From April 2016 to January 2018 Datwyler will deliver 20.236 M 38928 anchored gaskets to JV Acciona Ghella for the Oslo Follo Line in Norway. The tunnel(36.430 m) with an outer diameter 9.550 mm and inner diameter 8.750 mm, will be lined with rings composed of 6/1 segments. Each segment has a thickness of 400 mm and width of 1.800 mm. Read the press release and click here and no/86 for further information on the project. Also visit www.datwyler.com. 15/16.
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Switzerland
01.09.2025 Brazil
15.09.2025 Sweden