Contract, value EUR7.4 million, awarded to jv of Sener, GPO and Inocsa for general work supervision at La Sagrera high speed train station in Barcelona. A second EUR7.3 million contract was awarded to a jv of Auding, Ayesa and Cicsa to supervise station construction. A third EUR5.8 million contract went to a jv of SGS Tecnos, Idom, Euro Geotecnica and Applus Norcontrol to supervise construction of the 220 m-long covered access from Puente de Bac de Roda to the station and a 780 m-long section from the station to the triangle railyard. All contract values exclude VAT. For project history since 1998 visit tunnelbuilder archive es/20. More from www.sener.es and www.adif.es. 38/10.