Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Grand St Bernard - it/91

Motorway

Invitations to tender due for design of $35 million TBM-driven 5.8 km-long x 3.8 m-diameter emergency evacuation route for Grand St Bernard tunnel to be constructed over two years from 2002, including 18-22 m-long drill/blast cross passages at 240 m intervals. Feasibility underway by Sina, with SDI and Lami. Visit www.valdaosta.it 36/01.Open invitation to tender, deadline 16.02.2009, for construction of safety and security tube and connections at Grand St Bernard tunnel from north and south portals, value EUR36 million. Work sites at Community of Bourg-Saint-Pierre, Canton of Vallese in Switzerland and Community of Saint-Rhemy-en-Bosses, Val d'Aosta in Italy. Duration of contract 1,250 days. Specs, docs and info from Sitrasb, tel +39 1 6536 3641, e-mail sitrasb@sitrasb.it, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=298006-2008 47/08.



Permalink

Award of contract, value EUR33,400,814 excluding VAT, to Condotte/Cossi for construction of safety tunnel and connections from north and south portals at Grand St Bernard tunnel. More from Condotte d'Acqua, tel +39 0688334-1, fax -590, e-mail condotte@condotte.com http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=225318-2009 34/09.



Permalink

Italy, Lombardy - it/90

Railway

Restricted procedure, deadline 27th August, 2003 for dualling of the Carnate Usmate-Airuno section of the Milan-Lecco railway, including two tunnels in Roncaglia (379 m) and Beverate (2,202 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=119007-2003, OJ S 132, or contact Rete Ferroviaria Italiana, Milan, fax +39 0263717057. 30/03.Todini Costruzioni has secured a EUR100.8 million contract for dualling the Carnate Usmate-Airuno section of the Milan-Lecco railway, including two tunnels in Roncaglia (379 m) and Beverate (2,202 m). Visit www.todini.it 39/04.



Permalink

Italy, Vicenza - it/89

Motorway

Design contest notice, deadline 5th September, 2003 for preliminary design, environment impact study and geotechnical investigation for the Valsugana bypass on ex trunk road SS 47, section from Campese Business Park to Pian dei Zocchi. The project includes five double-tube tunnels: San Nazario (4.8 km), Lanari (90 m), Val Cavallini (500 m), Solagna (3.3 km) and Pove (730 m). All bored tunnels except Lanari in cut-and-cover. Carriageway width 9.75 m, height 7.55 m. Cost estimate for the tunnels: €193 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=114943-2003, OJ S 128, or contact Provincia di Vicenza, Vicenza, fax +39 0444399436. E-mail turetta.andrea@provincia.vicenza.it 30/03.SWS Engineering, Bonifica and Studio Geotecnico won a EUR1.7 million contract for the preliminary study, the environmental impact study and the geotechnical investigation for the 12.8 km Rivalta-Pian dei Zocchi section to bypass the Valsugana road SS 47. The project, estimated at EUR244 million, requires five or six double tunnels totalling 9.8 km, the longest being in San Nazario (4.8 km). Click it/89. Visit www.swsengineering.it, www.bonifica.it and www.studio-geotecnico.it 06/04.



Permalink

Italy, Liguria - it/88

Road

Accelerated restricted procedure, deadline 30th July, 2003 for construction of section San Lazzaro-Sanremo city centre, north carriageway, including the 1.5 km San Giacomo tunnel. Single tube, radius 5.15 m, finished width 8.5 m, to be driven using traditional tunnelling means. Tender value: €35.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=110539-2003, OJ S 123, or contact ANAS, Roma, fax +39 064454956. Visit www.stradeanas.it 29/03.Accelerated restricted procedure, deadline 9th December, 2003 for construction of the Pieve di Teco bypass in Imperia province (Liguria). Includes a single-tube tunnel to accomodate two lanes plus pavements, 1,824 m in length and 10.5 m in width. Umbrella vaults at the portals (2 x 30 m). Sequential excavation using hydraulic hammers. There will be two drives. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=193252-2003, OJ S 215, or contact ANAS, Rome, fax +39 064454956. Visit www.stradeanas.it 47/03.Accelerated restricted procedure, deadline 16th December, 2003 for construction of the Chiusavecchia bypass in Imperia province (Liguria). Includes two single-tube tunnels in Madonna del Olivetto (1,425 m) and Torria (460 m). Radius: 6.3 m and height from invert to roof: 10.05 m. Geology: San Remo flysch. Excavation method to be chosen by the contractor. Support with bolts, steel arches and shotcrete. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194867-2003, OJ S 217, or contact ANAS, Rome, fax +39 064454956. Visit www.stradeanas.it 47/03.Four tunnels are planned on the 9.2 km Pieve di Teco-Ormea bypass on trunk road SS 28 Colle di Neva linking Piedmont and Liguria: Monte San Bernardo (1,860 m), Trovasta (637 m), Boschi Sottani (981 m) and Armo-Cantarana (2,874 m). The Armo-Cantarana tunnel would consist in widening a pilot tunnel bored in the early 1990s. Estimated cost of EUR220 million. Tenders have already been invited for the first tunnel. Click it/88. 04/04.Lauro and Cogeis secured a EUR41.2 million contract to build the Pieve di Teco bypass on trunk road SS 28 Colle di Nava, including a 1.8 km tunnel. Visit www.cogeis.it 07/05.Accelerated restricted procedure, deadline 4th May, 2006 for final design including geotechnical and environmental surveys and first recommendations for work safety for the 9.2 km Pieve di Teco-Ormea bypass on road SS 28 in Imperia province. The project includes the following tunnels: Monte San Bernardo (1,824 m), Trovasta (637 m), Boschi Sottani (981 m) and Armo-Cantarana (2,874 m). The Armo-Cantarana tunnel will consist in widening an existing pilot tunnel. Construction of the first tunnel has already been awarded. Click it/88. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=063928-2006, OJ S 61, or contact ANAS, Rome, fax +39 064454956. 15/06.Tenders for the completion of section San Lazzaro-Sanremo Centre, north carriageway on the new road SS 1 bypass Aurelia Bis (new Aurelia) in Sanremo were invited in 2003 on a design/build basis. The contract has been awarded to a JV between Provera e Carrassi and Polidori Costruzioni on 19th March, 2007. The executive design approved by ANAS, the national road administration, has been undertaken by Alpina. The project mainly consists in completing the San Lazzaro junction, constructing the San Giacomo tunnel and the Sanremo Centre junction. The scheme stretches 2,150 metres approximately in all. Construction of the San Giacomo tunnel and work supervision amount to EUR22 million. Visit www.proveraecarrassi.it and www.alpina-spa.itThe San Giacomo single bore tunnel is 1,501.68 m long. The excavated area varies from 100 square metres for the typical cross-section to 160 square metres for the enlarged cross-section where lay-bys will be bored to allow vehicles to park in case of emergency. There will be four such lay-bys, each approx. 60 metre long. There are no other underground structures within the project.The tunnel path crosses the Ligurian Alps and the geology is formed by a series of tectonic units, transported and piled up towards the outer limits of the Alpine furrow, which form part of a deformation of the Apennine age. The San Giacomo tunnel fully crosses Sanremo flysch, which consists of clayey schists, clayey marls and fine to medium sandstone. Narrow alluvial deposits run along the San Francesco and San Romolo rivers, predominantly fine materials, sand alluvium with gravels.Full-face traditional methods will be used, combining drilling and blasting and hydraulic breakers, depending either on the ground or the cover above the tunnel to avoid damage caused by vibrations to overlying buildings. A unique excavation face will be opened in San Lazzaro, working towards Sanremo Centre.The variety of Sanremo flysch obliges to adopt different support measures, ranging from Swellex bolts, shotcrete and welded mesh to steel beams and shotcrete. In particularly tricky geological areas, the face will be stabilised by fibre-glass nails or by drilling forepoles of steel piles inserted into holes and filled with cement to form an umbrella vault around the contour of the face. Visit www.swellex.comDumpers and rubber-tyred loaders will be used to take the excavated material from the face to a first dump site outside, where it will be crushed prior to be taken to the final dump. The tunnel follows the path of an existing pilot tunnel built by highway operator Autostrada dei Fiori during the final design phase to study the rock mass and optimize the subsequent cross-section designs and tunnelling methods. Read E-News Weekly 17/2007. 17/07.Restricted invitation to tender, deadline 8th September, 2008 for the design and construction of national road SS 1 "Nuova Aurelia", access to the Savona harbour and connection between the toll barriers on highway A10 in Savona and Albisola and the harbours of Savona and Vado. The approval of the executive project and the subsequent award of the contract is scheduled for January 2010. Construction is programmed to be concluded in October 2013. The new Aurelia bis road section, from Albisola Superiore to Savona (Torrente Letimbro), is 5.1 km in length altogether, whereof 3.9 km intunnel. This EUR246 million project will relieve coastal traffic and provide a direct link to the Savona harbour area. Click it/88. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=196421-2008, OJ S 146, or contact ANAS, fax +39 064456224 or 0644462009. E-mail r.memoli@stradeanas.it 32-33/08.Restricted invitation to tender, deadline 18.03.2009, for engineering design services for the construction of civil engineering works for the Pieve di Teco-Ormea bypass on road SS 28, including 2,874 m-long Armo-Cantarana tunnel. Contract value EUR3,350,000, duration 210 days. Contact Anas, Roma, Att.Condirezione Generale Legale e Patrimonio Unití  gare e Contratti, tel +39 (0)6 490326, e-mail r.memoli@stradeanas.it. Visit www.stradeanas.it. 11/09



Permalink

The JV Cooperativa Muratori e Cementisti C.M.C./Itinera SpA of Ravenna has secured the EUR107.6 million contract for the design and construction of national road SS 1 Nuova Aurelia, access to the Savona harbour, and connection between the toll barriers on highway A10 in Savona and Albisola and the harbours of Savona and Vado. The new Aurelia dual road section, from Albisola Superiore to Savona in Torrente Letimbro, is 5.1 km long with 3.9 km in tunnel. Contact ANAS, Rome, tel +39 (0) 6 4446-4729, fax -2009, e-mail s.coltellacci@stradeanas.it. Bid code: GE 34/08. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040603-2010, www.cmc.coop and www.itinera-spa.it. 08/10.



Permalink

Restricted invitation to tender, deadline 04.02.2009, for Lot 3 Filettino-A12 interchange of the SS1 Aurelia bypass access roads to La Spezia harbour. Value contract EUR183.6 million, VAT not included, of which EUR74.5 million for OG4 (tunnel). Contact Anas SpA, att.n Nicola Dinnella. Rome, tel +39 06 490326, fax +39 06 44462009, e-mail r.memoli@stradeanas.it. Bid Code GE50-08. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335970-2008. 01/09.



Permalink

The JV Co.e.stra SpA/Consorzio Etruria Scarl/S.e.c.o.l. SpA at Florence secured the EUR119.6 million contract for Lot 3 Filettino-A12 interchange of the SS1 Aurelia bypass, length over 4 km with 2.7 km in tunnel. The contract involves access roads to La Spezia harbour. Contact Anas SpA, att.n Condirezione generale legale e patrimonio, Rome, tel +39 06 44464729, fax +39 06 44462009, e-mail s.coltellacci@stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/24068. Bid Code: GE50-08 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167788-2010. 25/10.



Permalink

Open invitation to tender, deadline 19.01.2011, for tunnel equipment and roads maintenance in Imperia, Savona, Genova and La Spezia provinces. Contract value EUR740,000. Contact ANAS, Liguria Department, Bids and contracts office, Via Savona 3, 16129 Genova, tel +39 (0)10 54771, fax +39 (0)10 5477238. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/32760. Bid Code n. GE19-2010. 51/10.



Permalink

On 29.08.2011, following C Lotti & Associati Societa di ingegneria SpA project approval from Anas, lot 3 of the La Spezia bypass on Aurelia Bis was awarded. It comprises 4.5 km of roadway with 2.8 km in tunnel. Contract value EUR240 million, completion early-2015. Click here. 35/11.



Permalink

Open invitation to tender, deadline 17.09.2012, for the tests on construction materials of national road SS 1 new Aurelia, access to the Savona harbour, and connection between the toll barriers on highway A10 in Savona and Albisola and the harbours of Savona and Vado: bypass of SS 1 Aurelia between Albisola Superiore and Torrente Letimbro in Savona. Contract value EUR633 000 excluding VAT, duration 1,390 days. Contact Anas SpA, Bids and Contract Office, Genova, tel +39 (0)10 5477239, fax +39 (0)10 5477238. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/50246. Bid Code GELAV023-12. 33/12.



Permalink


Open invitation to tender, deadline 23/12/2020, for a qualified operator of energy services, including energy requalification and management of the public lighting system in the municipalities of Borghetto Santo Spirito, Finale Ligure, Spotorno, Stella and the Province of Savona (tunnels and roads). Contract value EUR6.42 million, excluding VAT. Duration of the contract 180 days. Contact Provincia di Savona, Savona, email f.butera@provincia.savona.it. For further information on the tender click here. Ref.n. 2031. 50/20. 

 




Permalink


Postponed from 23/12/2020 to the 25/01/2021 the deadline for the open invitation to tender for a qualified operator of energy services, including energy requalification and management of the public lighting system in the municipalities of Borghetto Santo Spirito, Finale Ligure, Spotorno, Stella and the Province of Savona (tunnels and roads). For tender documents click here. The value of the contract is EUR6.42 million, excluding VAT. Duration of the contract 180 days. Contact Provincia di Savona, Savona, email f.butera@provincia.savona.it. For further information on the tender click here. Ref.n. 2031. 53/20.

 




Permalink


Open invitation to tender, deadline 20/02/23, for Lot 3 Filettino-A12 interchange of the SS1 Aurelia bypass access roads to La Spezia Harbour from San Venerio interchange to Melara interchange. The contract includes monitoring during ad post construction. Click here for tender documents, where tenders must be sent. Contract value EUR82.19 million, excluding VAT, with EUR37.12 million belonging to OG4 category. Duration of works 887 days. Contact Anas SpA, Rome, email  appalti.lavori@postacert.stradeanas.it. Visit   http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=729306-2022. Ref.n. GE 34/22. 52/22.. 

 



Permalink


Angelo Antonio Costruzioni Generali Srl from Montefalcione secured the EUR 78.27 million contract, excluding VAT, for Lot 3 Filettino-A12 interchange of the SS1 Aurelia bypass access roads to La Spezia Harbour from San Venerio interchange to Melara interchange. The contract includes monitoring during ad post construction. Contact Anas SpA, Rome, email  appalti.lavori@postacert.stradeanas.it. Visit   http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=544341-2023. Ref.n. GE 34/22. 36/23. 



Permalink

Italy, Savona - it/87

Highway

Accelerated restricted procedure, deadline 30th July, 2003 for construction of the Carcare and Vispa Hill bypass, including the Collina del Vispa and Monte Grosso tunnels, 363 m and 1442.5 m respectively, to be driven using traditional tunnelling means and in cut-and-cover (20 m and 94 m respectively). Tender value: €38.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=110538-2003, OJ S 123, or contact ANAS, Roma, fax +39 064454956. Visit www.stradeanas.it 29/03.



Permalink

Italy, Genoa-Ventimiglia - it/86

Railway

  The three shortlisted candidates for the dualling of the railway between Genoa and Ventimiglia, section San Lorenzo al Mare-Andora, are Toto Costruzioni / Coopcostruttori (lowest bidder with a 7.77% discount); Ferrovial-Agromí¡n / Cossi Costruzioni (4.71% discount); and Astaldi (2.79% discount). Nine single-tube double-track tunnels, finished cross section 80 sq m, will be built: Poggi (2,080 m), Terra Bianca (466), Caramagneta (197), Bardellini (2,920), Gorleri (3,093), Castello (485), Caighei (2,618), San Simone (133) and Colle Cervo (3,115). Conventional tunnelling, drill/blast or hydraulic hammer. Also 50 to 60 m-long umbrella vaults at portals at each end of each tunnel. Cost around €187 million. Read E-News Weekly 8/2003. Visit www.italferr.it 28/03. The two shortlisted bidders for the €334.4 million dualling of the San Lorenzo al Mare-Andora section are Ferrovial-Agromí¡n / Cossi Costruzioni (-4.71%) and Astaldi (-2.79%). The two other bidders have appealed to the court. The section necessitates the building of nine single-tube double-track tunnels for a total length of 15.1 km. Visit www.autostrade.it 31/03.Cossi Costruzioni and Ferrovial Agromí¡n won a contract to dual the San Lorenzo-Andora section of the Genoa-Ventimiglia railway for €319.1 million and a time frame of 47 months. The 18.8 km section requires the building of eleven tunnels which total 16.3 km altogether (86% of the alignment). The drill/blast method will be used. The project also includes three viaducts and two new stations in Imperia and Andora. Click it/86. Read E-News Weekly 8/2003. Visit www.cossi.com and www.ferrovial.com 02/04.



Permalink

Open invitation to tender, deadline 03.03.2011, for the completion of rock and cut/cover tunnels for the dualling of the railway between Genoa and Ventimiglia, San Lorenzo al Mare-Andora section. Contract value EUR38.29 million. Contact Italferr SpA, Rome, attn Angelo Putaturo, tel +39 0649752446, fax +39 0649752445, e-mail gareappalti.italferr.it@legalmail.it. Bid code PA-1154. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=004714-2011. 02/11.



Permalink

Invitation to tender using restricted procedure, deadline 07.03.2011, for OM., control and testing of the firefighting line in the tunnels Santo Stefano (7,850 m), Capo Verde (5,350 m) and Capo Nero (7,200 m) on Genova Sampierdarena-France border. Contract duration 24 months, value EUR216,040 excluding VAT. Contact RFI SpA, Genova, tel +39 010 27432-62, fax -53.Visit www.gare.rfi.it/cms/v/index.jsp?vgnextoid=7050b09d420fd210VgnVCM1000003f16f90aRCRD. Bid Code : DLE.GE.2010.045. 07/11.



Permalink

Tecnis SpA (Tremestieri Etneo, CT) secured the EUR30.26 million contract, VAT not included, for the completion of rock and cut/cover tunnels for the dualling of the railway between Genoa and Ventimiglia, San Lorenzo al Mare-Andora section. Contact Italferr SpA, Rome, attn Antonio Amicone, tel +39 0649752395, fax +39 0649752445, e-mail gareappalti.italferr.it@legalmail.it. Bid code PA-1154. Visit www.tecnis.it and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061117-2012. 09/12.



Permalink

TCI Srl (Massa) secured the EUR1.36 million contract for modifying and integrating filters and smoke control systems, as well as escape routes arrangement for Terzorio windows (access to the tunnel S. Stefano), Ospedaletti (access to the gallery Capo Nero) and Valle Armea (access to the gallery Capo Verde) on the Genoa–Ventimiglia railway, section Imperia Porto Maurizio. Contact RFI SpA, Genoa, fax +39 010 2743253. Visit http://www.gare.rfi.it/cms/v/index.jsp?vgnextoid=bdcd16c4fcb47310VgnVCM1000008916f90aRCRD and www.tcionline.it. Bid Code DLE.GE.2012.003. 22/12.



Permalink

ABB-Power System Division (Genova) secured the EUR222,482 contract for equipment to modify and improve the safety supervision system of safety exits at Ospedaletti, Valle Armea and Terzorio. Contact RFI, Genova, fax +39 010 2743253. Visit http://www.gare.rfi.it/cms-file/allegati/gare-rfi/DLE_GE_2011_019_ESITO.pdf. Bid Code n. DLE_GE_2011_019. 30/12.



Permalink

Open invitation to tender, deadline 18.02.2013, for railway equipment in Imperia, Andora stations on the twin track Taggia-Andora section, in mono track Andora-Alassio section and for TLC and MPE (Motive Power & Equipment) equipment needed for tunnel safety and MT/BT transformation cabins in Andora, Diano and Imperia. Contract value EUR14.72 million, duration 130 days for the design and 300 days for works. Contact Italferr SpA, att.n Alessia Petruzzelli, Rome, tel +39 0649752910, fax +39 0649752445, e-mail  gareappalti.italferr.it@legalmail.it. Visit www.gare.italferr.it/cms/v/index.jsp?vgnextoid=6843ab2c09cbb310VgnVCM1000008916f90aRCRD and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=408062-2012. Bid Code n. PA-1199. 01/13.



Permalink

Ceit Impianti Srl at Sambuceto — San Giovanni Teatino (CH) secured the EUR9.8 million contract, excluding VAT, for railway equipment in Imperia, Andora stations on the twin track Taggia-Andora section, in mono track Andora-Alassio section and for TLC and MPE (Motive Power & Equipment) equipment needed for tunnel safety and MT/BT transformation cabins in Andora, Diano and Imperia. Contact Italferr SpA, att.n Martina Salerno, Rome, tel +39 0649752178, fax +39 0649752445, e-mail  gareappalti.italferr.it@legalmail.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165351-2014. Bid Code n. PA-1199. 21/14.



Permalink

Ceit Impianti Srl of San Giovanni Teatino (CH) secured the EUR9.8 million contract, excluding VAT, for railway equipment in Imperia, Andora stations on the twin track Taggia-Andora section, in single track Andora-Alassio section, and for TLC and MPE (Motive Power & Equipment) equipment needed for tunnel safety and MT/BT transformation cabins in Andora, Diano and Imperia. Contact Italferr SpA, att.n Martina Salerno, Rome, tel +39 0649752178, fax +39 0649752445, e-mail  gareappalti.italferr.it@legalmail.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165351-2014. Bid Code n. PA-1199. 24/14.



Permalink

The joint venture between RTI Mi.Cos. Spa /Sveco Spa at Rome secured the EUR5.23milliuon contract, excluding VAT, civil works maintenance in tunnels belonging to the Genoa DTP (Direzione Territoriale Produzione). Contact Rete Ferroviaria Italiana SpA, Genoa, tel 39 010 2742929. Visit http://www.gare.rfi.it/cms-instance/bandigare/gare-rfi_2014/DTP_GE_0585_ESITO.pdf.

Ref.n. GE-0585-2018. 38/18.




Permalink

Italy, Liguria-Piedmont - it/85

Highway

Open call for bids, deadline 2nd July, 2003 for the feasibility study for a A 6-A 26 highway connection between Carcare in Savona province (Liguria) and Predosa in Alessandria province (Piedmont). The connection would be 60 km in length, 35% of which in twin tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=089415-2003, OJ S 96, or contact Comune di Cairo Montenotte, Cairo Montenotte, fax +39 01950707400. E-mail artec.cairo@libero.it 23/03.



Permalink

Italy, Tarvisio - it/84

Gas Pipe

Negotiated call for tenders, deadline 30th April, 2003 for construction of a 6.2 km 1,200 mm ID methane gas duct requiring the Prisnig tunnel and two microtunnels under Monte Lussari and Monte Coston Tedesco in Udine province. Two options for Prisnig tunnel. Solution A is 2,350 m-long, inner diameter 3.8 m using a double-shield TBM, lining with concrete segments. Solution B is 2,600 m-long, inner diameter 4.8 m using a TBM and conventional means, lining as the tunnel progresses or later on as per the rock characteristics. Monte Lussari microtunnel is 1.1 km-long, ID 2.4 m and Monte Coston Tedesco tunnel is 450 m-long, ID 2.4 m. Both to be driven using a full-section double-shield machine, lining with concrete segments. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=066643-2003, OJ S 75, or contact SNAM Rete Gas, San Donato Milanese, fax +39 0252038511. Also visit www.snamretegas.it 17/03.SNAM Rete Gas has awarded to a JV of Strabag, Quincinetto-based Cogeis and Icop, a local microtunnelling specialist, the contract to build a 6.2 km gas pipe in Tarvisio municipality, including the 2,600 m-long 4.80 m-inner diameter Prisnig tunnel, the 1.1 km-long 2.4 m-inner diameter Monte Lussari tunnel and the 450 m-long 2.4 m-inner diameter Monte Coston Tedesco tunnel. Tunnelling of the Prisnig tunnel is expected to be difficult as the calcareous geology will mostly be karst with the possibility of caverns prone to fill with gypsum. Strabag will use a Jarva open type TBM, model MK 15, built in 1994 and previously used on the Iquique project in Chile. Visit www.snamretegas.it, www.strabag.at and www.cogeis.it 05/04.



Permalink

Italy, Carrara - it/83

Road

Open call for bids, deadline 8th April, 2003 for construction of lot 1 "Miseglia" of the Marble Road including the 998 m-long 9 m-wide Santa Croce tunnel, single tube, and a 270 m-long emergency tunnel. Tender value €18.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030187-2003, OJ S 36, or contact Progetto Carrara SpA, Carrara, fax +39 058570842. Also visit www.comune.carrara.ms.it 10/03.Open call for bids, deadline 18th April, 2005 for construction of lot II Aurelia (4.5 km) on the Marble road, including three single bored tunnels: Monte Greco (2,399 m), Corvenale (211 m) and Macina (900 m), and one cut-and-cover tunnel (30 m). Each tunnel will carry two 3.5 m-wide lanes, two 1 m-wide shoulders and two 0.8 m-wide pavements. Drill/blast method with steel arches, welded mesh and shotcrete as support, plus fore piling, bolting and jet grouting when necessary. Tender estimate: EUR68 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=040294-2005, OJ S 42, or contact Progetto Carrara SpA, Carrara, fax +39 0585778623. E-mail progettocarrara@progettocarrara.191.it and view a video at www.comune.carrara.ms.it/Allegati/380.wmv 11/05.



Permalink

Italy, Turin - it/82

Road

Preinformation notice for the construction of the SR 23 bypass in Pinerolo, San Secondo, Porte and San Germano including two tunnels: Craviale (1,043 m) and Turina (660 m). Tender value: €55-€57 million. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=010222-2003 or contact Agenzia per lo svolgimento dei XX Giochi Olimpici Invernali Torino 2006, Turin, fax +39 0115221214. Also visit www.agenziatorino2006.it 05/03.Open call for bids, deadline 5th June, 2003 for construction of the Porte bypass including the Craviale and Turina tunnels, lengths of 1,043 m and 660 m respectively. Engineering studies by Studio Corona / Geodata / Infratec / Italtec Ingegneria / Franco Grasso / Vincenzo Procopio / Pietro Rousset. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=077531-2003, OJ S 87, or contact Agenzia per lo svolgimento dei XX Giochi Olimpici invernali, Turin, fax +39 0115221214. Also visit www.agenziatorino2006.it 20/03.The Porte bypass to trunk road SS 23 in Sestriere will be built by Baldassini Tognozzi Costruzioni for €42.5 million. Includes two tunnels in Turina (660 m) and Craviale (1,043 m). Visit www.baldassinitognozzi.it 37/03.Preinformation notice for construction of the Avigliana bypass, including a 1.7 km tunnel connecting Buttigliera and Avigliana and a 250 m tunnel under the Torino-Modane railway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=003963-2004, OJ S 5, or contact Agenzia per lo svolgimento dei XX Giochi Olimpici invernali, Turin, fax +39 0115221214. Also visit www.agenziatorino2006.it 03/04.Baldassini Tognozzi acquired a new three-boom Rocket Boomer WL3 C supplied by Atlas Copco to drive the 1,060 m-long Craviale tunnel. To date, 200 m has been driven on the east drive. Two blasts per day. The local residents are warned prior to each blast. Later on, the machine will start the west drive, where construction of the portal is under way, to allow for concreting on the east drive. Atlas Copco also supplied a two-boom Rocket Boomer 353 for the 600 m Turina tunnel. First blast scheduled for mid-March. Portals under way. Explosives supplied by SEI. Visit www.atlascopco.com, www.sei-spa.com and www.baldassinitognozzi.it 10/04.Agenzia Torino 2006 awarded to Grassetto, CO.GE.FA, Kopa Engineering, Euroimpianti Electronic, and Torino Elettrica Costruzioni contract 1 of the road 589 bypass in Avigliana, which will connect motorway A32 Turin-Bardonecchia. The contract is worth EUR53 million. Contract 1 includes a 1,960 m bored tunnel under Mount Cuneo and a cut-and-cover tunnel under Bachiasso interchange. Visit www.agenziatorino2006.it and www.grassetto.it 30/04.



Permalink