From April 2016 to January 2018 Datwyler will deliver 20.236 M 38928 anchored gaskets to JV Acciona Ghella for the Oslo Follo Line in Norway. The tunnel(36.430 m) with an outer diameter 9.550 mm and inner diameter 8.750 mm, will be lined with rings composed of 6/1 segments. Each segment has a thickness of 400 mm and width of 1.800 mm. Read the press release and click here and no/86 for further information on the project. Also visit www.datwyler.com. 15/16.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland