Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

United States

United States, California - us/61

Rapid Transit

The VTA Board of Directors awarded to the Mott McDonald/PGH Wong Engineering Joint Venture (MMW) the EUR109.03million (USD125 million) General Engineering services contract for the VTA’s Phase II Project. The VTA’s Phase II Project is a 9.66 km (6-mile) extension of the BART subway into downtown San Jose and Santa Clara, utilizing an innovative single-bore tunnelling methodology that minimizes construction disruptions. The project will include 4 stations - with three underground and one above - a 8.05 km (5-mile) subway tunnel, two ventilation structures, and a maintenance facility. BART will be responsible to operate and maintain the extension after its completion. Contact Santa Clara Valley Transportation Authority, attn Ephraim Cadaing, San Jose (California), email ephraim.cadaing@VTA.org. Visit http://www.vta.org/News-and-Media/Connect-with-VTA/General-Engineering-Contract-Awarded-for-BART-Phase-II-Project#.XDw2gVxKjIU.

Ref.n. RFP S18088. 03/19.



Permalink