An international search is underway for a supplier to build the four massive Tunnel Boring Machines (TBMs) that will build Victoria’s biggest ever public transport project – the Metro Tunnel. The four TBMs needed for the $11 billion project will be more than 100 metres long, weigh up to 1,000 tonnes and be custom-built to grind through Melbourne’s unique ground conditions.
It will take up to 18 months to build the mammoth machines before they’re tested and shipped in segments to Melbourne. Click here and au/32 for tunnelbuilder archive. Visit https://www.premier.vic.gov.au/search-underway-for-mammoth-tunnel-boring-machines/.
44/17.
30.05.2025 Poland
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
05.06.2025 Italy
09.06.2025 Switzerland
13.06.2025 Norway
13.06.2025 Austria
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
04.07.2025 Norway
28.07.2025 Brazil