The cutter head of the more than 400-foot long TBM MaMaJo was lowered nearly 200 feet down Monday, Feb. 4, 2019. The machine will drill a 5-mile tunnel designed to protect rivers from sewer overflow and neighbourhoods from flooding. The project is part of 3RPORT (Three Rivers Protection and Overflow Reduction Tunnel). The tunnel will be operational in 2023.Click here for the video, here and us/122 for the tunnelbuilder archive. For further information also visit https://www.cityoffortwayne.org/visitors/218-tunnel-project-website.html. 06/19.
Links: https://www.wane.com/video/mamajo-cutterhead-lowered-into-tunnel-site_20190204171349/1754118667
https://tunnelbuilder.com/News/Mamajo-the-TBM-for-3RPORT.aspx
https://tunnelbuilder.com/Archive/Projects.aspx?&projectcode=us%2f122
15.10.2025 France
20.10.2025 Romania
21.10.2025 Slovakia
30.10.2025 Romania
30.10.2025 France
03.11.2025 Romania
05.11.2025 Germany
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 Switzerland
21.11.2025 Switzerland
27.11.2025 Switzerland
09.12.2025 Switzerland