Construction of the largest expansion in Stockholm public transport since the Blue Line was built in the 70s began with a ceremonial starting blast in a rock cavern in Barkarby. The metro’s Blue Line is to be extended from Akalla to Barkaby, and from Kungstradgarden to Nacka in the southern suburbs. A brand-new Yellow Line will be built from Odenplan to Arenastaden and eventually a new line will also be built from Fridhemsplan to Alvsjo. For further information please click here and se/91 for tunnelbuilder archive and also visit https://nyatunnelbanan.sll.se/en/articles/bang-start-new-metro.
16/19.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden