The joint venture of Salini Impregilo and Lane Construction Corporation (Salini Impregilo Group), wholly owned subsidiary of S.A. Healy Company, won the EUR176.27 million (USD188 million) design-bid-build contract for the construction of the Three Rivers Protection & Overflow Reduction Tunnel (3RPORT). The 3RPORT is a combined sewer overflow (CSO) tunnel project located in Fort Wayne, Indiana. It includes a deep rock tunnel (5.18 m in diamter), drop shafts and consolidation sewers to collect and convey CSO from eight locations along the St. Mary and Maumee Rivers. Once completed, the CSO tunnel system will reduce 90% of combined sewage overflows into the rivers, which occur during large rain storms. Work is expected to begin in the spring of 2017 and be completed by mid-2021. Visit https://www.salini-impregilo.com. 15/17.