bitube Posta Bahadur Bogati Tunnel Project (Bhimphedi Kulekhani): 

  • M/s Dolsar Engineering Inc. co (Dolsar), Dohwa Engineering Inc. Co. (Dohwa), Intercontinental Consultants and Technocrats Pvt Ltd (ICT) Joint Venture in association with Cemat Consultants Pvt Ltd, North Star Engineering Consultant Pvt Ltd and Infraconsult Pvt Ltd 
  • M/s Eptisa Servicios de Ingenieria SL (Eptisa), Yuksel Proje AS (Yuksel), Gozlem Muhendislik Muteahhitlik Planlama ve Tikaret AS (Gozlem) Joint Venture in association with Udaya Consultancy Pvt Ltd , Geocom Int’l Pvt Ltd and Slate Consultant Pvt Ltd 
  • M/s Isan Corporation, Korea (Isan) Joint Venture with Botek - Bosphorus Technical Consulting Corporation, Turkey (Botek) in association with Wekreate Int’l Pvt Ltd (Weki)  
  • M/s Meinhardt (Singapore) Pte Ltd (Meinhardt), Dasan Consultants Pvt Ltd (Dasan), National development Consutants Pvt Ltd (NDC) Joit Venture in association with Jade Consult Pvt Ltd (Jade), Nepal Consult Pvt Ltd (Nepal Consult) and Card Cosult Pvt Ltd (Card) 
  • M/s Smec Int’l Pty Ltd (Smec), Korea Engineering Consultants Corp (KECC), Cheil Engineering Co Ltd (Cheil) Joint venture in association with Total Management  Services Pvt Ltd (TMS), Radiant Consulting Consortium Pvt Ltd (Radiant) and Rays Consult Pvt Ltd (Rays) 
  • M/s Yooshin Engineering Corporation (Yooshin), Tec-Cuatro SA (Tec4), Full Bright Consultancy Pvt Ltd (FBC) Joint Venture  in association with Engineering Consultancy for Costructive Development Efforts in Nepal Pvt Ltd (ECoCoDe Nepal) 

Contact Ministry of Physical Infrastructure Development Province No-3 Rural Road Division Makawanpur,Hetauda,  Makwanpur, email s3mopid@gmail.com. Visit http://mopid.bagamati.gov.np. Ref.n. MoPID/BAG/ICB/CS/01/2077/78. 15/21. 



Permalink

Nepal, Western Development Region - np/23

Highway

 

International competitive bidding, deadline 07/07/2021, for Planning, Design, Engineering, Procurement, Construction, Commissioning and Five Years of Service Operation & Maintenance of One Double Lane Standard Highway Tunnel, Rock Shed Structure, Rock Fall Mitigation and Road Works of the Siddababa Tunnel Project on an Engineering Procurement Construction (EPC) basis - all Complete. The 1126 m Siddhababa tunnel will be along the Butwal-Palpa section of the Siddhartha Highway connecting Chidiyakhola (Rupendehi) to Dobhan (Palpa). 

For tender documents visit www.bolpatra.gov.np/egp where tenders must be sent. 

Contact the Government of Nepal, Ministry of Physical Infrastructure and Transport,  Office of Department of Roads, Quality Research and Development Center, Chakupat, Lalitpur, Nepal, tel +977-1-5260505email dorqrdc@gmail.com. For further in the tender, please click here. Ref.n. DOR_QRDC/EPC/ICB/STP/077/78-05. 25/21. 

 




Permalink