After relaunching, TBM Grace has now successfully tunnelled
through the station box d-wall (western end). After spending five weeks at
Redcliffe Station, where she underwent scheduled maintenance and had her screw
conveyor replaced, TBM Grace is now on her way to Bayswater Junction.
This last leg of her tunnelling journey is 2.6km long and
she will be installing more than 1600 rings and going under the Swan River
before resurfacing on the other side. TBM Sandy is located less than 200m from
the Redcliffe Station wall, underneath Brearley Avenue, and is expected to
break through in late-June.
Click here and au/34 for tunnelbuilder archive. Visit https://www.forrestfieldairportlink.wa.gov.au/.
25/19.