Turin/Lyon - Before the end of the Summer 2018 the tenders for the French section of the base tunnel TELT will be released. The bi-national co-operation program agreed by the two European Union States, are working to publish completely the 5.5 billion Euro of bids for the construction of the cross-border section of the Turin-Lyon by 2019. The technical-juridical evaluations are being completed in view of the publication of the tenders in the Official Journal of the EU. The tender for excavation of the base tunnel on the French side, worth EUR2 billion is expected to be confirmed by September. For further information please click here, fr/11 and it/80 for the tunnelbuilder archive. Also visit http://www.telt-sas.com and http://www.telt-sas.com/wp-content/uploads/2018/07/TELT_comunicato_precisazioni_30072018.pdf . 31/18.
25.11.2024 Austria
27.11.2024 Poland
28.11.2024 Austria
03.12.2024 Austria
05.12.2024 France
05.12.2024 Germany
06.12.2024 United States
09.12.2024 France
09.12.2024 Austria
12.12.2024 Belgium
12.12.2024 Switzerland
13.12.2024 Norway
13.12.2024 Germany
15.12.2024 Austria
09.01.2025 Switzerland
15.01.2025 Germany
17.01.2025 Spain