The Joint Venture Mostostal Warszawa Sa from Varsaw and Acciona Construccion SA from Madrid secured the EUR392.92 million (PLN1.81 bn), excluding VAT, for the design and construction of the 10.3km section from the Rzeszow Południe junction (not included) to the Babica junction (included) of the S19 expressway, including a 2 km tunnel. Contact Gddkia, attn Agnieszka Sroczyk, Rzeszow, tel +48 178534071, fax +48 178536484, email sekretariat_rzeszow@gddkia.gov.pl. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid= 360747-2020. Ref.n. O.RZ.D-3.2410.1.2019. 32/20.