The cutter head of the more than 400-foot long TBM MaMaJo was lowered nearly 200 feet down Monday, Feb. 4, 2019. The machine will drill a 5-mile tunnel designed to protect rivers from sewer overflow and neighbourhoods from flooding. The project is part of 3RPORT (Three Rivers Protection and Overflow Reduction Tunnel). The tunnel will be operational in 2023.Click here for the video, here and us/122 for the tunnelbuilder archive. For further information also visit https://www.cityoffortwayne.org/visitors/218-tunnel-project-website.html. 06/19.
Links: https://www.wane.com/video/mamajo-cutterhead-lowered-into-tunnel-site_20190204171349/1754118667
https://tunnelbuilder.com/News/Mamajo-the-TBM-for-3RPORT.aspx
https://tunnelbuilder.com/Archive/Projects.aspx?&projectcode=us%2f122
07.04.2026 Austria
08.04.2026 Norway
09.04.2026 Germany
09.04.2026 France
14.04.2026 United States
23.04.2026 Sweden
24.04.2026 United Kingdom
24.04.2026 Switzerland
27.04.2026 Italy
27.04.2026 Switzerland
30.04.2026 Sweden
30.04.2026 Switzerland
04.05.2026 Slovakia
04.05.2026 Switzerland
21.05.2026 Bulgaria
04.06.2026 Switzerland
07.07.2026 Germany
31.12.2031 Germany