Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Hesse - de/46

Motorway

Design contracts awarded to Emsch & Berger for 1.3 km-long Holstein and 750 m-long Bubenrad tunnels, and Obermeyer for 720 m-long Buchberg tunnel. Construction tenders expected 2003 for start two years later 16/01. The Road Directorate in Kassel has awarded the Walberg tunnel (284 and 215 metres), and the Hopfenberg tunnel (543 and 539 metres) to a jv of Züblin Alpine Bau, Bickhardt Bau, and Gebr. Bommhardt for DM56 million. 01/02. Award of the work supervision contracts for the Walberg tunnel (284 and 215 metres) to Bung, and for the Hopfenberg tunnel (543 and 539 metres) to Müller + Hereth. 03/02. Negotiated procedure, deadline 2nd December, 2002 for technical equipment and supervision of its installation for the Walberg tunnel (2 x 260 m) and Hopfenberg tunnel (2 x 520 m). Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=168495-2002, OJ S 212, or contact Amt für StraíŸen- und Verkehrswesen, Kassel, fax +49 561 7286400. 45/02.Müller + Hereth has scooped an engineering and design contract for a 1.3 km tunnel on motorway A44. Visit www.mueller-hereth.com 09/03.Preinformation notice for installation of electrical equipment, traffic control systems, fire alarm systems, lighting and signalling, ventilation systems, radio communication systems in the Walberg and Hopfenberg tunnels. Both are twin-tube tunnels, 280 m and 550 m in length respectively. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=189047-2003, OJ S 210, or contact Amt für StraíŸen- und Verkehrswesen, Kassel, fax +49 5617286208. 45/03.Bung has won a planning contract for the equipment of the 2 x 540 m-long Hopfenberg tunnel. Visit www.bung-gmbh.de 48/03.Preinformation notice for design of three tunnels on motorway A44 in Trimberg (597 m), Spitzenberg (626 m) and Boyneburg (1,668 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=048142-2004, OJ S 56, or contact Tunnelbau & Betrieb im Amt für StraíŸen- und Verkherswesen, Eschwege, fax +49 565192966. 14/04.Negotiated procedure, deadline 11th June, 2004 for design services for the Trimberg, Spitzenberg and Boyneburg tunnels on motorway A44 between Waldkappel and Sontra North. Lengths: 597 m, 626 m and 1,668 m respectively. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=071187-2004, OJ S 83, or contact Amt fuer Strassen- und Verkehrswesen, Eschwege, fax +49 5651929666. E-mail sven-eric.haeger@hsvv.hessen.de 19/04.OSMO Anlagenbau has secured a EUR4.1 million contract to equip the Walberg and Hopfenberg twin tunnels on motorway A44 with electrical outfit, traffic control systems, fire alarm systems, lighting and signalling, ventilation systems, radio communication systems, etc. The Walberg tunnel is 284 and 215 m long and the Hopfenberg tunnel is 543 m and 539 m long. Visit www.osmo-anlagenbau.de 40/04.Negotiated procedure, deadline 26th June, 2006 for construction of the Helsa tunnel in Hesse on highway A44. Length: 1,400 metres (north tube) and 1,458 metres (south tube), with two lanes per tube. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=106409-2006, OJ S 99, or contact Amt fuer Strassen- und Verkherswesen Kassel, Kassel, fax +49 5617667151. E-mail post.asv-kassel@hssvv.hessen.de 23/06.The call for bids with deadline 26th June, 2006 for construction of the Helsa tunnel in Hesse on highway A44 has been cancelled. Click de/46 for details. 45/06.Negotiated invitation to tender, deadline 8th August, 2008 for planning of the two-lane Hirschhagen tunnel (4,128 m / 4,187 m) on highway A44 Kassel-Herleshausen. The tunnel may be built using NATM or by TBM. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=170397-2008, OJ S 128, or contact Amt fuer Strassen- und Verkherswesen Kassel, Kassel, fax +49 5617667150 or 5651929511. E-mail post.asv-kassel@hsvv.hessen.de 28/08.Prior information for award procedures starting 21.01.2009 for 1,350 m-long twin tube Kuechen tunnel on the Kassel-Herleshausen section of A44 motorway. Engineer's estimate EUR55.89 million excluding VAT. Duration of contract 28 months from 01.10.2009 to 31.01.2012. Contact Kassel Roads Dept tel +49 561 766-70 (fax -7150) http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=269348-2008 or visit www.hmdf.hessen.de 43/08.Prior information for award procedures starting 08.12.2008 for 700 m-long twin tube Schulberg tunnel on Kassel-Herleshausen section of A44 motorway. Engineer's estimate EUR36.02 million excluding VAT. Duration of contract 32 months from award. Contact Kassel Roads Dept tel +49 561 766-70 (fax -7150) http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=269347-2008 or visit www.hmdf.hessen.de 43/08.Open invitation to tender, deadline 31.03.2009, for construction of 700 m-long twin tube Schulberg tunnel on Kassel-Herleshausen section of A44 motorway, starting 02.11.2009 for completion 31.12.2012. Some 370 m of the tunnel will be mined, with the remaining 330 in cut and cover. Engineer's estimate EUR36.02 million. Further information from Frau Geiger at ASV Kassel, tel +49 5617667-202, fax -345, e-mail frauke.geiger@hsw.hessen.de to whom tenders and requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=040497-2009 07/09.



Permalink

The JV Beton und Monierbau Innsbruck GmbH (Werne) secured the contract, value EUR36 million, for construction of 700 m-long twin tube Schulberg tunnel on Kassel-Herleshausen section of A44 motorway. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=264458-2009. 40/09.



Permalink

Prior information notice of scheduled start of award procedures on 02.08.2010 for construction of 4.137 km-long, twin tube Hirsch Hagen tunnel on 6.05 km stretch of A44 Kassel-Herleshausen between Helsa-Ost and Hessisch-Lichtenau West with associated portals, retaining walls, culverts and bridge, value EUR285 million excluding VAT. Construction starts 01.08.2011 for completion 31.07.2015. More information from ASV Kassel, tel +49 5617667-0, fax -150. For construction tender history of this motorway, visit tunnelbuilder archive de/46. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=110282-2010. 16/10.



Permalink

Prior information notice that award procedures will begin on 14.06.2010 for construction of A44 Kassel-Herleshausen, Hessisch-Lichtenau section VKE 32 from 27+000 km to 31+342 km in 9 lots, with Lot No 7 comprising 1.35 km-long x 9.5 m-wide twin-tube Kuechen tunnel, contract value EUR42.5 million, duration 34 months commencing 13.09.2010. More from Thomas Gand at ASV in Kassel, tel +49 560291779-50, fax -20, e-mail thomas.gand@hsw.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=144939-2010. 20/10.



Permalink

Negotiated invitation to tender, deadline 27.01.2011, for supervision services during construction of the 1,350 m-long twin tube Kuechen tunnel on the A44 motorway. Contract value EUR75 million, excluding VAT, duration 01.06.2011 to 31.08.2014. Further information, specs and docs from Hessisches Landesamt fur Strassen-und Verkehrswesen, Wiesbaden, tel +49 611366-0, fax -3435, e-mail post.hlsv@hsvv.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388335-2010. 01/11.



Permalink

Negotiated invitation to tender, deadline 23.02.2011, for testing and counselling.services for 1,350 m-long twin tube Kuechen tunnel on the A44 motorway. Further information, specs and docs from Hessisches Landesamt fur Strassen-und Verkehrswesen, Wiesbaden, tel +49 611366-0, fax -3435, e-mail post.hlsv@hsvv.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=21905-2011. 04/11.



Permalink

Accelerated negotiated invitation to tender, deadline 09.08.2011, for engineering services for construction of 1,350 m-long twin-tube Kuechen tunnel on A44 motorway. Further information, specs and docs from Hessisches Landesamt fur Strassen-und Verkehrswesen, Wiesbaden, tel +49 611366-0, fax -3435, e-mail post.hlsv@hsvv.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=239542-2011. 31/11.



Permalink

Open invitation to tender, deadline 02.08.2012, for construction of 4.1 km-long twin tube Hirschhagen tunnel on Kassel-Herleshausen section of A44 motorway with 1.8 km of cross-passages, bridge, buildings and associated work. Contract commences 25.02.2013 for completion 02.10.2017. Further information from ASV Kassel, tel +49 5617667-0, fax –151, e-mail ausschreibungen.kassel@mobil.hessen.de to whom tenders and requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167704-2012. 22/12.



Permalink

Award of contract, value EUR73,974,152 to BTK, c/o Marti Tunnelbau of Moosseedorf, Switzerland, for construction of 1,350 m-long twin-tube Kuechen tunnel on A44 motorway. Further information from Hessen Mobil Strassen-und Verkehrsmanagement Kassel, tel +49 5617667-0, fax -150, e-mail post.hlsv@hsvv.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258124-2012. 33/12.



Permalink

Negotiated invitation to tender, deadline 11.12.2012, for architectural, engineering and planning services during construction of 4.1 km-long twin tube Hirschhagen tunnel on Kassel-Herleshausen section of A44 motorway with 1.8 km of cross-passages, bridge, buildings and associated work. For more information contact Hessen Mobil - Strassen- und Verkehrsmanagement Zentrale, Wiesbaden, att.n Mrs Morler/Mr Dittrich, tel +49 6113663212, fax +49 6113663303, e-mail  heike.moerler@mobil.hessen.de. Send offers to Mrs Verena Toepfer, tel +49 6113663246, fax +49 6113663435, e-mail verena.toepfer@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=359544-2012. 47/12.



Permalink

The JV Baresel + Koester of Leinfelden-Echterdingen, Germany secured the contract for construction of 4.1 km-long twin tube Hirschhagen tunnel on Kassel-Herleshausen section of A44 motorway with 1.8 km of cross-passages, bridge, buildings and associated work. Contact Hessen Mobil Strassen- und Verkehrsmanagement Kassel, tel +49 5617667-0, fax –151, e-mail ausschreibungen.kassel@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=042570-2013. 08/13.



Permalink

Dipl.-Ing. Maempel of Bochum secured the EUR329,221.28 contract, including 19 percent VAT, for engineering testing for the construction of the Hirschhagen tunnel  (4,147 m, 4,204 m) on the Kassel-Herleshausen section of A44 motorway. Contact Hessen Mobil - Strassen- und Verkehrsmanagement Zentrale, Kassel, tel +49 56176670, fax +49 5617667150, e-mail ausschreibungen.kassel@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=109956 -2013. Ref. N.: 269/10782. 14/13.



Permalink

BG BUNG/mueller+hereth/EDR of Heidelberg secured the EUR6.35 million contract, including 19 percent VAT, for architectural, engineering and planning services during construction of 4.1 km-long twin tube Hirschhagen tunnel on Kassel-Herleshausen section of A44 motorway with 1.8 km of cross-passages, bridge, buildings and associated work. Contact Hessen Mobil - Strassen- und Verkehrsmanagement Zentrale, Kassel, tel +49 56176670, fax +49 5617667150, e-mail ausschreibungen.kassel@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=109954 -2013. Ref. N.: 269/10793. 14/13.



Permalink

Negotiated invitation to tender, deadline 15.10.2013, for health and safety coordination from design to construction of Waldkappel-Sontra-Nord section of A44 Kassel-Wommen motorway. The section includes three bridges and the following three bi-tube tunnels: Trimberg (573 m, 597 m), Spitzenberg (626 m, 626 m) and Boyneburg (1,714 m, 1,682 m). Time limit for receipt of requests for documents or for accessing documents: 14.10.2013. Contact DEGES, att.n Mr Riesel, Berlin, tel +49 3020243355, fax +49 3020243791, e-mail vv-ing@deges.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=300839-2013. 37/13.



Permalink

Ruecker + Schindele Beratende Ingenieure GmbH of Munich secured the EUR366,169.79 contract, including VAT at 19 percent, for technical equipment in 1,350 m-long twin tube Kuechen tunnel on the Kassel-Herleshausen section of A44 motorway. Contact Hessen Mobil Strassen- und Verkehrsmanagement at Eschwege tel +49 56519290 fax +49 5651929666, e-mail info.eschwege@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008265-2014. 03/14.



Permalink

Krebs und Kiefer Beratende Ingenieure fuer das Bauwesen GmbH of Berlin secured the EUR499,920 contract, excluding VAT, for health and safety coordination from design to construction of Waldkappel-Sontra-Nord section of A44 Kassel-Wommen motorway. The section includes three bridges and the following three bi-tube tunnels: Trimberg (573 m, 597 m), Spitzenberg (626 m, 626 m) and Boyneburg (1,714 m, 1,682 m). Contact DEGES, att.n Mr Riesel, Berlin, tel +49 3020243355, fax +49 3020243791, e-mail vv-ing@deges.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=148271-2014. 18/14.



Permalink

Negotiated invitation to tender, deadline 10.03.2015, for equipment and maintenance of Hirschhagen tunnel (4,174 m, 4,204 m) on the A 44 motorway Kassel-Herleshausen. Contact Hessen Mobil, attn Mr Richter/Mr Dittrich), Wiesbaden, tel +49 6113663374, fax +49 6113663303, e-mail christian.richter@mobil.hessen.de. Offers to Hessen Mobil, dept Q11, attn Mrs Yvonne Piana, Wiesbaden, tel +49 6113663421, fax +49 6113663435, e-mail  yvonne.piana@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=49223-2015. Ref. n. 9j6-A44 Tunnel Hirschhagen TTA. 07/15.



Permalink

Negotiated invitation to tender, deadline 03.06.2015, for structural engineering works in C22 AS Ringgau - AS Sontra West and C23 AS Sontra West - TB Riedmuehle sections, including the bi-tube tunnels Boyneburg (1,698 m) and Holstein (1,653 m) on the A44 motorway Kassel-Herleshausen. Duration of contract 20 months from award. Contact DEGES, Berlin, tel +49 3020243614, fax +49 302024379, e-mail vv-ing@deges.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=152497-2015. Ref. n. A C23 240123 and A C22 240106. 19/15.



Permalink

Negotiated invitation to tender, deadline 20.01.2016, for technical equipment for 1,350 m-long twin tube Kuechen tunnel on the A44 motorway. For further information contact Hessen Mobil, attn Dezernat BA 2 (Mrs Buchholz/Mr Dittrich), Wiesbaden, tel +49 5617667257, fax +49 5617667481, e-mail natascha.buchholz@mobil.hessen.de. Tenders must be sent to Hessen Mobil, attn Mrs Yvonne Piana, Wiesbaden, tel +49 6113663421, fax +49 6113663435, e-mail vergabe.zentrale@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=447781-2015. Ref.n. 9j6-A44TunnelKüchenTTA. 01/16.




Permalink


The JV Osmo Anlagenbau/Siemens AG di Georgsmarienhütte secured the contract for the supply, turnkey installation and commissioning of the entire operational system of the  Kuechen tunnel. They are to supply equipment for new construction on the two tubes, retention basins, a pumping system, a pressure booster system, along with two premises and the interface for transmitting the data to the tunnel control center (TLZ) in Eschwege.

The 1,350 m-long twin tube Kuechen tunnel is on the A44 motorway. For further information contact Hessen Mobil, Kassel, tel +49 561/7667-0, fax +49 561/7667-151, e-mail vergabe.kassel@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=178591-2016. Ref.n. VG-0522-2015-0124. 21/16.




Permalink

Competitive procedure with negotiation, deadline 16.01.2018, for engineering services for the Boyneburg  tunnel (1.713 m, 1.682 m) on the  A44 motorway. Duration contract 34 months. Contact Deges, Berlin, tel +49 30-20243-222, fax +49 30-20243-791, email vergabe@deges.de.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=490128-2017.

Ref.n. AC22270115. 49/17.



Permalink

Open invitation to tender, deadline 29.08.2018, for the delivery, installation and commissioning of the operational equipment for the 4.2km Hirschhagen twin-tube tunnel on the A 44 motorway Kassel-Herleshausen. For bid documents https://vergabe.hessen.de/NetServer/TenderingProcedureDetails?function=_Details&TenderOID=54321-Tender-16324a0b4b3-4146aaf565114d06 where tenders must be sent. Duration of the contract is from 05/02/2019 to 13/09/2022. Contact Hessen Mobil, Kassel, tel +49 561 / 7667-0,  fax +49 561/7667-151, email  vergabe.kassel@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=252156-2018.

Ref. n. VG-0522-2018-0050. 24/18.



Permalink


Ed. Zublin AG, Direktion IU-Tunnelbau from Stuttgart secured the EUR182.92 million contract, excluding VAT, for the construction of section 3, AS Ringgau - AS Sontra-West on the  A44 motorway, the Boyneburg  tunnels (1.713 m, 1.682 m) are included. Contact Deges, Berlin, tel +49 30-20243-222, fax +49 30-20243-791, email vergabe@deges.de.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=276373-2018.


Ref.n. AC22270105. 26/18.




Permalink

Stredich Beratende Ingenieure GmbH & Co.KG from Bochum secured theEUR1.63 million contract, excluding VAT, for supplying the technical equipment in the Hirschhagen tunnel (4174 m/4204 m) on the  A44 Kassel-Herleshausen motorway. Contact Hessen Mobil – Strassen und Verkehrsmanagement Kassel, Kassel, tel +49 5617667424, fax +49 5617667151, email christian.richter@mobil.hessen.de. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=480606-2018.

Ref.n. 9j6-A44 TTA Hirschhagen. 44/18



Permalink

PORR Infra GmbH / PORR Bau GmbH / PORR Deutschland GmbH from Walsper secured the EUR31.48 million contract, excluding VAT, for the delivery, installation and commissioning of the operational equipment for the 4.2km Hirschhagen twin-tube tunnel on the A 44 motorway Kassel-Herleshausen. Contact Hessen Mobil, Kassel, tel +49 561 / 7667-0, fax +49 561/7667-151, email  vergabe.kassel@mobil.hessen.de. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=002601-2019.

Ref. n. VG-0522-2018-0050. 02/19.



Permalink

Competitive procedure with negotiation, deadline 04/08/2020, for the renewal of technical equipment in Wahlberg (550 m) and Hopfengarten (1015 m) tunnels on A44 Kassel – Herleshausen. For tender  documents click here and here. Tenders must be sent to https://vergabe.hessen.de.

Duration of the contract is from 14/12/2020 to 15/09/2025. Contact Hessen Mobil Straßen- und Verkehrsmanagement Kassel, Kassel, tel  +49 561/7667-424, fax +49 561/7667-151, email christian.richter@mobil.hessen.de. Ref.n. VG-0522-2020-0089. 28/20.




Permalink


SPIE OSMO GmbH from Georgsmarienhütte secured the EUR26.70 million contract, excluding VAT, for the supply of technical equipment for the Boyneburg  tunnel (1713 m, 1682 m) on the A44 motorway. Contact Deges, Berlin, tel +49 30-20243-222, fax +49 30-20243-791, email vergabe@deges.de.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378248-2022. Ref.n. AC22300105. 30/22. 



Permalink

Open invitation to tender, deadline 30/04/2024, for the construction of the 3.8 km and 4 lane motorway A44 Kassel-Herleshausen, including the twin tube Holstein tunnel (1,650 m) on the A44 motorway Kassel-Herleshausen. For further information please click here. Duration of the contract is 66 months. Contact DEGES, Berlin, tel +49 30-20243-222, email vergabe@deges.de. Visit https://ted.europa.eu/en/notice/-/detail/223314-2024 and https://ted.europa.eu/en/notice/-/detail/90902-2024. Ref. n. AC23330107. 16/24. 

  



Permalink